Tianqiao station[1] (simplified Chinese: 天桥站; traditional Chinese: 天橋站; pinyin: Tiān Qiáo zhàn)[2] is a station on Line 8 of the Beijing Subway. It was opened on December 30, 2018.[3]
![]() | This article uses bare URLs, which are uninformative for readers and may be threatened by link rot. (August 2022) |
Tianqiao 天桥 ![]() | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() Platform | |||||||||||
General information | |||||||||||
Location | Tianqiao South Street Dongcheng District / Xicheng District border, Beijing China | ||||||||||
Coordinates | 39.880809°N 116.392480°E / 39.880809; 116.392480 | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 8 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2018 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
![]() ![]() Tianqiao Location in central Beijing |
The station has an underground island platform.
There are 3 exits: lettered A, C, and D.[4]
Beijing Subway stations | |
---|---|
Line 8 |
|
Stations that are proposed, under planning or under construction are shown in italics. |
This article related to the Beijing Subway is a stub. You can help Wikipedia by expanding it. |