railroad.wikisort.org - Train

Search / Calendar

The Chennai Central–Coimbatore Shatabdi Express was a Shatabdi Express train between Chennai Central and Coimbatore Junction in Tamil Nadu.[1]

Chennai Central–Coimbatore Shatabdi Express
Overview
Service typeShatabdi Express
Current operator(s)Southern Railways
Route
TerminiChennai Central
Coimbatore Junction
Stops4
Distance travelled492.85 km (chargeable 502 km)
Average journey time6h 40m
Service frequencyDaily, except Tuesday
Train number(s)12243/12244
On-board services
Class(es)CC, Ex
Seating arrangementsYes
Sleeping arrangementsNo
Catering facilitiesYes
Observation facilitiesLarge windows
Baggage facilitiesOverhead racks
Technical
Rolling stockLHB coaches
Track gaugeBroad – 1,676 mm (5 ft 6 in)
Operating speed110 km/hr (maximum),
77 km/hr (average)
Route map

History


The Shatabdi Express which was running from 1995[2] and 2000 was stopped because it had occupancy of 60 percent as cited by Railways, It was replaced with an Intercity Express departing at identical timings.[3] Later, Indian railways introduced a Duronto Express between Chennai and Coimbatore in 2011. It was decided to convert back to Shatabdi and add additional stoppages to increase revenues.[4]


Route and stations


The train has 5 commercial stops in between the starting station and the ending station namely, Katpadi Junction, Jolarpettai Junction, Salem Junction, Erode Junction and Tiruppur.

By comparing with distance written on Chennai Division Map on Southern Railway website and distance written on timetable of a train having stoppages at AVADI and HINDU COLLEGE(H), the chargeable distance is increased by 6-7 km between AVADI and HINDU COLLEGE(H) and by comparing with distance written on Chennai Division Map and Salem Division Map both on Southern Railway website taking together, and on the other hand, distance written on timetable of a train having stoppages at JOLARPETTAI and TIRUPATTUR JN, the chargeable distance is increased by about 4 km between JOLARPETTAI and TIRUPATTUR JN. Maybe the reason behind increasing is higher cost for special railway infrastructure of these regions (not sure). As per just mentioned Chennai Division Map and Salem Division Map both on Southern Railway website taking together, distance between MGR Chennai Central and IRUGUR(H) is 475.15 km and IRUGUR(H) to COIMBATORE JN is 17.70 km and taking their sum is 492.85 km which is real distance between MGR Chennai Central and Coimbatore but chargeable distance is 502 km.


Rake


The rake has 7 AC Chair Cars, 1 AC Executive chair car and 2 EOG cars making a total of 10 coaches. The train got new LHB coaches in November 2014.[5] All the passenger coaches are air-conditioned.



The rake is pulled by Royapuram WAP-7 or Erode WAP-7.


See also



References





Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии