railroad.wikisort.org - Station

Search / Calendar

Marina Bay MRT station is an underground Mass Rapid Transit (MRT) interchange station on the North South (NSL), Circle (CCL) and Thomson–East Coast (TEL) lines in Singapore. Located in the Downtown Core district near Marina Bay, the station serves the Marina One Residencies, Marina Bay Suites and the Marina Bay Financial Centre.


 NS27  CE2  TE20 
Marina Bay
滨海湾
மரீனா பே
Marina Bay
Mass Rapid Transit (MRT) interchange and terminus
Exit A of Marina Bay station
General information
Location21 Park Street
Singapore 018925 (NSL)[1]
23 Park Street
Singapore 018926 (CCL)[2]
25 Park Street
Singapore 018929 (TEL)[3]
Coordinates1°16′33.95″N 103°51′16.83″E
Owned byLand Transport Authority
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)
  North South Line
  Circle Line
  Thomson–East Coast Line
Platforms6 (2 island platforms, 2 stacked platforms)
Tracks6
ConnectionsBus, taxi
Construction
Structure typeUnderground
Platform levels4
Bicycle facilitiesYes[4]
Disabled accessYes
History
Opened4 November 1989; 33 years ago (1989-11-04) (North South line)
14 January 2012; 10 years ago (2012-01-14) (Circle line)
13 November 2022; 7 days ago (2022-11-13) (Thomson–East Coast line)
ElectrifiedYes
Previous namesMarina South
Services
Preceding station Mass Rapid Transit Following station
Raffles Place
towards Jurong East
North South Line Marina South Pier
Terminus
Terminus Circle Line
Stadium Shuttle
Bayfront
towards Stadium
Prince Edward Road
Clockwise / outer
Circle Line
Future service
Bayfront
Anticlockwise / inner
Shenton Way Thomson–East Coast Line Gardens by the Bay
Terminus
Thomson–East Coast Line
Future service
Marina South
Location
Marina Bay
Marina Bay station in Singapore

Marina Bay station was one of the last stations to be completed in the early phases of the MRT network, opening on 4 November 1989. It was the terminus of the NSL until the line's extension to Marina South Pier station in 2014. The station became an interchange station with the CCL upon the completion of the two-station branch extension to this station from Promenade station in January 2012. The TEL station platforms were completed in November 2022 as part of TEL Stage 3, becoming another triple-line interchange on the MRT network.

The station features many forms of artwork as part of the MRT network's Art-in-Transit programme. An overhanging flower sculpture Flowers in Blossom II is displayed over the CCL mezzanine, the CCL platforms feature a series of photographs Train Rides on Rainy Days by Nah Yong En and the TEL station features a series of murals Walking Into The Interstitial by Tang Ling Nah.


History



North South Line


Interior images of the NSL station
NSL Platforms
NSL Concourse

The station, then named Marina South, was included in the early plans of the MRT network published in May 1982.[5] The first confirmation that the station would be among the Phase I stations (from Ang Mo Kio to this station) came in November that year.[6][7] This segment was given priority as it passed through areas that had a higher demand for public transport, such as the densely populated housing estates of Toa Payoh and Ang Mo Kio and the Central Area. The line aimed to relieve the traffic congestion on the Thomson–Sembawang road corridor.[8][9]

Civil Contract 310 for the construction of the 900-metre (0.56 mi) cut-and-cover tunnels, as well as Marina Bay MRT station, was awarded to a joint venture between Gammon and Antara Koh at a value of S$96.16 million (US$44.16 million) in April 1986.[10][11] The main challenges of the construction include tunnelling underneath the Telok Ayer Basin and building the station and tunnels in soft soil. Due to the soft marine clay, open excavation was not possible. Divers had to cut the 20-metre (66 ft) trenches for the MRT tunnels in zero visibility and very muddy water. A concrete base for the tunnels was then laid with the water pumped out for the tunnels and the station to be built on. The tunnels were then covered with another layer of concrete before the seabed was refilled.[12][13] During the construction, a World War II-era bomb was found at the work site. The Singapore Armed Forces (SAF) Bomb Disposal Unit was called and the bomb was safely detonated elsewhere.[14]

The station opened on 4 November 1989 and was the southern terminus of the North South line (NSL)[15] until the NSL extension to Marina South Pier station opened in 2014.[16] On 8 January 2006, this station was one of the four stations that participated in Exercise Northstar V.[17]


Circle Line


Interior images of the CCL station
CCL Platforms
Mezzanine level

An extension of the Circle line (CCL) to this station was first announced in April 2007.[18] Contract 901 for the construction and completion of Marina Bay CCL station was awarded to Hock Lian Seng Infrastructure Pte. Ltd. for S$348.4 million (US$246.24 million) in February 2008.[19][20] The scope also included addition and alteration works to the existing NSL station, road diversions of the East Coast Parkway and Marina Street and the demolition of a vehicular underpass.[21] Construction of the station started in February 2008 and was completed on schedule by January 2012.[22]

During the construction, the entrance (Exit A) to the station had to be relocated for construction works for the Circle line station.[23] As announced on 28 November 2011,[22] the station opened on 14 January 2012 as part of the two-station, 2.4-kilometre (1.5 mi) extension from Promenade, with an opening ceremony the day before.[24][25][26]

On 17 January 2013, transport minister Lui Tuck Yew announced that the CCL would be extended from Marina Bay station to HarbourFront station as part of CCL Stage 6.[27] Contract 886 for the construction of cut and cover tunnels at Marina Bay Area between the Prince Edward and Marina Bay stations was awarded to Koh Brothers Building & Civil Engineering Contractor (Pte.) Ltd. at S$255.4 million (US$184.9 million) in September 2017. Construction began in 2017, and was expected to be completed by 2025.[28][29] However, with the COVID-19 pandemic in Singapore, the completion date was pushed to 2026.[30]


Thomson–East Coast Line


Interior images of the TEL station
TEL Platform E
TEL Platform F
TEL Concourse

Marina Bay station was first announced to interchange with the 22-station Thomson line (TSL) on 29 August 2012.[31][32] Contract T226 for the design and construction of Marina Bay TSL Station and associated tunnels was awarded to Taisei Corporation at S$425 million (US$335.4 million) in February 2014. Construction started in 2014, with an expected completion date in 2021.[33][34]

On 15 August 2014, the Land Transport Authority (LTA) announced that Marina Bay station would be part of the proposed Thomson–East Coast line (TEL). The station will be constructed as part of Phase 3, consisting of 13 stations between the Stevens and Gardens by the Bay stations.[35][36] Ground freezing was applied for the first time in Singapore rail construction when building the TEL stacked tunnels and platforms, where it crosses underneath the existing NSL and CCL tunnels.[37][38] This is due to the layers of weak and strong old alluvium, which does not allow effective ground treatment of the soil. The construction of tunnels also involved close monitoring of the existing tunnels, especially as the piles supporting the NSL tunnels have to be cut off for the link way and mined tunnels.[39]

With restrictions imposed on construction due to the COVID-19 pandemic, the TEL3 completion date was pushed by a year to 2022.[40] On 9 March 2022, Transport Minister S. Iswaran announced in Parliament that TEL 3 would open in the second half of that year.[41] As announced during a visit by Transport Minister S. Iswaran at the Outram Park and Maxwell stations on 7 October 2022, the TEL station began operations on 13 November 2022.[42][43][44]


Details



Location


Marina Bay station is located near the eponymous Marina Bay underneath the junction of Bayfront Avenue and Park Street.[1][45] The station serves various developments, including Asia Square Towers 1 & 2, Marina One Residencies, Marina Bay Financial Centre, Singapore Conference Hall and V on Shenton, as well as cultural landmarks such as Red Dot Museum, Shenton House and Singapore Chinese Cultural Centre.[46] The station is also within walking distance to Downtown station on the Downtown line.[47]


Services


Marina Bay station is an interchange station on the NSL, CCL and TEL. Its official station codes are NS27/CE2/TE20. On the NSL, the station is located between Raffles Place and Marina South Pier stations.[48] NSL trains operate every 2–5 minutes from approximately 6:00 am (6:25 am on Sundays and Public holidays) to 11.30 pm for both directions.[49][50] The station is the terminus of the CCL's Marina Bay branch; the adjacent station is Bayfront station.[48] Shuttle services from Stadium station terminate at Marina Bay during off-peak periods.[51] The shuttle service operates every of 5–7 minutes from 6:00 am (6:24 am on Sundays and Public holidays) to 11:25 pm.[50] The station is between the Shenton Way and Gardens by the Bay station on the TEL,[48] with headways of 5–6 minutes.[52]


Design


The reflective pool at the station entrance
The reflective pool at the station entrance

Marina Bay station on the NSL was among the first nine underground MRT stations designated as a Civil Defence (CD) shelter.[53] As such, the station is structurally reinforced against bomb attacks with layers of earth-backed, air-backed and airtight walls and slabs.[54][55]

Aedas and Quarry Bay designed the CCL station[56] around the concepts of visibility, integration and efficiency.[57] Consequently, the station's entrances are integrated with the park around it.[58] There are also provisions for a future underground pedestrian network, to be converted from a temporary maintenance facility near the station, as well as connections to future developments.[59][57] The tracks leading to the defunct facility were removed in June 2021.[60]

The translucent entrance canopy and the large entrance are intended to maximise the amount of natural light entering the station.[61] Only the lift, escalators, the lightweight ETFE canopy and the reflective pool are visible from street level; this reduces the station's aesthetic impact on the park's landscape while giving passengers a full view of the park from the station entrance. The reflective pool was also intended to provide a smooth transition between the exits and the park.[57]

The station's design won the Small Project Award at the World Architecture Festival in 2012.[57][62] The station received numerous other awards, such as the Land Transport Excellence Awards 2012 (as the Best Design Rail / Road Infrastructure – Project Partner),[63] the 2013 UIPT Asia-Pacific Grow with Public Transport Award[64] and an honourable mention for the Singapore Institute of Architects Architectural Design Awards 2012.[65]

The station is wheelchair-accessible. The NSL station was built without accessible facilities, but it has been upgraded to include lifts, ramps and dedicated toilets for the disabled.[66] A tactile system, consisting of tiles with rounded or elongated raised studs, guides visually impaired commuters through the station,[67] with dedicated tactile routes connecting the station entrances to the platforms.[68] Wider fare gates allow wheelchair users to access the station more easily.[66][68] The TEL station also has green building features including inbuilt solar panels to minimise energy consumption.[69]


Artworks



Flowers in Blossom II


The sculpture Flowers in Blossom, by Tay Chee Toh, was originally hung underneath the dome of Orchard station.[70] Described as a "colourful twirl" of metal and plastic shapes,[71][72] the sculpture was disassembled after ION Orchard was constructed over Orchard station.[73] The recreated version, known as Flowers in Blossom II, is larger than the original version and was intended as a homage to the public artwork project predating the Art-in-Transit programme.[70]


August 9 babies


The gallery of 50 photographs at the NSL concourse
The gallery of 50 photographs at the NSL concourse

August 9 babies, a gallery of 50 photographs by Tay Kay Chin, was commissioned in advance of the 50th National Day, the anniversary of Singapore's founding.[74] The work originally contained 40 photographs as a tribute to the 40th anniversary of Singapore's founding, answering Tay's personal question of what it means to be a Singaporean.[75][76] The 40 photographs were of Singaporeans born on National Day, and Tay wondered if people born on that day have a stronger sense of patriotism.[74]

With this background, the LTA approached him to update the collection of photographs for the country's 50th National Day.[74][75] Tay revisited some of the people he had photographed; he said the most rewarding part was how much they had changed since, especially regarding their aspirations and challenges in living in Singapore.[74][76] The work took inspiration from Brian Lanker's I Dream a World and Ron Kovic's Born on the Fourth of July, both a compilation of portraits.[75] The subjects of the expanded project were chosen based on their gender, ethnic and occupation, representing Singapore's diverse demographics.[76]


Train Rides on Rainy Days


Train Rides on Rainy Days by Nah Yong En is a series of fourteen raindrop pictures displayed at the CCL platform. One side is themed to greenery, while the other reflects 'blue evenings', contrasting with the orange pillars of the station.[77] The raindrops in each picture produce inverted images of the area depicted.[78] Intended to bring "a refreshing element of nature" into the underground station, the work represents scenes seen by commuters as they gaze out of the window from a train whenever it rains.[70]

Nah had originally used the photographs as guides for his own paintings displayed at his graduation ceremony. The LTA architect Andrew Mead then recommended to the Art Review Panel that the station use Nah's set of photos. According to Nah, the work came from his fascination with looking out of the trains' windows, which he said not many commuters do.[78] The photographs for this project were reshot in higher quality using a new camera that could capture the raindrop up close, allowing it to look sharp against the blurred background.[79] Nah's main issue was taking the pictures under the right lighting conditions. The buildings would appear dark under rainy clouds if his camera was exposed to the sky, but the sky would appear washed out if the buildings were shot under better lighting conditions. To obtain the appropriate balance of light, Nah took his images during the short period after rain stopped falling.[80]

These photographs were taken along the North South and East West lines.[80] Initially, Nah's two paintings at the graduation ceremony were to be displayed with his raindrop images. However, the Art Review Panel felt the paintings did not complement the photographs well, so they were replaced by two additional images.[77]


Walking Into The Interstitial


The artwork displayed on the walls of the linkways connecting the three lines of the station
The artwork displayed on the walls of the linkways connecting the three lines of the station

Walking Into The Interstitial by Tan Ling Nah is a collection of charcoal sketches scanned and printed on vitreous enamel panels.[70] The sketches depict various urban spaces, including book alleys and roofs. They were merged to form surrealistic murals with the trompe l’oeil effect, giving the impression of a larger space.[81] These scenes were derived from Shenton Way, Cecil Street and Raffles Place, thus connecting the old financial district of Shenton Way with the new financial district of Marina Bay.[70]


References


  1. "Marina Bay MRT Station (NS27)". OneMap. Singapore Land Authority. Retrieved 15 November 2022.
  2. "Marina Bay MRT Station (CE2)". OneMap. Singapore Land Authority. Retrieved 15 November 2022.
  3. "Marina Bay MRT Station (TE20)". OneMap. Singapore Land Authority. Retrieved 15 November 2022.
  4. "Marina Bay – Amenities". SMRT Journeys. SMRT Corporation. Archived from the original on 1 November 2021. Retrieved 15 November 2022.
  5. "Proposed MRT stations". The Straits Times. Singapore Press Holdings. 23 May 1982. p. 1. Retrieved 12 December 2020 via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
  6. "Where the 14 North–South MRT stations will be". The Straits Times. Singapore Press Holdings. 30 November 1982. p. 7. Retrieved 31 July 2022 via NewspaperSG.
  7. "Exact locations of 14 stations". Business Times. Singapore Press Holdings. 30 November 1982. p. 1 via NewspaperSG.
  8. Annual report. Singapore: Provisional Mass Rapid Transit Authority. 1983. p. 5.
  9. Dhaliwal, Rav (29 August 1982). "North–south line off first". The Straits Times. Singapore Press Holdings. p. 1. Retrieved 19 December 2020 via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
  10. Soon Neo, Lim (8 April 1986). "Joint venture wins last big MRT deal". The Business Times. Singapore Press Holdings. p. 3. Retrieved 21 April 2020 via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
  11. Dhaliwal, Rav (8 April 1986). "Singapore firms get more than half MRT jobs". The Straits Times. Singapore Press Holdings. Retrieved 20 November 2022 via NewspaperSG.
  12. Dhaliwal, Rav (27 October 1986). "Divers to help build MRT tunnels". The Straits Times. Singapore Press Holdings. p. 10. Retrieved 21 April 2020 via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
  13. "Underground and UNDERWATER". The Straits Times. Singapore Press Holdings. 12 March 1988. p. 5. Retrieved 21 April 2020 via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
  14. "Bomb near MRT site". The Straits Times. Singapore Press Holdings. 7 November 1986. p. 16. Retrieved 21 April 2020 via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
  15. Dhaliwal, Rav. "East-enders get ticket to ride as MRT opens line". The Straits Times. Singapore Press Holdings. p. 23. Retrieved 21 April 2020 via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
  16. "Speech by Mr Lui Tuck Yew at the Visit to North-South Line Extension on 15 August 2014". Ministry of Transport. Archived from the original on 27 January 2021. Retrieved 21 April 2020.
  17. "Twenty-two agencies in Exercise Northstar V ready for action". Channel NewsAsia. Mediacorp. 3 January 2006. Archived from the original on 1 October 2007.
  18. "Government Approves Building Of The Downtown Line". Land Transport Authority. 27 April 2007. Archived from the original on 2 March 2012. Retrieved 8 November 2022.
  19. "List of contracts awarded for Downtown Line 1" (PDF). Land Transport Authority. Archived from the original (PDF) on 1 November 2015. Retrieved 16 November 2022.
  20. "Projects". Hock Lian Seng Group. Archived from the original on 27 January 2021. Retrieved 21 April 2020.
  21. "Award Of Contract For CCL Marina Bay Station". Land Transport Authority. Archived from the original on 31 December 2013.
  22. "Factsheet on Circle Line Extension". Land Transport Authority. 28 November 2011. Archived from the original on 2 December 2012.
  23. "Relocation of Marina Bay Station Entrance". Land Transport Authority. 27 May 2008. Archived from the original on 31 December 2013.
  24. "The extension on Circle Line opens with two events held concurrently at Bayfront Station and Esplanade Xchange". SMRT Corporation. Archived from the original on 22 April 2020. Retrieved 22 April 2020.
  25. "Speech by Mr Lui Tuck Yew at the Opening Ceremony of the Circle Line Extension on 13 January 2012". Ministry of Transport. Archived from the original on 4 September 2020. Retrieved 21 April 2020.
  26. Almenoar, Maria (14 January 2012). "Marina Bay, Bayfront stations open". The Straits Times. Singapore Press Holdings. p. 8.
  27. "Speech by Mr Lui Tuck Yew at visit to DTL1 Chinatown Station on 17 January 2013". Ministry of Transport. 17 January 2013. Archived from the original on 28 August 2021. Retrieved 16 April 2022.
  28. "LTA | News Room | News Releases | LTA Awards First Three Civil Contracts for Circle Line 6". Land Transport Authority. Archived from the original on 5 March 2020. Retrieved 21 April 2020.
  29. "First Circle Line 6 contracts worth S$1.75b awarded by LTA". Channel NewsAsia. Mediacorp. Archived from the original on 5 March 2020. Retrieved 21 April 2020.
  30. "Speech by Minister For Transport Mr Ong Ye Kung at MOT Committee of Supply Debate 2021 on A Tale of Three Connections". Ministry of Transport. Retrieved 8 March 2021.
  31. Sim, Royston (29 August 2012). "New Thomson MRT line to open from 2019, and have 22 stations". The Straits Times. Singapore Press Holdings. Archived from the original on 29 August 2012. Retrieved 30 June 2021.
  32. "Thomson Line to open from 2019 with 22 stations". Channel NewsAsia. Mediacorp. 30 August 2012. Archived from the original on 30 August 2012. Retrieved 30 June 2021.
  33. "LTA awards three Thomson MRT Line contracts worth $1.09 billion". The Straits Times. Singapore Press Holdings. 21 February 2014. Archived from the original on 13 February 2020. Retrieved 4 May 2020.
  34. "LTA Awards Three Contracts for Thomson Line's Sin Ming, Havelock and Marina Bay Stations". Land Transport Authority. 13 February 2020. Archived from the original on 4 May 2020. Retrieved 21 April 2020.
  35. "Joint News Release by the Land Transport Authority & Singapore Land Authority – Thomson–East Coast Line: New MRT Links in the East". Land Transport Authority. 19 August 2014. Archived from the original on 13 February 2020.
  36. "LTA | Upcoming Projects | Rail Expansion | Thomson–East Coast Line". Land Transport Authority. 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  37. Kenyon, Peter (2 July 2014). "Ground freezing first for Singapore rail project". TunnelTalk. Archived from the original on 18 December 2014. Retrieved 18 December 2014.
  38. "LTA | News Room | News Releases | Factsheet: Constructing Thomson–East Coast Line Marina Bay Station: Ground-Freezing Technology". Land Transport Authority. Archived from the original on 21 April 2020. Retrieved 21 April 2020.
  39. Sim, Zhan Rui. "Application of" (PDF). tucss.org. Land Transport Authority. Retrieved 16 November 2022.
  40. "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line". Ministry of Transport. Archived from the original on 17 May 2021. Retrieved 17 May 2021.
  41. "11 more Thomson-East Coast stations to open in second half of 2022; more 'inclusive' changes for vulnerable commuters". Channel NewsAsia. Mediacorp. 9 March 2022. Retrieved 26 April 2022.
  42. Yong, Clement (7 October 2022). "11 new TEL stations, from Stevens to Gardens by the Bay, to open on Nov 13; free rides on Nov 11". The Straits Times. Singapore Press Holdings. Retrieved 7 October 2022.
  43. "Factsheet: Thomson – East Coast Line Stage 3 to Open for Passenger Service from 13 November 2022". Land Transport Authority. Retrieved 7 October 2022.
  44. Yeoh, Grace (7 October 2022). "11 Thomson-East Coast Line stations to open on Nov 13; free rides available on Nov 11". Channel NewsAsia. Mediacorp. Retrieved 7 October 2022.
  45. "Marina Bay – Map". SMRT Journeys. SMRT Corporation. Archived from the original on 23 April 2022. Retrieved 15 November 2022.
  46. "Marina Bay – Exits". SMRT Journeys. Archived from the original on 13 November 2022. Retrieved 15 November 2022.
  47. "System Map (with walking time)". Land Transport Authority. 7 June 2019. Archived from the original on 7 June 2019. Retrieved 5 March 2022.
  48. "MRT System Map" (PDF). Land Transport Authority. Retrieved 15 November 2022.{{cite web}}: CS1 maint: url-status (link)
  49. "Transport Tools – MRT/LRT". Land Transport Authority. 6 May 2020. Archived from the original on 1 November 2019. Retrieved 19 June 2020.
  50. "Marina Bay – First and last train". SMRT Journeys. SMRT Corporation. Archived from the original on 15 November 2022. Retrieved 22 April 2020.
  51. "Annex: Circle Line Extension – train service information" (PDF). SMRT Corporation. Retrieved 15 November 2022.
  52. Kok, Yufeng (7 November 2022). "Opening of Thomson–East Coast Line Stage 3 to cut off-peak train intervals to 6 minutes". The Straits Times. Singapore Press Holdings. Retrieved 15 November 2022.
  53. "List of public CD shelters" (PDF). Singapore Civil Defence Force.
  54. MRTC 1984, p. B10.
  55. MRTC 1987, p. 125.
  56. "Marina Bay MRT Station". Aedas. 6 April 2016. Archived from the original on 14 October 2020. Retrieved 22 April 2020.
  57. "Marina Bay Station, Singapore, Republic of". World Buildings Directory. Archived from the original on 20 October 2012. Retrieved 6 July 2013.
  58. "LTA | Getting Around | Public Transport | Rail Network | Circle Line". Land Transport Authority. Archived from the original on 1 November 2019. Retrieved 22 April 2020.
  59. "Marina Bay MRT Station | Aedas". Archello. Archived from the original on 27 January 2021. Retrieved 22 April 2020.
  60. Toh, Ting Wei (15 April 2021). "Platform at Marina Bay station on Circle Line to be closed from May 15 to June 1". The Straits Times. Singapore Press Holdings. Retrieved 15 November 2022.
  61. Welch, Adrian (18 May 2012). "Marina Bay MRT Station: Singapore Circle Line Building". e-architect. Archived from the original on 13 October 2020. Retrieved 22 April 2020.
  62. "World Architecture Festival 2012 awards shortlist announced". Dezeen. 18 July 2012. Archived from the original on 6 May 2019. Retrieved 22 April 2020.
  63. "Land Transport Excellence Awards 2012". Aedas. 17 May 2016. Archived from the original on 26 September 2020. Retrieved 22 April 2020.
  64. "2013 UIPT Asia-Pacific Grow with Public Transport Award". Aedas. 17 May 2016. Archived from the original on 26 September 2020. Retrieved 22 April 2020.
  65. "The 12th SIA Architectural Design Awards". INDESIGNLIVE SINGAPORE | Daily Connection to Architecture and Design. 30 May 2012. Archived from the original on 29 September 2020. Retrieved 22 April 2020.
  66. "More MRT stops ready for disabled". The Straits Times. Singapore Press Holdings. 24 December 2002. p. 1. Retrieved 15 November 2022.{{cite news}}: CS1 maint: url-status (link)
  67. "Tactile Guiding System: Studs and Strips to Guide Your Way". Land Transport Authority. 30 July 2021. Archived from the original on 11 September 2021. Retrieved 11 September 2021.
  68. Cheong 2012, p. 149.
  69. "Thomson–East Coast Line 3: More City Adventures with TEL3" (PDF). Land Transport Authority. p. 6. Retrieved 15 November 2022.
  70. "Art in Transit". Land Transport Authority. Retrieved 15 November 2022.
  71. Choo, Jonathan (12 December 1987). "Reflections of our lifestyle". The Straits Times. Singapore Press Holdings. p. 4. Retrieved 10 September 2020 via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
  72. "$2m worth of art for six MRT stations". The Straits Times. Singapore Press Holdings. 5 December 1987 via NewspaperSG.
  73. Zhuang 2013, p. 16.
  74. Philomin, Laura (22 May 2015). "August 9 babies photo project revived for SG50". Today. Mediacorp. Retrieved 15 November 2022.
  75. "August 9 Babies". eastpix.com. 19 May 2021. Retrieved 15 November 2022.
  76. Gao, Wenxin (23 May 2015). "People born on Aug 9 tell their stories in SG50 photo project". The New Paper. Singapore Press Holdings. Retrieved 15 November 2022.
  77. Zhuang 2013, p. 183.
  78. Zhuang 2013, p. 180.
  79. Zhuang 2013, p. 180–182.
  80. Zhuang 2013, p. 182.
  81. Yong, Clement (29 October 2022). "Charcoal drawings, quirky book titles: 7 art works in Thomson–East Coast Line stations you should not miss". The Straits Times. Singapore Press Holdings. Retrieved 12 November 2022.

Bibliography







Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии