railroad.wikisort.org - Station

Search / Calendar

Moresby Parks railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1879. It was situated just north of the summit of the company's main line[6] and served the scattered community of Moresby Parks in Cumbria, England.[7][8]

Moresby Parks
General information
LocationNear Hensingham, Cumbria, Copeland
England
Coordinates54.5617°N 3.5532°W / 54.5617; -3.5532
Grid referenceNX996196
Platforms2[1][2]
Other information
StatusDisused
History
Original companyCleator and Workington Junction Railway
Post-groupingLondon, Midland and Scottish Railway
Key dates
1 October 1879Opened
13 April 1931Closed[3]
1 July 1963Closed completely[4]
16 September 1963Line through the station closed[5]
1904 railway junctions around Cleator Moor, Parton, Rowrah & Whitehaven
1904 railway junctions around Cleator Moor, Parton, Rowrah & Whitehaven

History


The line was one of the fruits of the rapid industrialisation of West Cumberland in the second half of the nineteenth century, being specifically born as a reaction to oligopolistic behaviour by the London and North Western and Whitehaven, Cleator and Egremont Railways.[9] The station was on the line from Moor Row to Workington Central. Both line and station opened to passengers on 1 October 1879.

All lines in the area were primarily aimed at mineral traffic, notably iron ore, coal and limestone, none more so than the new line to Workington, which earned the local name "The Track of the Ironmasters". General goods and passenger services were provided, but were very small beer compared with mineral traffic.[10]

The founding Act of Parliament of June 1878 confirmed the company's agreement with the Furness Railway that the latter would operate the line for one third of the receipts.[11]


Services


Passenger trains consisted of antiquated Furness stock hauled largely by elderly Furness engines[12][13] referred to as "rolling ruins" by one author after a footplate ride in 1949.[14]

No Sunday passenger service was ever provided on the line.

The initial passenger service in 1879 consisted of

In 1880 the extension northwards to Siddick Junction was opened. The service was extended to run to and from Siddick and an extra train was added, with

By 1922 the service reached its high water mark, with:

There was one fewer Down train, as the 09:50 Up was provided to give a connection at Siddick with a fast MCR train to Carlisle with connections beyond.[16]

Although not serving Cleator Moor, two Saturdays Only trains left Oatlands at 16:05 and 21:35 for Workington, calling at Distington and High Harrington, with balancing workings leaving Workington at 15:30 and 21:00.

There were also trains using the Lowca Light Railway plying between Lowca and Workington, but they served no "pure" C&WJR stations other than Workington Central.[17]

As with advertised passenger trains, in 1920 workmen's trains ran on the company's three southern routes:

The situation in 1922 was similar.[16]

The 1920 Working Time Table shows relatively few Goods trains, with just one a day in each direction booked to call at Moresby Parks.

Mineral traffic was an altogether different matter, dwarfing all other traffic in volume, receipts and profits. The key source summarises it "...the 'Track of the Ironmasters' ran like a main traffic artery through an area honeycombed with mines, quarries and ironworks."[19] The associated drama was all the greater because all the company's lines abounded with steep inclines[20] and sharp curves,[21] frequently requiring banking. The saving grace was that south of Workington at least, most gradients favoured loaded trains. During the First World War especially, the company ran "Double Trains", akin to North American practice, with two mineral trains coupled together and a banking engine behind, i.e. locomotive-wagons-guards van-locomotive-wagons-guards van-banker. Such trains worked regularly between Distington and Cleator Moor West, passing through Moresby Parks.[22] The practice was discontinued after dark from 1 April 1918.[23]

Most stations on the company's lines had heavy industrial neighbours, such as ironworks next to Cleator Moor West, or served primarily industrial workforces, such as Keekle Colliers' Platform. Throughout its working life Moresby Parks was more rural, though by 2013 the station site was surrounded by a substantial housing estate.

Like any business tied to one or few industries, the railway was at the mercy of trade fluctuations and technological change. The Cumberland iron industry led the charge in the nineteenth century, but became less and less competitive as time passed and local ore became worked out and harder to win, taking the fortunes of the railway with it. The peak year was 1909, when 1,644,514 tons of freight were handled.[24] Ominously for the line, that tonnage was down to just over 800,000 by 1922, bringing receipts of £83,349, compared with passenger fares totalling £6,570.[25]


Rundown and closure


The high water mark for tonnage was 1909, the high water mark for progress was 1913, with the opening of the Harrington and Lowca line for passenger traffic. A chronology of the line's affairs from 1876 to 1992 has almost no entries before 1914 which fail to include "opened" or "commenced". After 1918 the position was reversed, when the litany of step-by-step closures and withdrawals was relieved only by a control cabin and a signalbox being erected in 1919 and the Admiralty saving the northern extension in 1937 by establishing an armaments depot at Broughton.[26]

Moresby Parks station closed on 13 April 1931 when normal passenger traffic ended along the line. Diversions and specials, for example to football matches,[27] made use of the line, but it was not easy to use as a through north–south route because all such trains would have to reverse at Moor Row or Corkickle.[28]

An enthusiasts' special ran through on 6 September 1954, the only one to do so using main line passenger stock. The next such train to traverse any C&WJR metals did so in 1966 at the north end of the line, three years after the line through Moresby Parks closed.[29]


Afterlife


By 2013 aerial images clearly show the line of route and that the area around the station site had been transformed by housing. The station site itself appeared to be a scrapyard.

Preceding station   Disused railways   Following station
Millgrove (Cumbria)
Line and station closed
  Cleator and Workington Junction Railway   Moresby Junction Halt
Line and station closed

See also



References


  1. McGowan Gradon 2004, p. 16.
  2. Images of the station, via Cumbria Railways Association
  3. Butt 1995, p. 163.
  4. McGowan Gradon 2004, p. 68.
  5. McGowan Gradon 2004, p. 59.
  6. McGowan Gradon 2004, p. 64.
  7. Smith & Turner 2012, Map 26.
  8. Jowett 1989, Map 36.
  9. Anderson 2002, p. 309.
  10. Anderson 2002, p. 313.
  11. Marshall 1981, p. 117.
  12. Anderson 2002, p. 314.
  13. McGowan Gradon 2004, pp. 40 & 42.
  14. McGowan Gradon 2004, p. 51.
  15. McGowan Gradon 2004, p. 38.
  16. McGowan Gradon 2004, p. 39.
  17. Bradshaw 1985, p. 595.
  18. Haynes 1920, pp. 8–13.
  19. McGowan Gradon 2004, p. 41.
  20. McGowan Gradon 2004, p.64, Gradient Diagrams.
  21. McGowan Gradon 2004, p. 25.
  22. McGowan Gradon 2004, Front cover & pp.42-3.
  23. Haynes 1920, p. 5.
  24. McGowan Gradon 2004, p. 50.
  25. Suggitt 2008, p. 65.
  26. McGowan Gradon 2004, pp. 58–59.
  27. McGowan Gradon 2004, p. 52.
  28. Marshall 1981, p. 118.
  29. McGowan Gradon 2004, pp. 60–1.

Sources



Further reading







Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии