Toa Payoh MRT station is an underground Mass Rapid Transit (MRT) station on the North South line (NSL) in Toa Payoh, Singapore. Located in the town centre of Toa Payoh, it is integrated with the Toa Payoh Bus Interchange and the HDB Hub, headquarters of the Housing and Development Board. The station is underneath the intersection of three roads: Lorong1 Toa Payoh, Lorong2 Toa Payoh and Lorong6 Toa Payoh.
First announced in May 1982, construction of the station began in 1983 as part of PhaseI of the MRT system. In August 1985, it became the first MRT station in Singapore to have its concrete structure completed. It opened on 7 November 1987 and was one of the first MRT stations to operate in revenue service. It has a bright yellow scheme with a set of coloured tiles at the concourse level.
History
A plaque at the station commemorating the opening of the first phase of the Singapore MRT
Toa Payoh station was included in the early plans of the MRT network published in May 1982.[3] The first confirmation that the station would be among the Phase I stations (from Ang Mo Kio to Marina Bay) came in November that year.[4][5] This segment was given priority as it passed through areas that had a higher demand for public transport, such as the densely populated housing estates of Toa Payoh and Ang Mo Kio and the Central Area. The line aimed to relieve the traffic congestion on the Thomson–Sembawang road corridor.[6][7]
Contract 104 for the construction of the Toa Payoh and Novena stations was awarded to Tobishima–Takenaka Joint Venture in September 1983. The S$96.8million (US$45million in 2020) contract included the construction of 2.329 kilometres (1.447mi) of tunnels.[8][9] Construction of the tunnels between Toa Payoh and Novena began with a groundbreaking ceremony at Shan Road on 22 October 1983. This ceremony also marked the beginning of the MRT network construction.[10] The tunnels and the station had an expected completion date of early 1988.[11]
The station was constructed on the site of the Toa Payoh Central bus terminal, which was relocated to an adjacent site.[12] At Shan Road, the initial shaft was dug into a layer of sandstone. Tunnels were driven in either direction from that shaft. The composition of the ground was of either sandstone, granite, marine clay, or decomposed rocks. The sandstone sections had to be driven using a shield (with temporary shotcrete/mesh reinforcement). The granite sections had to be driven and also mined using explosives. The marine clay sections were constructed using cut-and-cover, and the decomposed rock sections used the New Austrian tunneling method (NATM).[13]
On 6 August 1985 Toa Payoh was the first MRT station to have its structural works completed, with the final bucket of cement poured into the station as part of the topping out ceremony.[14][15][16] Due to various soil conditions, in November 1985 the contractor requested an extension of eight months and additional monetary claims to construct the tunnels between the Novena and Toa Payoh stations.[17]
In January 1986 it was announced that the first section of the MRT system, from the Yio Chu Kang to Toa Payoh stations, would be opened in early 1988;[18] this was rescheduled to 7 November 1987 in an announcement in 16 September that year.[19][20][21] In an effort to familiarise people with the system,[22] the station hosted a preview from 10 to 11 October 1987.[23][24] During the preview, about 44,000 people visited the station.[25] However, no train services ran, much to the disappointment of many visitors. Many expressed excitement and curiosity, and many visitors bought tickets to take the MRT ride on the system's debut.[26]
On the opening day Toa Payoh was the most visited station on the newly completed line, with long lines outside the station by 11:00am.[27] At the opening ceremony, second deputy prime minister Ong Teng Cheong, who advocated for and commissioned the planning of the MRT system, attended the ceremony as a special Guest of Honour. Yeo Ning Hong, the Minister For Communications and Information, formally started MRT operations and announced it to be the "beginning" of the MRT system.[28] On the day, the emergency button was activated at Toa Payoh station just before 8:30pm, which halted trains for about half an hour along one of the two tracks leading to the station.[27]
On 8 January 2006 Toa Payoh station was one of four MRT stations which participated in Exercise NorthstarV, a mock counterterrorism exercise.[29] In July 2012, the Land Transport Authority (LTA) called for a tender to enhance the flood prevention measures (such as new flood barriers) at Toa Payoh station, along with eleven other MRT stations.[lower-alpha 1][30][31] From July 2012 to 2014, the escalator at ExitD (the pedestrian underpass linking to Lorong2 Toa Payoh) was replaced and upgraded.[32]
Toa Payoh serves the North South line (NSL) and is between the Braddell and Novena stations. The official station code is NS19.[33] Like all the stations of the NSL, the station is operated by SMRT Trains.[34] The station operates between 5:41am and 12:25am daily.[35] Train frequencies vary from 2.5 to 5.0 minutes.[36]
The station has four entrances serving the Toa Payoh area.[37] (Toa Payoh means "big swamp" in the Hokkien dialect. The name is a reference to the large swampy area which existed prior to the development of Chinese market gardens there.)[38][39] Surrounding landmarks include the Toa Payoh Bus Interchange, HDB Hub,[40] Toa Payoh Public Library, Toa Payoh Stadium, Toa Payoh Swimming complex and the CHIJ Primary and Secondary Schools. The station is also next to two churches: the Church of The Risen Christ and Toa Payoh Methodist Church.[1][37]
The station is underground, with a concourse on the upper level and the platforms on the lower level.[41] Like many stations on the initial MRT network, Toa Payoh has an island platform.[42] Toa Payoh is also one of the few stations on the initial network to have a double-height ceiling. The wide platforms and entrances were designed to accommodate huge crowds.[43]
Toa Payoh station has a bright yellow colour scheme for the pillars and canopies.[44] Along the 50-metre (160ft) concourse, the station features a "rainbow dressing" mural consisting of 15,000 tiles in various colours. The rainbow mural was intended to reflect the masses of people of various racial backgrounds moving together in harmony.[45]
As part of SMRT's Comic Connect, a public art showcase of heritage-themed murals, the station displays The Toa Payoh Story by James Suresh, Sayed Ismail and Suki Chong.[46] The artwork depicts various landmarks of the Toa Payoh area, including the dragon playground, Shuang Lin Monastery and the Toa Payoh Public library.[47] The mural includes the depiction of Seah Eu Chin, a businessman and landowner of the area.[46] As Toa Payoh was the first town developed by the Housing and Development Board, the artists intended for the mural to tie the area's significance to major milestones in Singapore's history.[48]
Notes
The other stations are Braddell, Boon Keng, Somerset, Outram Park, Tiong Bahru, Bugis, Lavender, Bishan, Marina Bay and Changi Airport.
Annual report. Singapore: Provisional Mass Rapid Transit Authority. 1983. p.5.
Dhaliwal, Rav (29 August 1982). "North–south line off first". The Straits Times. Singapore Press Holdings. p.1. Retrieved 19 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Wee, Agnes (16 September 1983). "Japanese win first MRT civil engineering contract". Business Times. Singapore Press Holdings. p.1. Retrieved 18 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Seah, Richard (6 September 1983). "Japanese likely to bag first two MRT jobs". Business Times. Singapore Press Holdings. p.1. Archived from the original on 19 December 2020. Retrieved 18 December 2020– via NewspaperSG.
John, Alan; Tan, Julie (23 October 1983). "Days of wine and promise". The Straits Times. Singapore Press Holdings. p.1. Archived from the original on 23 June 2022. Retrieved 23 June 2022.
"Work begins on the first part of MRT system". The Straits Times. Singapore Press Holdings. 29 October 1983. p.17. Retrieved 19 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
"The big dig starts in two months". The Straits Times. Singapore Press Holdings. 4 August 1983. p.7. Retrieved 18 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Mass Rapid Transit System: Proceedings of the Singapore Mass Rapid Transit Conference. Singapore: Mass Rapid Transit Corporation. 1987. p.264. ISBN9971-84-636-5. OCLC82363485.
"Toa Payoh MRT station first to be topped out". Business Times. Singapore Press Holdings. 6 August 1985. p.2. Retrieved 15 June 2017– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
"MRT nears half-way mark". The Straits Times. Singapore Press Holdings. 31 July 1985. p.8. Retrieved 18 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
"MRT builder claims additional cost". Business Times. Singapore Press Holdings. 16 November 1985. p.12. Retrieved 18 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
"The first residents to ride MRT trains". The Straits Times. Singapore Press Holdings. 14 January 1986. p.12. Retrieved 19 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Dhaliwal, Rav (16 September 1987). "MRT trains to roll on Nov 7". The Straits Times. Singapore Press Holdings. p.1 – via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Soong, Martin (16 September 1987). "MRT trains may start runs a month early". Business Times. Singapore Press Holdings. p.2. Retrieved 19 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
"MRT station tours from next month". The Straits Times. Singapore Press Holdings. 4 September 1987. p.19. Retrieved 19 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
"57,000 visit two stations over the weekend". The Straits Times. Singapore Press Holdings. 13 October 1987. Retrieved 18 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Dhaliwal, Rav (11 October 1987). "Thousands turn up for first look at MRT stations". The Straits Times. Singapore Press Holdings. p.14. Retrieved 19 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Dhaliwal, Rav; Michael, Lim (8 November 1987). "All aboard for the Subway Age". The Straits Times. Singapore Press Holdings. p.1. Archived from the original on 28 February 2022. Retrieved 12 September 2017– via NewspaperSG.
"Toa Payoh – Exits". SMRT Journeys. SMRT Trains. Archived from the original on 1 November 2021. Retrieved 19 December 2020.
"Toa Payoh". Housing & Development Board. Archived from the original on 19 December 2020. Retrieved 19 December 2020.
Savage, Victor (2013). Singapore street names: A study of toponymics. Singapore: Marshall Cavendish Editions. p.632. ISBN978-981-4408-35-6. OCLC868957283.
"HDB Hub". Housing & Development Board. Archived from the original on 29 October 2020. Retrieved 19 December 2020.
Wee, Agnes (21 October 1983). "Designs of two MRT stations". Business Times. Singapore Press Holdings. p.3. Retrieved 19 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Dhaliwal, Rav (28 April 1987). "Getting to know the network and how it will work". The Straits Times. Singapore Press Holdings. p.19. Retrieved 19 December 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Sajan, Chantal (29 February 2020). "Early stations' bare essentials". The Straits Times. Singapore Press Holdings. Archived from the original on 4 September 2020. Retrieved 19 December 2020.
Choo, Jonathan (12 December 1987). "Reflections of our lifestyle". The Straits Times. Singapore Press Holdings. p.4. Retrieved 10 September 2020– via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
Dhaliwal, Rav (1 March 1987). "Rainbow dressing at Toa Payoh station". The Straits Times. Singapore Press Holdings. p.3.