Kağıthane is a rapid transit complex, partly currently under construction, on the M7 and M11 lines of the Istanbul Metro.[1][2] The complex will be located above ground on the metro viaducts crossing the Kağıthane Creek. The M7 platform of the complex opened in 2020,[3] with the expected opening of the M11 platform in August 2022.[4]
Kağıthane | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Istanbul Metro rapid transit station | |||||||||||||||||||||
![]() | |||||||||||||||||||||
General information | |||||||||||||||||||||
Location | Eyüp Sultan Cd., Merkez Mah. 34406 Kağıthane | ||||||||||||||||||||
Coordinates | 41.0804°N 28.9710°E / 41.0804; 28.9710 | ||||||||||||||||||||
Owned by | Istanbul Metropolitan Municipality | ||||||||||||||||||||
Operated by | Istanbul Metro | ||||||||||||||||||||
Line(s) | ![]() ![]() | ||||||||||||||||||||
Platforms | N/A | ||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||
Connections | ![]() ![]() | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Elevated | ||||||||||||||||||||
Depth | 25 metres (82 ft) (M11 platform) | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 2020 (M7 platform) 2022 (M11 platform) | ||||||||||||||||||||
Electrified | 1,500 V DC Overhead line | ||||||||||||||||||||
Services | |||||||||||||||||||||
| |||||||||||||||||||||
Kağıthane station was originally planned to be completed in 2017, however construction delays pushed the opening back to first 2018 and then 2019. The complex is the first metro station within central Kağıthane.
edge platform | ||
Eastbound | ← ![]() | |
Westbound | → ![]() | |
edge platform |
Northbound | ← ![]() | |
Island platform | ||
Northbound | ← ![]() |
![]() | |
---|---|
M1 |
|
M2 | |
M3 |
|
M4 |
|
M5 |
|
M6 | |
M7 | |
M8 | |
M9 |
|
M10 |
|
M11 |
|
M12 | |
F1 |
|
F3 | |
F4 |
Authority control ![]() |
|
---|