Chestnut Hill station is a light rail station on the MBTA Green Line D branch, located off Hammond Street north of Massachusetts Route 9 in the Chestnut Hill neighborhood of Newton, Massachusetts. The station has two side platforms serving the line's two tracks. Chestnut Hill station is not accessible.
Chestnut Hill | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
An inbound train at Chestnut Hill station in 2015 | |||||||||||||
General information | |||||||||||||
Location | Hammond Street and Chestnut Hill Road Chestnut Hill, Massachusetts | ||||||||||||
Coordinates | 42°19′37″N 71°9′53″W | ||||||||||||
Line(s) | Highland branch | ||||||||||||
Platforms | 2 side platforms | ||||||||||||
Tracks | 2 | ||||||||||||
Construction | |||||||||||||
Parking | 69 spaces | ||||||||||||
Bicycle facilities | Covered racks | ||||||||||||
Disabled access | No | ||||||||||||
History | |||||||||||||
Opened | July 4, 1959[1] | ||||||||||||
Passengers | |||||||||||||
2013 | 1,416 (weekday average boardings)[2] | ||||||||||||
Services | |||||||||||||
| |||||||||||||
| |||||||||||||
The Brookline Branch of the Boston and Worcester Railroad was extended west to Newton Upper Falls by the Charles River Branch Railroad in November 1852. Chestnut Hill was added as a flag stop by 1858.[3] After 1886, loop service on the Highland branch was run via what is now the Framingham/Worcester Line and later the Needham Line. The final trains on the line ran on May 31, 1958. The line was converted to light rail by the M.T.A. and Chestnut Hill reopened on July 4, 1959, along with the rest of the line.[1] The original stone station was torn down and replaced by a small wooden shelter on the inbound platform.
In 2019, the MBTA indicated that the four remaining non-accessible stops on the D branch were "Tier I" accessibility priorities.[4] A preliminary design contract for accessibility modifications at the four stations was issued in February 2021.[5][6] Design reached 75% in June 2022. The station platforms will be raised and rebuilt, and a new accessible path to Hammond Road will be built. Construction is expected to last from early 2023 to early 2024.[7]</ref>
Media related to Chestnut Hill station (MBTA) at Wikimedia Commons
Stations of the MBTA subway | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||
![]() | |||||||||||
![]() |
| ||||||||||
![]() |
|
![]() | This tram-, streetcar-, or light rail-related article is a stub. You can help Wikipedia by expanding it. |
![]() ![]() | This Massachusetts train station–related article is a stub. You can help Wikipedia by expanding it. |
![]() | This article relating to the Massachusetts Bay Transportation Authority is a stub. You can help Wikipedia by expanding it. |