The Metropolitan Transportation Authority is constructing a new commuter rail terminal for the Long Island Rail Road (LIRR) in the Midtown East neighborhood of Manhattan, New York City, as part of the East Side Access project. The new terminal, sometimes referred to as the LIRR's East Side station, started construction in 2008 and is estimated to open in 2022. It is located beneath Grand Central Terminal, which serves the MTA's Metro-North Railroad.[1]
Future Long Island Rail Road station in Manhattan, New York
Grand Central
Lower level passenger platform construction, 2019
General information
Owned by
Long Island Rail Road
Line(s)
Main Line
Platforms
4 island platforms
Tracks
8
Connections
Metro-North Railroad: Harlem, Hudson, and New Haven Lines MTA New York City Subway: trains at Grand Central–42nd Street NYCT Bus: M1, M2, M3, M4, M42, M101, M102, M103, Q32 MTA Bus, Academy Bus: express services
The Long Island Rail Road has terminated on the west side of Manhattan, at Penn Station and its predecessor, since 1910. The new terminal aims to ease congestion at Penn Station and decrease travel times for passengers going to and from the east side of Manhattan.
The new terminal will connect to the Metro-North Railroad's Harlem, Hudson and New Haven Lines, as well as the New York City Subway at Grand Central–42nd Street station.
Services
The project will connect Grand Central Terminal to the railroad's Main Line,[2] which connects to all of the LIRR's branches and almost all of its stations.[3] However, due to clearance restrictions in the 63rd Street Tunnel, the C3 bilevel coaches used in diesel territory will not be able to use the terminal, thus not allowing for direct trips to and from non-electrified portions of the system (e.g., to/from Oyster Bay or Port Jefferson), requiring passengers from diesel portions of the system to transfer.[4]
History
LIRR concourse construction, 201945th Street escalator, 2019
See also: East Side Access
The first proposals for Long Island Rail Road trains entering the east side of Manhattan date to 1963.[5] In 1968, the 63rd Street Tunnel and a new "Metropolitan Transportation Center" at 48th Street and Third Avenue were proposed for the LIRR as part of the Program for Action.[6] After people living near the proposed transportation center objected, the MTA's board of directors voted to use Grand Central as the terminal for the proposed LIRR route in 1977.[7] However, due to the 1975 New York City fiscal crisis, the LIRR project was postponed indefinitely before the 63rd Street Tunnel could be completed.[8]
The East Side Access project was restarted after a study in the 1990s that showed that more than half of LIRR riders work closer to Grand Central than to the current terminus at Penn Station.[9] Cost estimates jumped from $4.4 billion in 2004,to $6.4 billion in 2006,[10] then to $11.1 billion by 2017.[11][12] The new stations and tunnels are anticipated to begin service in December 2022.[10]
The MTA originally planned to build and open additional entrances at 44th, 45th, 47th, and 48th Streets.[13]:3[14][15]:5 The station would connect to existing entrances at Grand Central North. The new LIRR station would also contain entrances at 335 Madison Avenue, near the southeast corner with 44th Street; at 270 Park Avenue and 280 Park Avenue near 47th and 48th–49th Streets, respectively; and at 347 Madison Avenue, on the east side of the avenue at 45th Street. An entrance on 46th Street between Lexington and Park Avenue was also built, connecting with Grand Central North.[15]:5–6 However, the MTA later announced its intent to defer construction of an entrance at 48th Street because the owner of 415 Madison Avenue wanted to undertake a major construction project on the site.[15]:7 The MTA would also connect the new station to the existing 47th Street cross-passage.[13]:3[14] The escalators would be up to 180 feet (55m) long and descend more than 90 feet (27m). The escalators and elevators would be among the few privately operated escalators and elevators in the entire MTA system.[16]
In March 2022, "Grand Central Madison" was revealed to be one of the potential names for the station.[17]
The station will have an area of 350,000 square feet (33,000m2), including 120,000 square feet (11,000m2) for passengers and 25,000 square feet (2,300m2) of retail space.[18]
Concourse
The retail and dining concourse will be accessed from street-level or the Metro-North terminal via stairwells, 22 elevators, and 47 escalators.[19][20] The number of elevators in this terminal would exceed the 19 escalators in the remainder of the LIRR system combined.[16] Entrances to the LIRR terminal will exist from Grand Central Terminal's Dining Concourse and Biltmore Room. Additionally, the MTA plans to build and open new entrances to the LIRR station at 45th, 46th, and 48th streets.[21]
Platforms and tracks
LIRR trains will arrive and depart from the twin station caverns and through a tunnel that will sit 180 feet (55m) below Park Avenue and more than 90 feet (27m) below the Metro-North tracks.[22][23][24]
The LIRR terminal will add four platforms and eight tracks (numbered 201–204 and 301–304) in two bi-level caverns.[25] There will be four tracks and two platforms in each of the two caverns, and each cavern would contain two tracks and one platform on each level. A mezzanine will sit on a center level between the LIRR's two track levels.[26][27]
Reaching the street from the lowest new level, more than 175 feet (53m) deep, will take about 10 minutes.[22]
"LIRR Map". Metropolitan Transportation Authority. Retrieved February 2, 2019.
"Chapter 28: Comments and Responses on the Draft Environmental Impact Statement". East Side Access Environmental Impact Statement(PDF). mta.info. MTA Capital Construction. March 2001. Retrieved February 2, 2018.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025 WikiSort.org - проект по пересортировке и дополнению контента Википедии