Etah railway station is on the Barhan–Etah branch line. It is located in Etah district in the Indian state of Uttar Pradesh. It serves Etah and the surrounding areas.
Etah railway station | |
---|---|
![]() | |
![]() Etah railway station | |
General information | |
Location | Near Arsh Gurukul, Kasganj Road, Etah, Uttar Pradesh India |
Coordinates | 25°34′19″N 78°39′15″E |
Elevation | 174 metres (571 ft) |
Owned by | Indian Railways |
Operated by | North Central Railway |
Line(s) | Barhan–Etah branch line |
Platforms | 1 |
Tracks | 3 |
Construction | |
Structure type | Standard on ground |
Parking | No |
Bicycle facilities | YES |
Other information | |
Status | Functioning |
Station code | ETAH |
Division(s) | Prayagraj |
History | |
Opened | 1959 |
Rebuilt | 2019 |
Electrified | 2020–2021 |
Passengers | |
Present 500 | |
Location | |
![]() ![]() Etah railway station Location in Uttar Pradesh Show map of India![]() ![]() Etah railway station Etah railway station (Uttar Pradesh) Show map of Uttar Pradesh |
Trains started running on the Howrah–Delhi main line of East Indian Railway Company in 1865–66. After independence, Etah railway station was established in 1949 by the State Railways minister Mr. Rohanlal Chaturvedi! Etah railway station was inaugurated by the first President of India Dr Rajendra Prasad. After this time passed but the railway resources remained there. From 2000 onwards, the demand for railway line expansion started gaining momentum, which became the major demand of every section since 2005. All the movements took place from Etah to the capital Delhi. How many memoranda and signatures have been sent to the President Prime Minister and the Ministry of Railways, but till now the railway line expansion remains the hope.
Etah - Tundla passenger train started. Which used to take two rounds daily. After that, for the first time in 2019, the Etah-Agra Fort train ran. Which was closed after just 6 months. The Etah-Tundla passenger was also discontinued at Lockdon. But now this train has started in 2021 again. It is a matter of happiness that Etah - Agra Fort has also started running again. But sadly, despite Etah being a district, the station here is small with not many trains available. Only two trains run. There are no long distance trains.
The railway is now going to make Etah railway station a hub for goods trains. So far, only one track has been laid from Barhan to Agra. Its electrification work is on the verge of ending. At the same time, a new track will be laid to erect goods trains on the south side of the railway station. Two tracks will be laid here, so that freight trains can be easily erected. At the same time, the length of the platform will be increased and the signals will be repaired.
Preceding station | ![]() |
Following station | ||
---|---|---|---|---|
Terminus | North Central Railway zone Barhan–Etah branch line |
Jalesar city towards ? |