Date | Content |
November 17, 1914 (1914-11-17) | Operation started as ordinary station at Sangsaeng-ri, Idong-myeon, Jeonju-gun, North Jeolla[3][1][2] |
January 16, 1915 (1915-01-16) | Rebuilt the station building[2] |
October 1, 1928 (1928-10-01) | Railroad Bureau of Governor-General of Korea bought the station[2] |
September 20, 1929 (1929-09-20) | Rebuild and Relocated the station to Nosong-ri, Idong-myeon, Jeonju-gun[2] |
January 11, 1930 (1930-01-11) | Improved the gauge to standard gauge at section of Iri ~ Jeonju[2] |
April 1, 1972 (1972-04-01) | Transferred from Daejeon Railroad bureau to Suncheon Railroad bureau[2] |
March 23, 1978 (1978-03-23) | Rebuild and Relocated the station to present location, because of transfer of Jeolla Line's Jeonju section[2] Built the underground platform passageway[2] |
May 25, 1981 (1981-05-25) | Started new station building construction[2] |
May 1, 1993 (1993-05-01) | Paid rest area operation started[4][2] |
July 1, 1995 (1995-07-01) | Paid rest area closed[5][2] |
May 1, 2006 (2006-05-01) | Small Cargo carrying stopped[2] |
November 1, 2008 (2008-11-01) | Cargo transportation stopped[6][2] |
October 5, 2011 (2011-10-05) | Double-track opened, and KTX began to stop[7] |
December 13, 2013 (2013-12-13) | S-Train began to stop |
June 1, 2014 (2014-06-01) | ITX-Saemaeul began to stop |