railroad.wikisort.org - Station

Search / Calendar

Ulverston is a railway station on the Furness Line, which runs between Barrow-in-Furness and Lancaster. The station, situated 9+12 miles (15 km) north-east of Barrow-in-Furness, serves the market town of Ulverston in Cumbria. It is owned by Network Rail and managed by Northern Trains.

Ulverston
General information
LocationUlverston, South Lakeland
England
Coordinates54°11′30″N 3°05′53″W
Grid referenceSD284778
Owned byNetwork Rail
Managed byNorthern Trains
Platforms2[lower-alpha 1]
Tracks2
Other information
Station codeULV
ClassificationDfT category E
History
Original companyUlverstone and Lancaster Railway
Pre-groupingFurness Railway
Post-groupingLondon, Midland and Scottish Railway
British Rail (London Midland Region)
Key dates
1 September 1857Opened
Passengers
2016/17 0.302 million
2017/18 0.307 million
2018/19 0.280 million
2019/20 0.323 million
2020/21 90,684
Listed Building – Grade II
FeatureOriginal Furness Railway station buildings
Designated24 June 1974
Reference no.1270170[1]
Location
Ulverston
Location in South Lakeland, Cumbria
Ulverston
Location in Cumbria, England
Notes
Passenger statistics from the Office of Rail and Road

History


The Furness Railway's line from Barrow-in-Furness and Dalton was the first railway to serve the town, being completed on 7 June 1854.[2] Three years later the Ulverstone and Lancaster Railway opened the line southwards to Carnforth via Arnside and built a new through station on the current site, which opened on 1 September 1857,[3] leaving the old FR terminus to be used as a goods depot. The Furness Railway then took over the Ulverstone and Lancaster company in 1862.

The current buildings are architecturally noteworthy and date from 1873, when they were rebuilt as befitting one of the main stations of the Furness Railway. The clock tower and glass awnings and supporting decorative ironwork, now extensively restored and repainted, are particularly fine. The passenger waiting room retains many period features.

The unusual platform layout (where the northbound line has a face on both sides) is a legacy of the station's former role as the interchange for the branch line to Lakeside, which diverged from the main line at Plumpton Junction a few miles to the south before heading north-eastwards through Greenodd and Haverthwaite, to its terminus at Lakeside on the southern shore of Windermere. The island platform allowed easy cross-platform interchange for those passengers travelling from the south changing onto the connecting service to Lakeside whilst those wishing to exit the station could do so by alighting on the opposite side platform. Today only platforms one and three are used.

The branch opened on 1 June 1869,[4] and was well-patronised from the outset in the summer months by tourists, who could make a convenient transfer to the Windermere steamboats at Lakeside. The line was much quieter in winter though and year-round services ended in the autumn of 1938 – passenger trains thereafter running only during the summer. This continued until 6 September 1965,[5] when the line fell victim to the Beeching Axe.

The line's northern end was subsequently reopened on 2 May 1973,[6] as the Lakeside and Haverthwaite Railway. However, the remainder was lifted in the early 1970s, and the trackbed used for improvements to the A590 road (over which passengers must continue their journey if heading to Lakeside today).


Facilities


The station is fully staffed throughout the week (except in the late evening); the booking office and waiting room is located in the main building on platform 1 and a ticket machine is also available in this building.[7]

In 2007 new digital information screens were installed allowing passengers to see the status and timing of their train. Help points and an automated PA system are also provided. The platforms are linked by a subway, but there is no step-free access to either platform.[7]


Services


Northern Trains
Route 6
Cumbrian Coast, Furness
and Windermere Lines
Carlisle
Dalston
Wigton
Aspatria
Maryport
Flimby
Workington
Harrington
Parton
Whitehaven
Corkickle
St Bees
Nethertown
Braystones
Sellafield
Seascale
Drigg
Ravenglass for Eskdale
Bootle
Silecroft
Millom
Green Road
Foxfield
Kirkby-in-Furness
Askam
Barrow-in-Furness
Roose
Dalton
Ulverston
Cark & Cartmel
Kents Bank
Grange-over-Sands
Arnside
Silverdale
Carnforth
Windermere
Staveley
Burneside
Kendal
Oxenholme Lake District
Lancaster
Preston
Wigan North Western
Manchester Oxford Road
Manchester Piccadilly
Mauldeth Road
Burnage
East Didsbury
Gatley
Heald Green
Manchester Airport
Bootle, Braystones, Drigg, Flimby, Green Road,
Kirkby-in-Furness, Nethertown, Parton and
Silecroft are request stops.

There is normally one train per hour in each direction to Barrow and Lancaster on Monday to Saturday daytimes (with some peak period extras) [8]). A few through trains each day beyond Barrow to Carlisle via Whitehaven and one to Millom (connections for Cumbrian Coast stations are available at Barrow at other times). Southbound, a number of services continue through to Preston and Manchester Airport. A similar service operates on Sundays, with trains to Carlisle now running (since the summer 2018 timetable change – the first time such trains have operated since 1976).


See also



Notes


  1. Platforms are numbered 1 and 3.

References


  1. Historic England. "Ulverston Railway Station (Grade II) (1270170)". National Heritage List for England. Retrieved 14 March 2021.
  2. History of the Furness Railway Accessed 2008-08-29
  3. Butt 1995, p. 237.
  4. Butt 1995, p. 109.
  5. Butt 1995, p. 252.
  6. Butt 1995, p. 115.
  7. Ulverston Station Information National Rail Enquiries; Retrieved 25 November 2016
  8. GB eNRT May 2019 Edition, Table 82

Sources




Preceding station National Rail Following station
Barrow-in-Furness   Northern Trains
Cumbria–Manchester Airport
  Cark and Cartmel
Dalton     Grange-over-Sands
Dalton   Northern Trains
Furness Line
  Cark and Cartmel
  Historical railways  
Greenodd   Furness Railway
Ulverston to Lakeside Line
  Terminus



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии