railroad.wikisort.org - Station

Search / Calendar

Gulou Dajie Station[1] (simplified Chinese: 鼓楼大街站; traditional Chinese: 鼓樓大街站; pinyin: Gǔlóudàjiē Zhàn; lit. 'Gulou Street') is a station on Line 2 and Line 8 of the Beijing Subway.[2] The connection to line 8 opened on December 30, 2012.[3]

Gulou Dajie

鼓楼大街
Line 8 concourse
General information
LocationXicheng District / Dongcheng District border, Beijing
China
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)
  •      Line 2
  •      Line 8
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
Disabled accessYes
Other information
Station code217 (line 2)
History
OpenedSeptember 20, 1984; 38 years ago (1984-09-20) (line 2)
December 30, 2012; 9 years ago (2012-12-30) (line 8)
Services
Preceding station Beijing Subway Following station
Jishuitan
outer loop / anticlockwise
Line 2 Andingmen
inner loop / clockwise
Andeli Beijie
towards Zhuxinzhuang
Line 8 Shichahai
towards Yinghai
Location
Gulou Dajie
Location in central Beijing

Station Layout


Both the line 2 and 8 stations have underground island platforms.


Exits


There are 6 exits, lettered A1, A2, B, E, F, and G. Exit B is accessible.




References


  1. "Jpg格式线路图下载 | 北京地铁官方网站".
  2. 鼓楼大街站 (in Simplified Chinese). Beijing Municipal Government. Retrieved 29 April 2012.
  3. 北京四地铁线30日开通 首末车时间确定 (in Simplified Chinese). 新京报. Retrieved 26 December 2012.






Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии