Lakeside MRT station is an above-ground Mass Rapid Transit (MRT) station on the East West line in Jurong West, Singapore. This station is built on the northwestern bank of the Jurong Lake, hence its name.
EW26
Lakeside 湖畔 ஏரிக்கரை Lakeside | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | |||||||||||
Exterior of Lakeside MRT station, which is adjacent to Jurong Lake in the background. | |||||||||||
General information | |||||||||||
Location | 201 Boon Lay Way Singapore 649845 | ||||||||||
Coordinates | 1°20′40.52″N 103°43′16.10″E | ||||||||||
Operated by | SMRT Trains Ltd (SMRT Corporation) | ||||||||||
Line(s) | East West Line | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 1 | ||||||||||
Parking | No | ||||||||||
Bicycle facilities | Yes | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opened | 5 November 1988; 33 years ago (1988-11-05) | ||||||||||
Electrified | Yes | ||||||||||
Previous names | Corporation[1][2][3] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
![]() ![]() Lakeside Lakeside station in Singapore |
Lakeside station provides MRT access to residents living in Taman Jurong and Hong Kah. It is currently one of the three stations that serve Jurong West New Town; the other two being Boon Lay MRT station and Pioneer MRT station.
The station was opened on 5 November 1988 and served as the western terminal station for the East West line[4] until Boon Lay station opened on 6 July 1990. when westbound train terminates at Platform B before it turnaround utilised nearby crossover to Platform A headed back to the East, before Boon Lay was fully opened on 6 July 1990
The station was designed with a curved Chinese roof, similar to those at the nearby Chinese Garden.[5]
As with most of the above-ground stations built in the past along the East West line, it was built without platform screen doors. After several successful tests at Jurong East, Yishun and Pasir Ris and eventually, installation of the half-height screen doors started on 9 June 2010 and operations commenced on 31 August that year along with Bukit Batok.[6]
High-volume low-speed fans were installed and commenced operation on 30 November 2012.[7] Privacy screens were installed from Lakeside MRT station to Corporation Road, excluding Lakeside crossover to minimise noise generated from their residents.[8]
MRT stations in Singapore | |||
---|---|---|---|
Italicized stations are currently not in operation | |||
East West |
| ||
Depot(s) |
| ||
|