railroad.wikisort.org - TrainThe Indian locomotive class WDAP-5 is a class of diesel-electric dual mode locomotive that was developed in 2019 by Banaras Locomotive Works (BLW), Varanasi for Indian Railways. The model name stands for broad gauge (W), Diesel (D), AC Current (A), Passenger (P) and 5000 Horsepower (5). The locomotive can deliver 6120 hp (9.4 MW) in electric mode and 4500 hp (3.4 MW) in diesel mode. This loco is under trials and the second unit of this series might roll out only in 2022.
Indian railway locomotive class
WDAP-5 |
---|
A dual mode locomotive WDAP-5 awaits for testing at BLW, Varanasi |
Type and origin |
---|
Power type | Dual-mode |
---|
Builder | Banaras Locomotive Works |
---|
Model | GT46PAC |
---|
Build date | 2019 - present |
---|
Total produced | 1 |
---|
|
Specifications |
---|
Configuration:
| |
---|
• UIC | Co-Co |
---|
Gauge | 5 ft 6 in (1,676 mm) |
---|
Fuel type | Diesel |
---|
Power supply | 25kv AC overhead wire |
---|
Current pickup(s) | Pantograph |
---|
|
Performance figures |
---|
Maximum speed | 150.8 km/h (Trials - Electric) [1] |
---|
Power output | 5500 hp (electric), 4500 hp (diesel) |
---|
|
Career |
---|
Numbers | 71000+ |
---|
Disposition | undergoing testing |
---|
|
Need for dual mode locomotive
Since 2016, Indian Railways has pushed for greater electrification of the railway network.[2] In this interest, the government, in 2019, approved plans for 100% electrification.[3] So far Indian Railways has electrified 52,247 route kilometers (RKM) that is about 80% of the total broad gauge network of Indian Railways (65,414 RKM, including Konkan Railway) by 31 March 2022.[4] Using electric locomotives allows the railways to save time by giving a faster acceleration and also saves fuel costs. However, these advantages are offset under certain circumstances where the route of the train is partly electrified. In such cases, trains used to run with a diesel locomotive in non-electrified sections and would be switched with an electric locomotive as soon as they enter an electrified section. Instead of the benefits of electrification, Railways observed a loss of punctuality in such trains due to valuable time being lost to switch between diesel and electric locomotives. To counter this, in August 2019, Railways issued a circular, asking all zones to haul trains with a diesel locomotive if their route was not completely electrified.[5] This meant that electrification of railway lines, unless completed end-to-end, did not provide any advantage. This problem had been identified by the Railways, way back in 2016, which is when RDSO was requested to study the feasibility of dual-mode locomotives as a stop-gap until 100% electrification was achieved.[6]
Locomotive shed
Zone of the shed | Name | Shed code | Quantity |
South Central Railway | Kazipet | KZJ | 1 |
Total locomotives active as of November 2022 | 1 |
Broad-gauge locomotives of India |
---|
Steam | BESA designs | |
---|
IRS designs | |
---|
World War II designs | |
---|
IGR standard designs | |
---|
| |
---|
Diesel | Mixed type | |
---|
Passenger | |
---|
Goods | |
---|
Shunting | |
---|
|
---|
DC electric | |
---|
AC electric | |
---|
Dual (AC and DC) electric | |
---|
Dual mode | |
---|
References
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии