railroad.wikisort.org - Station

Search / Calendar

Stafford railway station is a major interchange railway station in Stafford, Staffordshire, England, and is the second busiest railway station in Staffordshire, after Stoke-on-Trent. The station serves the county town, as well as surrounding villages. The station lies on the junction of the Trent Valley Line, the Birmingham Loop/Rugby-Birmingham-Stafford Line, and the West Coast Main Line.

Stafford
Station frontage in 2022.
General information
LocationStafford, Borough of Stafford
England
Coordinates52.80359°N 2.12307°W / 52.80359; -2.12307
Grid referenceSJ918229
Managed byAvanti West Coast
Platforms5
Other information
Station codeSTA
ClassificationDfT category C1
History
Original companyGrand Junction Railway
Pre-groupingLondon and North Western Railway
Post-groupingLondon, Midland and Scottish Railway
Key dates
4 July 1837 (1837-07-04)Station opened
1844Rebuilt
1862Rebuilt
1962Current building opened
Passengers
2016/17 2.329 million
2017/18 2.338 million
2018/19 2.466 million
 Interchange 0.493 million
2019/20 2.591 million
 Interchange  0.472 million
2020/21 0.574 million
 Interchange  56,156
Location
Notes
Passenger statistics from the Office of Rail and Road

Stafford station also formerly served the now defunct Stafford to Uttoxeter and Stafford to Shrewsbury lines.

The current brutalist station building was built in 1962, and is the fourth station to have existed on this site. The interior of the station was refurbished in 2015, which allowed the station to have a new WHSmith store and an improved ticket office.


History


The railway station in 1960
The railway station in 1960

The first station was built by the Grand Junction Railway and opened in July 1837.[1]:32 It soon became inadequate and was replaced by a second station in 1844. A third station was built in 1862, which was eventually replaced by the current concrete Brutalist building in 1962, built as part of the modernisation programme which saw the electrification of the West Coast Main Line.[2][3]

Lines originally built by the Stafford and Uttoxeter Railway and the Shropshire Union Railways and Canal Company (to Shrewsbury) also used the station. The Stafford to Uttoxeter line closed to passenger traffic in 1939,[4] with the Shrewsbury line closing as part of the Beeching Axe in 1964.[5]

Following the rebuilding of the station between 1961 and 1962 by the architect William Robert Headley, Isabel, a narrow gauge engine built by local firm WG Bagnall, stood on a plinth on the opposite side of Station Road, at the junction of Railway Street, until it was removed in the mid-1980s. It is now on the Amerton Railway.[6]


Incidents and accidents


Two accidents have happened at Stafford since 1990:


The station today


There are five platforms in use at the station, all of which are accessible from either of the main lines that converge from the south.[9] Platform 1 is usually used for services to London Euston and platform 3 for services from London Euston towards Liverpool and Crewe. Platform 4 is usually used for trains towards Birmingham New Street and the West of England. Platform 5 is usually used for services towards Manchester and Wales. Finally, platform 6 is usually used for trains starting/terminating towards/from London Euston, Birmingham New Street, Northampton, Stoke-on-Trent, Crewe and Liverpool Lime Street.[10]

The Stafford Area Improvements Programme improved the track layout around the station so that trains are no longer bound to a platform based upon direction of travel and trains can now use any platform, regardless of direction.

Stafford station, looking south from the end of platform 3/4.
Stafford station, looking south from the end of platform 3/4.

Platform 6 used to be the terminus of the Chase Line, however it now terminates at Rugeley Trent Valley. The platform is also sometimes used for railtours, hence why the platform is split into 'a' and 'b' sections.

The former bay platform 2 is no longer used by passenger trains. When Virgin Trains operated the InterCity West Coast franchise, platform 2 served as a stable for their Class 57 rescue locomotives; this role is now redundant. Occasionally, the bay platform stables other locomotives from freight operators.

The westernmost platform, unofficially known as platform 7, was formerly used by Royal Mail to load mail from the sorting office next door to the platform. This practice has since ended and now the westernmost platform has been converted into a single goods line, with bi-directional operation. This was completed during the bank holiday weekend of 29–31 August 2015.[11]

In October 2012, Network Rail began refurbishment works at the station due to the poor condition of some of the structures. The work included resurfacing the platforms (platforms 1 and 3 had been completed before the works), improving surface and roof drainage, renewing the opaque glazing on the footbridge, installing new canopy roof covers on the platforms and some structural work on the platform supports.[12]

In June 2015, Virgin Trains unveiled £1 million plans to refurbish the entrance, ticket hall and foyer. The work started in November in the same year and was anticipated to be completed within 20 weeks. These were completed March 2016. The changes saw the number of ticket machines at the station double, WHSmith relocation of the travel centre to the current ticket purchasing area and Starbucks took the place of Pumpkin Café Shop. The cafe was also shortened to allow an increased size of the waiting area.[13][14]


Current facilities


Currently, the station has many facilities which are typical of those across the Avanti West Coast Network; this includes a ticket office, toilets, car park, coffee shop and newsagent.


Stafford Area Improvements Programme


The Stafford Area Improvements Programme by Network Rail aims to allow more trains to run and also aims to reduce journey times by removing key bottlenecks in the area around Stafford.[15]

The programme included large scale building works, north of Stafford station in Norton Bridge, Staffordshire, where a flyover was implemented to allow faster train services, and removed the need to slow down before entering the junction.

Other benefits of the programme, were the introduction of bi-directional signals at Stafford Station, which meant that trains can now use any platform, regardless of direction of travel.


Stafford resignalling


The resignalling aspect of the programme was completed over the bank holiday weekend of 29–31 August 2015. All platforms now have bi-directional signalling, and the goods loop is now operational.[16]

The resignalling programme meant that Stafford signal boxes would be closed, and trains would be controlled from the Rugby Rail Operating Centre (ROC). The last train was signalled from Stafford in the early hours of 29 August 2015, and the first train was signalled from Rugby ROC on the morning of 1 September 2015.[17]


Regular services


A 1902 Railway Clearing House diagram of railway junctions around Stafford
A 1902 Railway Clearing House diagram of railway junctions around Stafford
A southbound Virgin Trains express calling at Stafford in 2014.
A southbound Virgin Trains express calling at Stafford in 2014.

From the south, two branches of the West Coast Main Line meet here: the Trent Valley and the Birmingham lines. To the north, the trunk of the line continues towards Crewe, whilst the Manchester branch goes on to Stoke-on-Trent.

The station is currently served by frequent operators: Avanti West Coast, CrossCountry and London North Western). Usual off-peak services at Stafford follow a pattern such as the one below:


Southbound rail services



Northbound rail services


Other services which do not operate on a regular basis are also present at Stafford, including other Avanti West Coast services (e.g. towards Preston and Scotland).


Future services


Under current proposals, Stafford will be a part of the High Speed 2 network, via a 'Classic Compatible' junction, which will allow HS2 trains to operate to Stafford and further on towards Liverpool. This would shorten journey times from Stafford to London to an estimated 53 minutes.[18] Under current proposals, it is expected that an hourly service will operate in both directions; however, it is currently unclear if these services will terminate at Stafford or Liverpool.

In addition, under current plans, the HS2 depot will be north of Stafford in Yarnfield.

There have also been proposals to reintroduce services to terminate on the Chase Line, which was cutback to Rugeley Trent Valley in 2008 as well a significant increase in the frequency of local services using the additional capacity which will become available post HS2.[19]


References


  1. Drake, James (1838). Drake's Road Book of the Grand Junction Railway (1838). Moorland Reprints. ISBN 0903485257.
  2. Webb 2017, p. 50.
  3. Historic England. "Stafford station (1518610)". Research records (formerly PastScape). Retrieved 16 April 2017.
  4. Historic England. "Stafford and Uttoxeter Railway (77367)". Research records (formerly PastScape). Retrieved 16 April 2017.
  5. "Village was on track for by-pass". Staff Newsletter. 12 April 2014. Retrieved 16 April 2017.
  6. "Isabel - W.G. Bagnall No. 1491 - Amerton Railway". Amerton Railway. Retrieved 16 April 2017.
  7. "Railway Accident at Stafford" (PDF). railwaysarchive.co.uk. Health & Safety Executive. 5 January 1994. p. 4. Retrieved 16 April 2017.
  8. Stephen, Paul (2 March 2016). "The crash that began Railtrack's demise". Rail. No. 795. Peterborough: Bauer Media. p. 48. ISSN 0953-4563.
  9. Bridge, Mike (2013). Railway trac diagrams 4; Midlands and North West (3 ed.). Bradford-on-Avon: Trackmaps. p. 12B. ISBN 978-0-9549866-7-4.
  10. Webb 2017, p. 55.
  11. Webb 2017, p. 56.
  12. "A major improvement scheme at Stafford station is underway". Network Rail. Retrieved 21 April 2013.
  13. "Work begins on £1million project to revamp Stafford train station". Staffordshire Newsletter. 10 November 2015. Retrieved 16 April 2017.
  14. "IN PICTURES: Stafford railway station to undergo £1million overhaul". Express & Star. 18 June 2015. Retrieved 16 April 2017.
  15. "Stafford - Crewe rail enhancements".
  16. "Second phase of railway upgrade between Stafford and Crewe gets underway". 20 January 2014.
  17. Boyd-Hope, Gary (October 2015). "Time called on Stafford boxes No 4 and 5". The Railway Magazine. Vol. 161, no. 1, 375. Horncastle: Mortons Media Publishing. p. 91. ISSN 0033-8923.
  18. "Stafford 'HS2 hub' set to slash journey times from Black Country to London". www.expressandstar.com. Retrieved 29 December 2017.
  19. http://wmre.org.uk/media/14045/west-midlands-rail-report-final-version-jan-2019.pdf p. 31, 2026-2033 column

Sources


Webb, Jonathan (2017). "Focus on Stafford". Today's Railways UK. No. 185. Sheffield: Platform 5 Publishing. ISSN 1475-9713.


Further reading




Preceding station   National Rail   Following station
CrossCountry
Cross Country Network
London Northwestern Railway
London - Crewe
London Northwestern Railway
Liverpool-Birmingham
London Northwestern Railway
Liverpool-Birmingham
London Euston
Avanti West Coast
London-Liverpool
Lichfield Trent Valley
London Euston
Avanti West Coast
London-Manchester/Crewe
Lichfield Trent Valley
Lichfield Trent Valley
Avanti West Coast
London-Glasgow/North West
Rugby
Nuneaton or
Rugby
  Avanti West Coast
London-Blackpool
  Crewe
Disused railways
TerminusGreat Northern Railway
Stafford and Uttoxeter Railway
TerminusLondon and North Western Railway
Shropshire Union Railways



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии