Tampines North MRT station is a future underground Mass Rapid Transit station on the Cross Island line located in Tampines, Singapore. Upon opening, this MRT station will be in close proximity with IKEA Tampines, COURTS Megastore and Giant Tampines. It will also serve the residents of the future Tampines North New Town.
CR6
Tampines North 淡滨尼北 தெம்பினிஸ் நார்த் | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
![]() Tampines North MRT station site | |||||||||||
General information | |||||||||||
Coordinates | 1°22′09″N 103°56′16″E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Line(s) | Cross Island Line | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 4 (Including 2 sidings) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2030; 8 years' time (2030) | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
![]() ![]() Tampines North Tampines North station in Singapore |
On 25 January 2019, the Land Transport Authority (LTA) announced that Tampines North station would be part of the proposed Cross Island line (CRL). The station will be constructed as part of Phase 1 (CRL1), consisting of 12 stations between Aviation Park and Bright Hill. CRL1 was expected to be completed in 2029.[1][2][3] However, the restrictions imposed on construction works due to the COVID-19 pandemic led to delays and the CRL1 completion date was pushed by one year to 2030.[4]
The contract for the construction of bored tunnels between this station and Defu station was awarded to Nishimatsu Construction Co Ltd on 8 November 2021 at S$446 million (US$326.9 million). As part of the contract, a facility building will be constructed to fulfil the electrical and mechanical requirements for the line. A large-diameter tunnel boring machine will be used to construct a tunnel with double tracks. Tunnelling through abrasive alluvium soil, the boring machine has to be closely monitored for wear and tear. Construction for these tunnels will start in December 2021.[5][6][7]
The contract for the design and construction of Tampines North Station and associated tunnels was awarded to China Communications Construction Company Limited (Singapore Branch) on 22 February 2022 at S$397 million (US$291 million). Construction is expected to begin in the second quarter of 2022, with an expected completion date of 2030. Construction of the station required excavation into mixed ground conditions of marine clay and sandy and silty clay.[8][9][10]
![]() | |||||||
---|---|---|---|---|---|---|---|