Shenton Way MRT station is an underground Mass Rapid Transit station on the Thomson-East Coast Line in Downtown Core, Singapore. It is located near Asia Square, Marina One, V on Shenton and Shenton House.
TE19
Shenton Way 珊顿道 ஷென்ட்டன் வே Shenton Way | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | |||||||||||
![]() Exit 2 of the station | |||||||||||
General information | |||||||||||
Location | 2 Park Street Singapore 018928 | ||||||||||
Coordinates | 1°16′39″N 103°51′03″E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | Thomson–East Coast Line | ||||||||||
Platforms | 2 (2 stacked platforms) | ||||||||||
Tracks | 2 | ||||||||||
Connections | DT17 Downtown NS27 CE2 TE20 Marina Bay Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Depth | 40m | ||||||||||
Platform levels | 5 | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opened | 13 November 2022; 5 days ago (2022-11-13)[1] | ||||||||||
Previous names | Asia Square/McCallum | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
![]() ![]() Shenton Way Shenton Way station in Singapore |
The station is named after the nearby Shenton Way, a major one-way street in the financial district of Singapore. Downtown and Marina Bay stations are within close proximity.
The station was first announced on 29 August 2012 as part of the Thomson line (TSL).[2][3] Contract T225 for the design and construction of this station and associated tunnels was awarded to Shanghai Tunnel Engineering Co. Ltd at S$368 million (US$274.6 million) in May 2014. Construction started in 2014, with an expected completion date of 2021.[4][5]
On 15 August 2014, the LTA further announced that the TSL would merge with the Eastern Region line to form the Thomson–East Coast line (TEL). Shenton Way station, part of the proposed line, would be constructed as part of TEL3, consisting of 13 stations between Mount Pleasant and Gardens by the Bay.[6][7] With restrictions imposed on construction due to the COVID-19 pandemic, the TEL3 completion date was pushed by a year to 2022.[8] On 9 March 2022, Transport Minister S Iswaran announced in Parliament that TEL 3 would open in the second half of that year.[9]
As announced during a visit by Transport Minister S. Iswaran at Outram Park and Maxwell stations on 7 October 2022, the TEL station will begin operations on 13 November.[10][11][12]
![]() | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|