The Senawang Komuter station, is a Malaysian commuter rail station serving as a halt on the KTM Komuter Seremban Line. It was constructed as part of the double tracking and electrification project between Seremban and Gemas, undertaken by IRCON International, a subsidiary of Indian Railways. The station began revenue service on 14 May 2011.[citation needed]
KB14 Senawang | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() ![]() Commuter rail station | |||||||||||
![]() | |||||||||||
General information | |||||||||||
Location | Senawang, Negeri Sembilan, Malaysia. | ||||||||||
Coordinates | 2°41′21.1″N 101°58′20.1″E | ||||||||||
Owned by | Keretapi Tanah Melayu | ||||||||||
Line(s) | West Coast Line Seremban Line | ||||||||||
Platforms | 2 side platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Parking | Available | ||||||||||
Other information | |||||||||||
Station code | KB14 | ||||||||||
History | |||||||||||
Opened | 14 May 2011 | ||||||||||
Electrified | 2011 | ||||||||||
Services | |||||||||||
| |||||||||||
The station serves Senawang and is the closest station to some of Seremban's other suburbs such as Paroi and Rahang. The station is located near the three-way intersection of the North South Expressway's Senawang Exit, the Federal Route 1 and Persiaran Senawang 1.
![]() | This Malaysian railroad station-related article is a stub. You can help Wikipedia by expanding it. |