Orchard MRT station is an underground Mass Rapid Transit (MRT) interchange station on the North South and Thomson–East Coast lines, located on the boundaries of the Orchard and River Valley planning areas of Singapore.

 NS22  TE14 
Orchard
乌节
ஆர்ச்சர்ட்
Orchard
Mass Rapid Transit (MRT) interchange
Platform A of Orchard MRT station
General information
Location437 Orchard Road
Singapore 238878 (NSL)
301 Orchard Boulevard
Singapore 237974 (TEL)
Coordinates1°18′12″N 103°49′54″E
Owned byLand Transport Authority
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)
  North South Line
  Thomson–East Coast Line
Platforms4 (2 island platforms)
Tracks5 (including a track siding for the northbound TEL platform)
ConnectionsBus, Taxi
Construction
Structure typeUnderground
Platform levels2
ParkingYes (Ngee Ann City, Wisma Atria, Tangs, ION Orchard)
Disabled accessYes
History
Opened12 December 1987; 34 years ago (1987-12-12) (North South line)
13 November 2022; 5 days ago (2022-11-13) (Thomson–East Coast line)[1]
ElectrifiedYes
Previous namesOrchard Boulevard, Scotts[2][3]
Services
Preceding station Mass Rapid Transit Following station
Newton
towards Jurong East
North South Line Somerset
Orchard Boulevard Thomson–East Coast Line Great World
Location
Orchard
Orchard station in Singapore

Being the principal and one of the three MRT stations (the other two being Somerset and Dhoby Ghaut) that serve the popular shopping district along Orchard Road, Orchard station is one of the network's busiest stations. From 13 November 2022, Orchard station became an interchange with the Thomson–East Coast Line.[4]

Opened in 1987, Orchard station was part of the early plans for the original MRT network since 1982. It was constructed as part of Phase I of the MRT network. Following the network's operational split, the station has been served by the North South Line since 1989.


History


A former entrance to the station that existed from 1987 until 2006, later demolished due to construction of the ION Orchard shopping mall, with a newer entrance built into the mall.
A former entrance to the station that existed from 1987 until 2006, later demolished due to construction of the ION Orchard shopping mall, with a newer entrance built into the mall.
An entrance into Orchard MRT station adjacent to Tangs.
An entrance into Orchard MRT station adjacent to Tangs.

Prior to the construction of Orchard MRT station, it was named Scotts from 1967 to 1982, and then renamed to Orchard Boulevard. The station was subsequently renamed to Orchard in 1985. On 1 October 1983, the MRTC awarded the contract for the MRT tunnel from Newton to Somerset as well as Somerset MRT station to Borie SAE and Ong Chwee Kou Building Contractors Limited.[5]

On 10 May 1984, Orchard Turn, the existing slip road from Orchard Boulevard to Orchard Road, was realigned to facilitate MRT construction works.[6] On 27 April 1985, there was a MRT construction accident at Orchard MRT station which caused 15 workers to be treated for shock.[7]

The construction of the lifts began on 19 June 2002 and completed on 20 August 2004. The lifts from the concourse to the street level existed for a short while before it was replaced by another lift in October 2007 due to ION Orchard's construction. Additionally, on 29 October 2006, the bus stop on the right side of Orchard Boulevard was shifted to Orchard Turn.

On 15 January 2008, Exits C and E that connects to Wisma Atria and ION Orchard were closed, and reopened on 21 July 2009 due to the building works of ION Orchard. The western concourse, linked to Exit E and ION Orchard, opened on 20 July 2009 as part of the ION Orchard development.


Thomson-East Coast Line


An entrance to the TEL station under construction in early 2021.
An entrance to the TEL station under construction in early 2021.

On 15 August 2014, LTA announced that Orchard station would be part of the Thomson East-Coast line (TEL). The station will be constructed as part of Phase 3, consisting of 13 stations between Mount Pleasant and Gardens by the Bay.[8][9]

Contract T219 for the design and construction of Orchard Station and associated tunnels was awarded to Penta-Ocean Construction Co Ltd – Bachy Soletanche Singapore Pte Ltd Joint Venture at a sum of S$498 million in July 2014. Construction started that very year, with completion aimed at 2021.[10]

With restrictions imposed on construction due to the COVID-19 pandemic, the TEL 3 completion date was pushed by one year to 2022.[11] On 9 March 2022, Transport Minister S Iswaran announced in Parliament that TEL 3 would open in the second half of that year.[12]

The linkway between the TEL and NSL platforms was constructed using the pipe-roofing method, while the mining and underpinning method was adopted to construct the new box structure underneath the existing NSL station. Special drilling machines are being used, capable of drilling in all directions in a low headroom confined space. To minimise disruptions to the current NSL operations, mining works must be carried out strictly according to the approved design, sequence and method in a safe manner without compromising the stability and serviceability of existing surrounding structures.[13]

Unique to the station, is also an additional track siding built as part of the Thomson–East Coast Line platforms. Located alongside the northbound tracks, it is hidden by a concrete wall, allowing for a quick withdrawal and parking of trains heading northbound via the station. A similar feature was previously adopted in Mattar and Fort Canning MRT stations on the Downtown Line.

As announced during a visit by Transport Minister S. Iswaran at the Outram Park and Maxwell stations on 7 October 2022, the TEL station began operations on 13 November.[14][15][16]


Station details


Due to the station's location in the Orchard Road shopping belt, the station was intended to be the MRT system's showpiece, with S$24 million spent on aesthetic elements. The station's circular concourse has a dome 11 metres (36 ft) in diameter and an atrium design, and its floor consists of alternating granite tiles laid out in a radial arrangement.

To contrast with the concourse floor, burgundy red vitreous panels were installed on parts of the concourse wall, while other walls in the station concourse and at platform level were clad in polished blue granite tiles.[17]


References


  1. "11 Thomson-East Coast Line stations to open on Nov 13; free rides available on Nov 11". CNA. Retrieved 7 October 2022.
  2. "Names for 42 MRT stations". Singapore Monitor. 20 September 1984.
  3. "New names for eight stations". Singapore Monitor. 30 November 1982.
  4. "11 Thomson-East Coast Line stations to open on Nov 13; free rides available on Nov 11". CNA. 7 October 2022. Retrieved 7 October 2022.
  5. "Local firm gets a slice of MRT deal". The Straits Times. 1 October 1983. Archived from the original on 5 October 2017. Retrieved 5 October 2017.
  6. "New slip road at Orchard Bivd". Singapore Monitor. 11 May 1984.
  7. "MRT accident: 15 workers treated for shock". The Business Times. 27 April 1985.
  8. "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links in the East | Press Room | Land Transport Authority". www.lta.gov.sg. 19 August 2014. Archived from the original on 19 August 2014. Retrieved 13 February 2020.
  9. "LTA | Upcoming Projects | Rail Expansion | Thomson-East Coast Line". www.lta.gov.sg. 13 February 2020. Archived from the original on 25 December 2019. Retrieved 13 February 2020.
  10. "LTA Awards Four Contracts for Thomson Line". www.lta.gov.sg. 18 October 2013. Archived from the original on 7 January 2020. Retrieved 7 January 2020.
  11. "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line". mot.gov.sg. Archived from the original on 17 May 2021. Retrieved 17 May 2021.
  12. "11 more Thomson-East Coast stations to open in second half of 2022; more 'inclusive' changes for vulnerable commuters". CNA. 9 March 2022. Retrieved 26 April 2022.
  13. "LTA | News Room | News Releases | Factsheet: Thomson-East Coast Line's Orchard Station: Challenges in Constructing the Platform Link". www.lta.gov.sg. 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  14. Yong, Clement (7 October 2022). "11 new TEL stations, from Stevens to Gardens by the Bay, to open on Nov 13; free rides on Nov 11". The Straits Times. Retrieved 7 October 2022.
  15. "Factsheet: Thomson – East Coast Line Stage 3 to Open for Passenger Service from 13 November 2022". LTA. Retrieved 7 October 2022.
  16. Yeoh, Grace (7 October 2022). "11 Thomson-East Coast Line stations to open on Nov 13; free rides available on Nov 11". CNA. Retrieved 7 October 2022.
  17. "Orchard station will be $24 m showpiece". The Straits Times. Singapore. 12 November 1986. p. 13. Retrieved 12 May 2020 via NewspaperSG.





Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии