The Bandar Botanik LRT station is designated to be an elevated rapid transit station in Bandar Botanic, Klang, Selangor, Malaysia, forming part of the Shah Alam line.[1]
![]() | This article relies largely or entirely on a single source. (March 2016) |
BUK25 Bandar Botanik LRT station Stesen LRT Bandar Botanik 植物園轻快铁站 பண்டார் பொத்தேனிக் ரயில் நிலையம் ![]() | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Light Rail Transit | |||||||||||
General information | |||||||||||
Location | Bandar Botanic, Klang, Selangor, Malaysia. | ||||||||||
Owned by | Syarikat Prasarana Negara, operated by RapidKL. | ||||||||||
Line(s) | Shah Alam line | ||||||||||
Platforms | 2 | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Parking | Yes | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | BUK25 | ||||||||||
History | |||||||||||
Opening | February 2024 | ||||||||||
Services | |||||||||||
| |||||||||||
The station is marked as Station No. 25 along the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang. The Bandar Botanik LRT station is expected to be operational in February 2024.[2]
However, as of 13 July 2018, it is earmarked to be one of the five stations which will be postponed in order to reduce overall construction costs.[3][4]
![]() | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview |
| ||||||||||||||||||||
Major Operators | |||||||||||||||||||||
Inter-city rail |
| ||||||||||||||||||||
Commuter rail |
| ||||||||||||||||||||
Metro rail |
| ||||||||||||||||||||
Border link |
| ||||||||||||||||||||
Other rail |
| ||||||||||||||||||||
Rolling Stock(s) & Manufacturer(s) |
| ||||||||||||||||||||
Depots |
| ||||||||||||||||||||
Related articles |
|
Urban rail transit in Southeast Asia | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
| ||||||||||||||||||
![]() |
| ||||||||||||||||||
![]() |
| ||||||||||||||||||
![]() |
| ||||||||||||||||||
![]() |
| ||||||||||||||||||
![]() |
| ||||||||||||||||||
![]() |
| ||||||||||||||||||
Note: Under construction & planned lines are in Italics |