railroad.wikisort.org - Station

Search / Calendar

Stratford is a major multi-level railway station which rates as the busiest station in Britain,[17] serving the district of Stratford and the mixed-use development known as Stratford City, in the London Borough of Newham, east London. It is served by the London Underground, London Overground, Docklands Light Railway (DLR) and is also a National Rail station on the West Anglia Main Line and the Great Eastern Main Line, 4 miles 3 chains (6.5 km) from Liverpool Street. It is also the busiest station on the Tube network outside Travelcard Zone 1.

Stratford
Stratford Regional[1]
Stratford (London)[2]
The station's south entrance
Stratford
Location of Stratford in London Borough of Newham
LocationStratford
Local authorityLondon Borough of Newham
Managed byTransport for London[3]
OwnerNetwork Rail[3]
Station codeSRA
DfT categoryB
Number of platforms19 (17 in use)
AccessibleYes[4][5]
Fare zone2 and 3
London Underground annual entry and exit
2017 61.99 million[6]
2018 64.73 million[7]
2019 64.85 million[8]
2020 25.07 million[9]
2021 29.11 million[10]
DLR annual boardings and alightings
2017 8.809 million[11]
2018 9.647 million[12]
2019 10.453 million[13]
2020 8.757 million[14]
2021 9.977 million[15]
National Rail annual entry and exit
2016–17 42.252 million[16]
– interchange  3.873 million[16]
2017–18 40.077 million[16]
– interchange  4.556 million[16]
2018–19 41.206 million[16]
– interchange  4.635 million[16]
2019–20 41.912 million[16]
– interchange  4.882 million[16]
2020–21 13.985 million[16]
– interchange  1.746 million[16]
Key dates
20 June 1839Opened by ECR
4 December 1946Central line started
31 August 1987DLR started
14 May 1999Jubilee line started
Other information
External links
WGS8451.5422°N 0.0033°W / 51.5422; -0.0033
 London transport portal

On the Underground it is a through-station on the Central line between Mile End and Leyton, and it is the eastern terminus of the Jubilee line following West Ham. On the DLR it is a terminus for some trains and for others it is a through-station between Stratford High Street and Stratford International. On the Overground it is the terminus of the North London Line following Hackney Wick; on the main line it is served by Elizabeth line stopping services between Liverpool Street and Shenfield and by medium- and longer-distance services operated by Greater Anglia to and from numerous destinations in the East of England. There are also limited off-peak services operated by c2c connecting to the London, Tilbury and Southend line to Shoeburyness.

The station was opened in 1839 by the Eastern Counties Railway. Today it is owned by Network Rail and is in Travelcard zone 2/3.[18] To distinguish it from Stratford-upon-Avon in Warwickshire it is sometimes referred to as Stratford (London),[2] or as Stratford Regional to differentiate it from Stratford International, which is some 400 yards (370 m) to the north.[1] Stratford served as a key travel hub for the 2012 Olympic and Paralympic Games held in London.[19] By the most recent National Rail entry and exit figures, it is the busiest station in Britain.[20]


History



Early days: 1839–62


Stratford station was opened on 20 June 1839 by the Eastern Counties Railway (ECR) with the first station building being located on Angel Lane which crossed the line on an over-bridge to the east of the station. The Northern and Eastern Railway opened a section of its authorised line from Broxbourne to join the ECR at Stratford on 15 September 1840.[21] As well as a station, a railway works was built adjacent to the line to Broxbourne. This and the engine shed later expanded into the area to the west of the station which is now occupied by a shopping centre and Stratford International station.

The ECR tracks were originally set to a gauge of 5 ft (1,524 mm) on the recommendation of engineer John Braithwaite. At this time there was no legislation dictating the choice of gauge and indeed the directors favoured the Great Western Railway's broad gauge 7 ft (2,134 mm). Braithwaite persuaded the directors otherwise on the grounds of additional cost but recommended the 5 ft gauge in an effort to reduce wear on locomotive parts. This choice meant that the Northern & Eastern Railway who were planning to share the ECR line between Stratford and Bishopsgate were forced to adopt the same gauge.[22]

With the extension of the ECR in the early 1840s it became apparent that standard gauge 4 ft 8+12 in (1,435 mm) was a more realistic choice and subsequently between September and October 1844 the gauge conversion was carried out. At the same time the associated Northern & Eastern Railway was also converted.

New station buildings were built in 1847 replacing the original structure on Angel Road. These were located in the V between the Cambridge and Colchester lines and access was via Station Road.[23]

The line through the low level platforms first opened in 1846 as a goods only branch as far as Thames Wharf. The bridge under the main line was too low for many locomotives, so a number of engines were equipped with hinged chimneys in order they could operate the line.[24] On opening there was also a line that linked what is now known as the Great Eastern Main Line directly to the docks enabling through running from Colchester to Thames Wharf. The docks and associated railway networks expanded with passenger services to North Woolwich starting in 1847.[25]

There was an accident at Stratford station on 18 July 1846 when an up goods train ran into the back of a passenger train from Ipswich. There were 10 passengers seriously injured one of whom later died.[26]

In 1854 the newly opened London Tilbury and Southend Railway served Stratford joining the main line at Forest Gate Junction a few miles north. Their services generally served Fenchurch Street and were routed via the Bow Road route (although that station was not opened at this time) although some carriages were detached at Stratford for onward working to Bishopsgate. This practice was discontinued in 1856 as passengers preferred the more conveniently sited (for the city) Fenchurch Street.

In connection with the introduction of the new LTSR services a third line was built from Stratford to Bow Junction which was used by down Fenchurch Street services and a new platform face opened.[23]

It soon became apparent that congestion was a problem at Stratford and by 1856 permission was sought to build a line from Barking to Gas Factory Junction (Bow) which was opened in 1858. After that LTSR trains were no longer routed via Stratford.[27]

By 1855 there were links from both the low and high-level stations to the North London Line as well as a spur that enabled trains from Liverpool Street to North Woolwich to avoid Stratford altogether (although this served Stratford Market station) which was a short distance away. Services from the North London line normally started from Victoria Park and ran through to Stratford Market. This service operated from 1866 until 1874 and was operated by the GER and North London Railway in alternate years up until 31 October 1874.[28]

The North London Railway was also running through Stratford high level with two return trains per day from Hampstead Road (later renamed Chalk Farm) via Victoria Park and Forest Gate Junctions to Tilbury which commenced on 1 July 1855 and finished 30 September.[29]

Services to Loughton commenced on 22 August 1856 and used the Lea Valley platforms, leaving the main line at Loughton Branch Junction half a mile north of Stratford. Initially nine trains per day operated to Fenchurch Street (Bishopsgate on Sundays) on this route.[30]

By the 1860s the railways in East Anglia were in financial trouble, and most were leased to the ECR; they wished to amalgamate formally, but could not obtain government agreement for this until 1862, when the Great Eastern Railway was formed by amalgamation. Thus Stratford became a GER station in 1862.[31]


Great Eastern Railway: 1862–1923


The Loughton branch was extended to Ongar on 24 April 1865 and by 1874 there were a total of 40 trains each day (10 terminating at Loughton, 18 at Epping and 12 at Ongar) with most serving the newly opened Liverpool Street although a few peak hour services continued to serve Fenchurch Street.[32]

Even after LTSR services were routed away from Stratford in 1858 working was intense. Following an accident in 1866 the accident report noted that "Stratford needs complete re-arranging, extending and fitting with modern improvements for working points and signals, as in its present state it appears to be quite insufficient for the traffic that passes through it". Although one of the signal boxes had interlocking fitted soon after, the poor state of GER finances saw little further work until 1877 when a significant rebuilding of Stratford took place.

Another short-lived North London Railway service operated in September and October 1866, linking Chalk Farm with Barking (again routed via Victoria Park and Forest Gate Junctions). This service was withdrawn due to congestion, and one of the services was involved in a collision on 10 September 1866 with 20 passengers being injured.[29][33]

The 1877 rebuilding saw a number of changes made, which were:

During 1886 and 1887 improvements were made to the station buildings and the canopies extended.[23]

On 26 December 1886 a train was derailed at Stratford station as facing points had not been properly locked into position. Fortunately there was no loss of life.[34]

By 1889 traffic on the GER had grown to such an extent, that quadrupling the section from Bethnal Green to Bow Junction and from Maryland Point-Romford was proposed. Once again significant changes which were implemented between 1891 and 1893 and included:

In 1896 the low-level line was lowered under the main line so locomotives no longer required hinged chimneys.[24]

By July 1897 it was apparent that the decision not to include platforms on both Through lines was causing some operational difficulty. To address this a new platform serving the Up Through line was opened in 1900.

The Fairlop Loop opened on 1 May 1903 and services generally ran as an out and back circle from either Liverpool Street or Fenchurch Street. The routing of these services was Liverpool Street – Stratford – Ilford – Fairlop Loop – Woodford – Stratford – Liverpool Street) and Liverpool Street – Stratford – Woodford – Fairlop Loop – Ilford – Stratford – Liverpool Street in the reverse direction.[36]

Railway lines around Stratford in 1914
Railway lines around Stratford in 1914

On 1 January 1923 the GER became part of the London & North Eastern Railway.


London and North Eastern Railway: 1923–47


By the 1930s electric tramways were taking a lot of traffic from the railway and proposals were drawn up to electrify the lines from Liverpool Street to Shenfield using the 1500 V DC system. By 1938 the major contracts were let and work started. Despite the commencement of World War 2 in 1939 work continued on the scheme but the scheme was postponed in late 1940. In February 1946 the LNER announced work would recommence. On 5 October 1946 the new interchange platforms with the Central Line (see below) were opened.[37]

Central Line services started on 4 December 1946, extended from Liverpool Street station in new tunnels after being delayed due to the Second World War. The line was further extended to Leyton on 5 May 1947 and then to the former Great Eastern Railway branch lines to Epping, Ongar and Hainault progressively until 1957. Prior to this date trains to and from Epping and Ongar had used the currently numbered platforms 11 and 12 and diverged from the Broxbourne line about half a mile north of the station. Trains for the Hainault loop used either these platforms or the currently numbered platform 5 (up) or 8 (down) diverging from the Great Eastern Main Line at a junction between Ilford and Seven Kings which has since been redeveloped as part of the Ilford Carriage sheds.


British Railways: 1948–96


Stratford low level platforms in 1987
Stratford low level platforms in 1987

The nationalisation of Britain's railways saw the operation of Stratford station pass to British Railways Eastern Region. A new station building was designed by Thomas Bennett and opened in 1948.[38]

Progress on electrification that had been halted by the Second World War resumed after the end of hostilities. The line between Liverpool Street and Stratford was electrified from 3 December 1946, and the full electrification of the Shenfield line at 1500 V DC was completed in September 1949. The electric service between Liverpool Street to Shenfield was inaugurated on 26 September 1949 but services were run to steam timings with a number of steam trains still operating. The full electric service officially commenced on 7 November 1949 (although a full dummy run had taken place the previous day). Two days earlier services to Fenchurch Street via Bow Road were withdrawn.[39]

On 8 April 1953 a collision occurred in the Central Line tunnels just to the east of Stratford station.[40][41]

In 1960-61 the 1,500 V DC electrification to Shenfield line which had been extended to Southend and Chelmsford was converted to 6.25kV ac.[42]

In the autumn of 1980 conversion of the overhead electrification from 6.25kV ac to the standard supply of 25kV ac of the Liverpool St. to Shenfield line.[43]

The Docklands Light Railway opened on 31 August 1987 reusing redundant rail routes through the Bow and Poplar areas to reach the new Docklands developments on the Isle of Dogs. Initially the line used one of the south facing bays which had been built for the Fenchurch street via Bow Road service (but never used).


Privatisation era: 1996–present


The low-level station was substantially rebuilt in the late 1990s as part of the Jubilee Line Extension works, with a large new steel and glass building designed by Wilkinson Eyre that encloses much of the low-level station, and a new ticket hall. The old ticket hall, at the eastern end of the station and connected via a subway, has since been demolished. The Jubilee Line opened to passengers on 14 May 1999 as far as North Greenwich station, and to Green Park and Stanmore in November 1999.[44]

In April 2009 the North London Line platforms at Stratford moved to newly built high-level platforms 1 & 2 from the original low-level platforms 1 & 2, freeing the old platforms for the DLR's Stratford International service which opened in August 2011. After rebuilding the old platforms reopened as platforms 16 and 17.

With the great increase in services and passengers since the Second World War, Stratford has changed from a fairly busy junction into one of Britain's major rail interchanges.

With Crossrail a link will open between Stratford and Whitechapel in autumn 2022 to allow Elizabeth line trains to Heathrow and Reading via Paddington. Currently trains from Shenfield only run as far as Liverpool Street.


Station layout


A 360° view taken in October 2005 of the canopy structure housing the ticket hall. The high-level station is through the windows in the centre, the low-level station is on the right, with the gates to the Jubilee line (now removed) on the far left.
A 360° view taken in October 2005 of the canopy structure housing the ticket hall. The high-level station is through the windows in the centre, the low-level station is on the right, with the gates to the Jubilee line (now removed) on the far left.
The same view in August 2008. Note the new DLR platforms on the left, and the additional westbound Central line platform under construction through the windows in the left-centre.
The same view in August 2008. Note the new DLR platforms on the left, and the additional westbound Central line platform under construction through the windows in the left-centre.

High-level platforms


Stratford stations
Legend
Stratford International
DLR via Canning Town
High Speed 1
HL
Stratford
North London line
West Anglia Main Line
Great Eastern Main Line
Central line
DLR via Poplar
Jubilee line
LL
DLR via Canning Town
Stratford Market depot
Stratford High Street

The high-level platforms run at right angles to the low-level, roughly east–west. The Docklands Light Railway serving platforms 16 and 17 passes beneath the high-level station. Except for platforms 4A and 4B, access from the main station entrance is via subways, one of which links the Jubilee line platforms directly to platforms 3 and 5 to 10. Another subway, which had served the old entrance to the station, was re-opened in September 2010.[45]


Low-level platforms


These platforms are at ground level and run north–south. Platforms 13 to 16 are served by a footbridge (with lifts and escalators) from the main station entrance, while platform 17 adjoins directly onto the main station concourse.


Services


Different platform signage, clockwise from top left: on London Overground platforms, Docklands Light Railway, Jubilee line, and main line Greater Anglia
Different platform signage, clockwise from top left: on London Overground platforms, Docklands Light Railway, Jubilee line, and main line Greater Anglia

Stratford is a major rail hub with services operated by Greater Anglia, London Overground, the Elizabeth Line and London Underground on the Central and Jubilee Lines. The typical off-peak service in trains per hour (tph) is:

Operator/lineFrequency to destination
London Underground
Central line
9 tph to Ealing Broadway
9 tph to West Ruislip
3 tph to Northolt
3 tph to White City
6 tph to Hainault
3 tph to Newbury Park
3 tph to Woodford via Hainault
9 tph to Epping
3 tph to Loughton
London Underground
Jubilee line
12 tph to Stanmore
4 tph to Wembley Park
4 tph to Willesden Green
Elizabeth Line 8 tph to Paddington
8 tph to Shenfield
London Overground 4 tph to Richmond
4 tph to Clapham Junction
Docklands Light Railway 12 tph to Canary Wharf via Poplar
8 tph to Stratford International
8 tph to Woolwich Arsenal via London City Airport
Greater Anglia 7 tph (+ 1 tph to set down only) to London Liverpool Street
3 tph to Southend Victoria
2 tph to Bishop's Stortford
2 tph to Meridian Water
1 tph to Norwich (pick up only)
1 tph to Braintree
1 tph to Clacton-on-Sea
1 tph to Colchester Town
1 tph to Ipswich
c2c (weekends only) 2tph to Shoeburyness
2tph to Liverpool Street
Preceding station London Underground Following station
Mile End Central line Leyton
West Ham
towards Stanmore
Jubilee line Terminus
Preceding station DLR Following station
Pudding Mill Lane
towards Lewisham
Docklands Light Railway Terminus
Stratford International
Terminus
Stratford High Street
Preceding station London Overground Following station
Hackney Wick North London Line Terminus
Preceding station Elizabeth line Following station
Whitechapel
towards Paddington
Elizabeth line Maryland
towards Shenfield
Liverpool Street
Terminus
Preceding station National Rail Following station
London Liverpool Street
Greater Anglia
Great Eastern Main Line
TerminusGreater Anglia
Temple Mills Branch Line
London Liverpool Street
c2c
Connection to LTS Line
(Limited services)
Barking
Disused Railways
Coborn Road for Old Ford
Line open, station closed
  Great Eastern Railway
Great Eastern Main Line
  Maryland Point
Line and station open
  Great Eastern Railway
Lea Valley Lines
  Lea Bridge
Line and station open
  Great Eastern Railway
Eastern Counties Railway
Loughton branch
  Leyton
Line closed, station open
Ilford   Great Eastern Railway
Hall Farm Curve
  Lea Bridge
Coborn Road for Old Ford    
Bow Road   Great Eastern Railway
Bow Curve
  Terminus
Stratford Market   Great Eastern Railway
Palace Gates Line
  Lea Bridge
Coborn Road for Old Ford    
Hackney Wick   Silverlink
North London Line
  West Ham
Highbury & Islington   Anglia Railways
London Crosslink
  Romford

Electrification


All lines at Stratford are electrified, although a few passenger and freight services which pass through this station are hauled by diesel locomotives. At one time there were four different systems of electrification in use, a record for any station in London. However, since the diversion of the North London Line from the low-level to the new high-level platforms these trains have changed the electrical system they use while at this station. The remaining systems used are:

In 1949 the Great Eastern Main Line through Stratford was electrified at 1500 V DC overhead before being converted to 6.25 kV AC 50 Hz overhead in 1960 and converted again to 25 kV in about 1976.[50]


Geography



Channelsea River


The Channelsea River is a culverted major tidal stream that is one of the Bow Back Rivers that flow into the Bow Creek part of the River Lea. It flows under Stratford station and rises along the Jubilee line platforms to the south. It was diverted in the 19th century by the Great Eastern Railway and again during construction of the Jubilee Line platforms in the 1990s.[citation needed]


Nearby facilities



Goods facilities


There were three primary goods facilities in the Stratford area in the steam age, although the nearby Stratford Works and engine shed generated their own traffic. A short distance to the north of Stratford station (on the line to Cambridge) there were marshalling yards at Temple Mills. There was a small goods yard north of the station on the east side of the line which occupied a constrained site. The mainstay of traffic was domestic coal although shortly before closure in the 1960s the site was used as a reception point for concrete components for the building of tower blocks in Newham.[51]

There was a small depot at Carpenters Road about a quarter of a mile south of Stratford station. Opened in 1900, the depot consisted of four long sidings and primarily dealt with coal and building materials. It was closed on 7 December 1964.[52]

There was a large depot at Stratford Market railway station. All of these three facilities were operated by the Great Eastern Railway up until 1923 before being taken over by the London & North Eastern Railway until nationalisation in 1948 when they became part of British Railways Eastern Region.

There was also a goods terminal at Bow operated by the Midland Railway which is still open today mostly for building materials. This yard operated as the terminal for building materials for the adjacent Olympics site.[53]

Between Stratford and Maryland stations Windmill Lane cattle pens existed on the down side of the line whilst four private sidings belonging to Young & Martens were located on the up side.

During the 1960s part of the Stratford Works site was converted to the London International Freight Terminal (LIFT) which opened in 1967 and there was a freight liner terminal that operated on the far side of the Stratford railway complex (on the Channelsea Loop line) between 1967 and 1994. The former site is now occupied by the international station and shopping centre.[54][55]


Stratford International


The nearby Stratford International station opened on 30 November 2009 (for preview services only). Since 13 December 2009 Southeastern began its full domestic high-speed service between London St Pancras, directly to Ebbsfleet International[56] and Ashford in Kent. The Docklands Light Railway 'Stratford International' extension has provided a link between the two stations since 31 August 2011.[57] There is also a walking route between the two stations passing through Westfield Stratford City Shopping Centre.

Despite Stratford International's name, no international trains call there, and Eurostar (currently the only international operator) has no plans to do so. Passengers instead interconnect on high-speed trains travelling to either London St Pancras or Ebbsfleet in Kent, there are a number of other potential operators that may use the station for international services. These include Deutsche Bahn's proposed London-Frankfurt/Amsterdam service.[58]


Stratford City


In preparation for the Olympics and the Stratford City development, a new north-facing exit and ticket hall has been built. Both existing passenger subways have been extended north to connect with the ticket hall, and the abandoned subway at the eastern end of the station, which formed part of the old station complex, has been reopened and refurbished to allow interchange between platforms 3–12 and the new high-level platforms 1 & 2.[59] A new pedestrian bridge has also been built to connect Stratford shopping centre with the Stratford City development. This also connects the mezzanine-level ticket hall with the northern one. The northern ticket hall and the footbridge opened along with Westfield Stratford City on 13 September 2011.


Bus stations


Stratford bus station is to the south of the station and Stratford City bus station is to the north. Both are served by bus services right across London and to the Queen Elizabeth Olympic Park.


Future proposals


Stansted Express may call at Stratford in the future via the West Anglia Main Line, reconnecting the two to each other.[60][may be outdated as of May 2022]

The Hall Farm Curve link could be reinstated allowing a Liverpool Street to Chingford service via Stratford. Designs for new services have been suggested to reduce journey times between Chingford and Stratford to 20 minutes, and high-frequency journeys between Walthamstow Central and Stratford to 12 minutes from the current duration of about 35 minutes.[61][may be outdated as of May 2022]


References


  1. "Stratford Regional Station". London 2012 Olympic Organising committee. Archived from the original on 2 December 2009. Retrieved 14 December 2009.
  2. "Station Facilities: Stratford". National Rail Enquiries. 26 November 2009. Archived from the original on 5 January 2010. Retrieved 11 December 2009.
  3. "Sub-committee Minutes". Rail & Underground Sub-committee. London TravelWatch. 16 May 2006. Archived from the original on 10 December 2006. Retrieved 8 December 2009.
  4. "Step free Tube Guide" (PDF). Transport for London. April 2021. Archived (PDF) from the original on 15 May 2021.
  5. "London and South East" (PDF). National Rail. September 2006. Archived from the original (PDF) on 6 March 2009.
  6. "Multi-year station entry-and-exit figures (2007–2017)". London Underground station passenger usage data. Transport for London. January 2018. Archived from the original (XLSX) on 31 July 2018. Retrieved 22 July 2018.
  7. "Station Usage Data" (CSV). Usage Statistics for London Stations, 2018. Transport for London. 21 August 2019. Archived from the original on 22 May 2020. Retrieved 27 April 2020.
  8. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
  9. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.{{cite web}}: CS1 maint: url-status (link)
  10. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.{{cite web}}: CS1 maint: url-status (link)
  11. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2017. Transport for London. 23 September 2020. Retrieved 9 January 2022.
  12. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2018. Transport for London. 23 September 2020. Retrieved 9 January 2022.
  13. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Retrieved 9 January 2022.
  14. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 9 January 2022.
  15. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.{{cite web}}: CS1 maint: url-status (link)
  16. "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
  17. "Estimates of station usage | ORR Data Portal".
  18. Archived 18 October 2015 at the Wayback Machine Stratford to be 're-zoned' to bring its three stations into transport zones 2/3. 21 July 2014. Retrieved 10 November 2015
  19. London 2012: Stratford Regional station Archived 16 September 2010 at the Wayback Machine. Retrieved 9 September 2010.
  20. "London Stratford emerges as UK's busiest station". BBC News. 25 November 2021. Retrieved 25 November 2021.
  21. White, H.P. (1987). Thomas, David St John (ed.). A Regional History of the Railways of Great Britain – Volume 3: Greater London (3rd ed.). Dawlish: David & Charles.
  22. Brooks, Lyn (October 1993). "Broad gauge on the Eastern Counties Railway". Great Eastern Journal: 34.
  23. Kay, Peter (1996). Great Eastern in Town and Country Vol 3. Clophill, UK: Irwell Press. p. 18. ISBN 1-871608-74-0.
  24. Brooks, Lyn D; Watling J; et al. (1987). Return to North Woolwich. North Woolwich: PEMT/Great Eastern Railway Society. p. 4. ISBN 0-906123-09-7.
  25. Brooks, Lyn D; Watling J; et al. (1987). Return to North Woolwich. North Woolwich: PEMT/Great Eastern Railway Society. pp. 24–25. ISBN 0-906123-09-7.
  26. Cock, Chris; Roger Farrant (August 2006). "Hall's panel signals on the ECR". Great Eastern Journal. 128: 128.20.
  27. Connor, J. E. (1998). Fenchurch Street to Barking. Midhurst UK: Middleton Press. p. x. ISBN 1-901706-20-6.
  28. Borley, H V (1993). The memories and writings of a London railway man. Mold: Railway & Canal Historical Society. p. 76. ISBN 0-901461-16-4.
  29. Borley, Harold V (1993). The memories and writings of a North London Railwayman. Clwyd, UK: Railway and Canal History Society. p. 77. ISBN 0-901461-16-4.
  30. Jackson, Alan A (1999). London's Local Railways (Second ed.). Harrow Weald UK: Capital Transport Publishing. p. 382. ISBN 1-85414-209-7.
  31. Vaughan, Adrian (1997). Railwaymen, Politics and Money. London: John Murray. pp. 134, 135. ISBN 0-7195-5150-1.
  32. Jackson, Alan A (1999). London's Local Railways (Second ed.). Harrow Weald UK: Capital Transport Publishing. pp. 384, 387. ISBN 1-85414-209-7.
  33. Kay, Peter (1996). London,Tilbury & Southend Railway. Teignmouth, United Kingdom: Peter Kay. p. 40. ISBN 1-899890-10-6.
  34. Vosiey, F (July 1986). "Accidents on the Great Eastern part 13". Great Eastern Journal: 47.21.
  35. Kay, Peter (1996). Great Eastern in Town and Country Vol 3. Clophill, UK: Irwell Press. pp. 18, 19. ISBN 1-871608-74-0.
  36. Jackson, Alan A (1999). London's Local Railways (Second ed.). Harrow Weald UK: Capital Transport Publishing. pp. 395, 396. ISBN 1-85414-209-7.
  37. Baker, John (April 1992). "The Great Eastern Section electrification part 1". Great Eastern Journal: 70.9–70.12.
  38. Lawrence, David (2018). British Rail Architecture 1948-97. Crecy Publishing Ltd. p. 18. ISBN 9780860936855.
  39. Baker, John (July 1992). "The Great Eastern Section electrification part 2". Great Eastern Journal: 71.8–71.9.
  40. McMullen, D.; London Transport Executive (October 1953). Ministry of Transport (ed.). Report on the Collision which occurred on 8th April 1953 near Stratford on the Central Line (PDF). Railway Accidents (Report). Her Majestry's Stationery Office.
  41. "Tube Train Crash – Stratford" (black & white newsreel). Pathé News. 1953. Archived from the original on 4 June 2012. Retrieved 12 June 2012.
  42. Cowley, Ian (1987). Anglia East. Newton Abbot: David & Charles. p. 11. ISBN 9780715389782.
  43. Cowley, Ian (1987). Anglia East. Newton Abbot: David & Charles. p. 59. ISBN 9780715389782.
  44. Horne, M: The Jubilee Line, page 79. Capital Transport Publishing, 2000.
  45. "Transport Big Build – Complete" (PDF). Olympic Delivery Authority. June 2011. p. 7. Archived from the original (PDF) on 1 December 2011. Retrieved 14 December 2011.
  46. London Overground: Statford Platform Changes Archived 18 January 2012 at the Wayback Machine (Information leaflet, TfL January 2009)
  47. "National Express West Anglia Timetable 18 – Cambridge/Bishop's Stortford to Stratford" (PDF). National Express East Anglia. December 2011. Retrieved 20 January 2012.
  48. "Stratford Station". Commission for Architecture and the Built Environment (CABE). Archived from the original on 18 January 2011. Retrieved 1 March 2008.
  49. "Stratford Station" (PDF). Archived from the original (PDF) on 7 October 2009. Retrieved 16 August 2009.
  50. Glover, John (2003). Eastern Electric, Ian Allan, London. ISBN 0-7110-2934-2.
  51. Watling, John (July 1984). "London Goods stations of the Great Eastern Railway Part 1". Great Eastern Journal (39): 12,13.
  52. Watling, John (July 1984). "London Goods stations of the Great Eastern Railway Part 1". Great Eastern Journal (39): 13.
  53. "Bow Midland Yard". London Reconnections. Archived from the original on 2 January 2014. Retrieved 31 December 2013.
  54. Brennand, D (2011). London's East End Railways. Nottingham UK: Booklaw publications. p. 8. ISBN 978-1-907094-74-3.
  55. Shannon, Paul (23 December 2015 – 5 January 2016). "Freightliner's 50 years". Rail. 790: 72.
  56. "Ebbsfleet interconnecting station for international trains". Archived from the original on 15 February 2015. Retrieved 30 June 2012.
  57. "Docklands Light Railway extension marks one year to go to the London 2012 Paralympic Games". Retrieved 31 August 2011.[dead link]
  58. Jameson, Angela (10 March 2010). "Deutsche Bahn may run London to Frankfurt service". The Times. London. Archived from the original on 29 June 2011. Retrieved 2 April 2010.
  59. "Stratford Station Upgrade: Proposed Subway Level Layout" (PDF). TfL. Archived (PDF) from the original on 4 June 2011. Retrieved 11 February 2009.
  60. "Stansted targets 40-minute train trip to London". Archived from the original on 2 July 2015.
  61. Curtis, Joe (26 June 2012). "CHINGFORD: Return of Hall Farm Curve to be 'seriously considered'". Waltham Forest Guardian. Archived from the original on 14 December 2012. Retrieved 1 October 2012.



На других языках


[de] Bahnhof Stratford

Der Bahnhof Stratford ist ein Bahnhof im Stadtbezirk London Borough of Newham und der wichtigste Verkehrsknotenpunkt im Nordosten von London. Hier verkehren die Central Line und die Jubilee Line der London Underground, die Docklands Light Railway, London Overground sowie Züge der Eisenbahngesellschaften Abellio Greater Anglia, TfL Rail und c2c. Auf Fahrscheinen der Eisenbahn wird der Bahnhof als Stratford (London) bezeichnet, um Verwechslungen mit Stratford-upon-Avon zu vermeiden. Im Jahr 2016 nutzten 67,05 Millionen U-Bahn-Fahrgäste den Bahnhof, hinzu kommen weitere 42,252 Millionen Fahrgäste der Eisenbahn.[1][2]
- [en] Stratford station

[ru] Стратфорд (станция)

Стратфорд (англ. Stratford) — это многоуровневая пересадочная станция лондонского метрополитена, которая обслуживает район Ньюэм. Пересадка на линии Лондонского метро (Центральная и Юбилейная), Доклендского лёгкого метро, Лондонского надземного метро (линия Северного Лондона  (англ.) (рус.), Great Eastern Main Line, c2c.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии