railroad.wikisort.org - Station

Search / Calendar

West Coast MRT station is a future underground Mass Rapid Transit station on the Cross Island line (CRL) located in Clementi, Singapore. It will serve West Coast Road, West Coast Highway and West Coast Drive. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.[3]

 CR18 
West Coast
西海岸[1]
வெஸ்ட் கோஸ்ட்[2]
Future Mass Rapid Transit (MRT) station
Tanglin Secondary School, which would be the future site of West Coast station
General information
Location301 West Coast Road
Coordinates1.310790°N 103.757828°E / 1.310790; 103.757828
Owned byLand Transport Authority
Line(s)
  Cross Island Line
Construction
Structure typeUnderground
Disabled accessYes
History
Opening2032; 10 years' time (2032)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Clementi Cross Island Line
Future service
Jurong Lake District
Terminus
Location
West Coast
West Coast station in Singapore


History


West Coast station was first announced on 20 September 2022 by Transport Minister S Iswaran. The station will be constructed as part of Phase 2 of the Cross Island line (CRL), a 15-kilometre (9.3 mi) segment spanning six stations from Turf City station to Jurong Lake District station.[4] The station is expected to be completed in 2032.[5]

For the station's construction, two properties belonging to JTC at Pandan Loop Industrial Estate southwest of the station will be acquired for the construction of the station.[6]


Details


West Coast station will serve the Cross Island line (CRL) and have an official station code of CR18. The station will be located at the site of Tanglin Secondary School,[7] which was previously announced to merge with New Town Secondary School given falling enrolment and future development plans.[8] Concerns were raised by residents that the station was not situated in the West Coast town centre. Transport Minister Iswaran clarified that the site was chosen for its proximity to residential estates and future industrial developments, which would allow the station to serve both areas.[9][10]


References


  1. "跨岛线第二阶段将有六个地铁站 预计2032年竣工". 早报 (in Chinese). 20 September 2022. Retrieved 20 September 2022.
  2. "குறுக்குத் தீவு ரயில்பாதையின் 2ஆம் கட்டம் 2032ல் திறப்பு". tamilmurasu (in Tamil). 21 September 2022. Retrieved 21 September 2022.
  3. "Cross Island Line Phase 2". LTA. 20 September 2022. Retrieved 20 September 2022.
  4. Chew, Hui Min (20 September 2022). "Six more MRT stations will be built in Phase 2 of Cross Island Line; to open by 2032". CNA. Retrieved 20 September 2022.
  5. Kok, Yufeng (20 September 2022). "Cross Island Line phase 2 to open by 2032 with 6 MRT stations, from Turf City to Jurong Lake District". The Straits Times. Retrieved 20 September 2022.
  6. Kok, Yufeng (20 September 2022). "Condo parking spaces, 2 industrial units to make way for Cross Island Line phase 2". The Straits Times. Retrieved 22 September 2022.
  7. "CR18 West Coast". LTA. Retrieved 20 September 2022.
  8. "18 primary and secondary schools to undergo mergers due to declining birth rates, changing demographics". CNA. Retrieved 22 September 2022.
  9. 刘智澎 (24 September 2022). "易华仁:仍在探讨兴建西海岸延长线是否可行" [Iswaran: Still discussing whether the construction of the West Coast extension is feasible]. Zaobao (in Simplified Chinese). Retrieved 24 September 2022.
  10. Lee, Amanda (24 September 2022). "Authorities studying if Jurong Lake District, Jurong Town Hall stations will be linked as interchange: S. Iswaran". The Straits Times. Retrieved 24 September 2022.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии