Clapham Junction railway station (/ˈklæpəmˈdʒʌŋkʃən/[3]) is a major railway station and transport hub near St John's Hill in south-west Battersea in the London Borough of Wandsworth. It is 2miles 57chains (2.71mi; 4.37km) from London Victoria and 3miles 74chains (3.93mi; 6.32km) from London Waterloo;[4] it is on both the South West Main Line and Brighton Main Line as well as numerous other routes and branch lines passing through or diverging from the main lines at this station. Despite its name, Clapham Junction is not located in Clapham, a district situated approximately 1 mile (1.6km) to the south-east and is instead sited in Battersea.
Routes from London's south and south-west termini, Victoria and Waterloo, funnel through the station, making it the busiest in Europe[5][bettersourceneeded] by number of trains using it: between 100 and 180 per hour except for the five hours after midnight. The station is also the busiest UK station for interchanges between services,[6] and the only railway station in Great Britain with more interchanges than entries or exits.[7]
On 21 May 1838 the London and Southampton Railway became the London and South Western Railway (L&SWR), and opened its line from Nine Elms as far as Woking.
Details of roof support columns
The second line, initially from Nine Elms to Richmond, opened on 27 July 1846. Nine Elms was replaced in 1848 as the terminus by Waterloo Bridge station, now Waterloo. The line to Victoria opened by 1860. Clapham Junction opened on 2 March 1863, a joint venture of the L&SWR, the London, Brighton and South Coast Railway (LB&SCR) and the West London Extension Railway (WLER) as an interchange station for their lines.[8]
The railway companies, to attract a middle- and upper-class clientele, seized the nonindustrial parish calculating that being upon the slopes of Clapham's plateau would only reinforce this distinction, leading to a long-lasting misunderstanding that the station is in Clapham.[9][10]
A British Rail Class 73 with track workers maintaining the railway in 1986 under British Rail.
Discontinued proposals
A £39.5 million planning application from Metro Shopping Fund was withdrawn before governmental planning committee consideration on 20 May 2009.[n 1]
A 'Heathrow Airtrack' to reduce the 95-minute journey by tube and Gatwick Express to Gatwick and unite the Great Western Main Line with Heathrow, Gatwick and the South West Main Line was cancelled in 2011 following improvements to the 2005-built Heathrow Connect track from Hayes and Harlington and practical impediments, such as pressure for continued high-frequency services on the three deemed-'entrenched' semi-fast and slow services between Clapham Junction and Staines. Overground, the change would have been at Clapham Junction.[11]
Incidents and accidents
Clapham rail disaster
Main article: Clapham Junction rail crash
On the morning of 12 December 1988, two collisions involving three commuter trains occurred slightly south west of the station due to a defective signal. Thirty-five people died and more than 100 were injured.[12]
Track bombing
On the morning of 16 December 1991, a bomb ripped through tracks on one of the station's platforms, causing major disruption to the rail network. The Provisional Irish Republican Army (IRA) claimed responsibility.[13]
The Junction
This section does not cite any sources. (February 2015)
A 1912 Railway Clearing House map of lines around Clapham Junction.Clapham Junction in 2022
The station is named Clapham Junction because it is at the junction of several rail lines. The name is not given to any rail junction near the station which, without end-on intercompany junctions, are:
Falcon Junction at the south end of the station, where the West London Line (WLL) joins the Brighton Slow Lines
Ludgate Junction at the eastern end of the Windsor Line platforms to the WLL
Latchmere SW Junction connecting the WLL to the Windsor lines at Ludgate Junction.
Latchmere Main Junction connecting the WLL to the Brighton Line at Falcon Junction.
West London Extension Junction and Junction for Waterloo, relaid for Eurostar empty-stock moves from the Windsor Lines to the WLL.
Pouparts Junction where the low-level and high-level approaches to Victoria split.
The station today
This section needs additional citations for verification. (February 2015)
Each day more than 2,000 trains, over half of them stopping, pass through the station, more than through any other station in Europe.[14] At peak times up to 200 trains per hour pass through of which 122 stop. It is not the busiest station by number of passengers, most of whom (about 430,000 on a weekday, of which 135,000 are at rush hours) pass through. Interchanges make some 40% of the activity and on that basis too it is the busiest station in the UK.[15]
In 2011 the station had three entrances, all with staffed ticket offices, though only the south-east entrance is open 24 hours a day. The most heavily used of the three, this leads from St John's Hill via a small indoor shopping centre into a subway some 15 feet (4.6m) wide, that connects to the eastern ends of all platforms.
The north entrance, which has restricted opening hours, leads from the Winstanley Estate on Grant Road to the same subway.[16][17] The subway is crowded during rush hours, with the ticket barriers at the ends being pinch points.
The south-west entrance, also known as the Brighton Yard entrance, as the buildings still bear signage for the London, Brighton and South Coast Railway, has a more traditional appearance, with a Victorian station building set at the back of a large forecourt. This entrance leads to a very wide covered footbridge, which joins the western ends of all platforms. This entrance includes cycle parking and a taxi rank. It was re-opened in May 2011 as part of a wider programme of access improvements that included installing lifts to the platforms.[18]
There are public and disabled toilets at the south-west entrance. There are refreshment kiosks in the subway, on the footbridge and on some platforms; and a small shopping centre, including a small branch of Sainsbury's supermarket, in the south-east entrance.
British Transport Police maintain a neighbourhood policing presence,[19] whereas the Metropolitan Police Service and the part-Transport for London funded Safer Transport Command provides a police presence in the area outside the station.
On 9 December 2012 a new platform for the East London Line opened, creating an orbital railway around inner London.[20]
Overcrowding is most frequent in the often convenient but narrow cross-platform subway. Using this rather than the wide, elegant flying concourse for interchange, a visitors' eyes assessment of fabric and environment listed Clapham Junction in the most needy 10% of Department for Transport category B stations.
Platforms
The subway at Clapham Junction during the night.
The station has seventeen platforms, numbered 1 to 17.[21] In general, platforms 1 and 2 are used by London Overground trains, platforms 3–11 by South Western Railway trains, and platforms 12–17 by Southern trains. Non-stop Gatwick Express trains pass through platforms 12 and 13.
Platforms 1 and 2 are northeast-facing bay platforms connected to South London and West London Lines, used by London Overground services to and from Stratford and Dalston Junction. Usually, platform 1 is served by trains on the West London line, while platform 2 is used by services on the South London line, although this usage can be reversed.
Platforms 3 and 4 are through platforms on the Waterloo–Reading line towards London Waterloo.
Platforms 5 and 6 are through platforms on the Waterloo–Reading line towards Reading.
Platform 7 is a through platform located at a siding off the South West Main Line fast line towards London Waterloo, used by stopping trains.
Platform 8 is a through platform on the South West Main Line fast line towards London Waterloo, used by non-stop trains passing through this station.
Platform 9 is a through platform on the South West Main Line fast line towards Woking.
Platform 10 is a through platform on the South West Main Line slow line towards London Waterloo.
Platform 11 is a through platform on the South West Main Line slow line towards Woking.
Platform 12 is a through platform on the Brighton Main Line fast line towards London Victoria.
Platform 13 is a through platform on the Brighton Main Line fast line towards East Croydon.
Platform 14 is a through platform on the Brighton Main Line slow line towards London Victoria.
Platform 15 is a through platform on the Brighton Main Line slow line towards East Croydon.
Platforms 16 and 17 are platforms connecting the Brighton Main Line slow line and the West London Line, used by Southern services. Platform 16 is the northbound platform (towards Watford Junction) and platform 17 is the southbound platform (towards East Croydon). Platform 17 can also be used by some terminating London Overground services as well.
Sidings leading into railway sheds at the west of the station are located between platforms 6 and 7.
Because the platform gap is too wide at platform 8, it must not be used for stopping trains unless in an emergency.[22]
Services
All South Western Railway services from Waterloo pass through the station, as do Southern and Gatwick Express trains from Victoria. The West London line and South London line services of London Overground have Clapham Junction as one of the termini.
The typical off-peak service of more than 120 trains an hour comprises:
During peak hours on weekdays express services on the South West Main Line and outer suburban services to Alton and Basingstoke typically do not stop at the station.
In the 2010s, a Clapham Junction station was proposed as part of the Crossrail 2 project. A large underground station dug underneath the existing station was proposed to serve Crossrail 2 service.[23] Due to the COVID-19 pandemic, the project was indefinitely postponed in 2020, although the route has been safeguarded.[24]
The Northern line extension to Battersea Power Station was criticised for not extending to Clapham Junction. During the public inquiry into the extension in 2014, it was noted that although an extension to Clapham would be desirable, it was unnecessary to meet the needs of the Vauxhall Nine Elms Battersea regeneration area.[25] Additionally, it was noted that a further extension could overwhelm the extension, due to the high demand.[26] However, provision has been made for a future extension of the line to the station, with a reserved course underneath Battersea Park.[27][28][29]
Government and Network Rail funding for[clarification needed] in the early 2010s of £50million of improvements was granted.[30] This comprised an upgrade to the main interchange: new entrances and more retail.[31]
In a Network Rail study in 2015, it was proposed that platform 0 could reopen for 8-car operations of the West London Line.[32]
Connections
London Buses routes 35, 37, 39, 49, 77, 87, 156, 170, 219, 295, 319, 337, 344, 345, 639, 670, C3 and G1 and night routes N19, N31, N35 and N87 serve the station.[33][34]
Notes and references
Notes
The 2009 Metro Shopping company plan included a new entrance on St John's Hill, the straightening and extension of platforms 15 to 17, more ticketing facilities, step-free access to all platforms by 2011, a new step-free entrance on Grant Road, and a new 'high street' from St John's Hill to Falcon Road with retail space and arthouse cinema. Profitable immediate funding was planned via radical height 42-storey residential buildings above the station.
Lydall, Ross (21 May 2021). "First extension to London Underground this century to open in Sept". Evening Standard. Archived from the original on 21 May 2021. Retrieved 12 September 2021. Engineers have previously said that extending the Northern line to Clapham Junction could have overwhelmed the new route due.
Johnson, Boris; Darren, Johnson (8 October 2012). "Extension of Northern Line to Clapham Junction". Mayor's Question Time. Archived from the original on 11 September 2021. Retrieved 11 September 2021. There are no current plans to extend further to Clapham Junction; however it is a requirement that the extension be designed so that a further extension would be possible in the future.
Chris Green & Sir Peter Hall, Better Rail StationsArchived 22 November 2009 at the Wayback Machine, November 2009
"Archived copy"(PDF). cdn.networkrail.co.uk. Archived from the original(PDF) on 22 February 2018. Retrieved 1 August 2022.{{cite web}}: CS1 maint: archived copy as title (link)
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025 WikiSort.org - проект по пересортировке и дополнению контента Википедии