Yamanevler is an underground station of the M5 line of the Istanbul Metro in Üsküdar.[2] It is located beneath Alemdağ Avenue in the Atatkent neighborhood of Ümraniye. Connection to IETT city buses is available from at street level. From its opening in December 2017 until October 2018, Yamanevler station was the eastern terminus of the M5 until the line was extended further to Çekmeköy.
Yamanevler ![]() | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Istanbul Metro rapid transit station | |||||||||||
General information | |||||||||||
Location | Alemdağ Cd., Atakent Mah., 34760 Ümraniye | ||||||||||
Coordinates | 41.0246°N 29.1054°E / 41.0246; 29.1054 | ||||||||||
Owned by | Istanbul Metropolitan Municipality | ||||||||||
Operated by | Istanbul Metro | ||||||||||
Line(s) | ![]() | ||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | ![]() ![]() | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opened | 15 December 2017 | ||||||||||
Electrified | 1,500 V DC Overhead line | ||||||||||
Services | |||||||||||
| |||||||||||
The station consists of an island platform with two tracks. Since the M5 is an ATO line, protective gates on each side of the platform open only when a train is in the station. Yamanevler station was opened on 15 December 2017, together with eight other stations from Üsküdar.[3]
P Platform level |
Westbound | ←![]() |
Island platform, doors will open on the left | ||
Westbound | ![]() |
![]() | |
---|---|
M1 |
|
M2 |
|
M3 |
|
M4 |
|
M5 |
|
M6 |
|
M7 |
|
M9 |
|
F1 |
|
F3 |
|
![]() | This article about a Turkish railway station is a stub. You can help Wikipedia by expanding it. |
![]() | This Istanbul Metro article is a stub. You can help Wikipedia by expanding it. |