Crystal City station is a commuter rail station in the Crystal City section of Arlington, Virginia, located near the George Washington Memorial Parkway and Ronald Reagan National Airport. It is served by the Fredericksburg Line and Manassas Line of the Virginia Railway Express system. VRE plans to rebuild the station nearby to accommodate longer trains and increased service.
Crystal City | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A southbound Manassas Line train at Crystal City station in 2017 | |||||||||||||||
General information | |||||||||||||||
Location | 1503 South Crystal Drive, Arlington, Virginia United States | ||||||||||||||
Coordinates | 38°51′34″N 77°02′54″W | ||||||||||||||
Line(s) | CSX RF&P Subdivision | ||||||||||||||
Platforms | 1 side platform | ||||||||||||||
Tracks | 3 | ||||||||||||||
Connections | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | ||||||||||||||
Construction | |||||||||||||||
Disabled access | Yes | ||||||||||||||
Other information | |||||||||||||||
Station code | CCV | ||||||||||||||
Fare zone | 2 | ||||||||||||||
History | |||||||||||||||
Opened | June 22, 1992[1] | ||||||||||||||
Rebuilt | 2022–2024 (planned) | ||||||||||||||
Services | |||||||||||||||
| |||||||||||||||
| |||||||||||||||
The station has a single side platform located on the west side of the three tracks of the RF&P Subdivision.[2] Crystal City station, used by 18% of VRE riders in 2017, represents an "operational bottleneck" for VRE: the single 400-foot (120 m)-long platform is shorter than 700-foot (210 m) trains and forces all trains to use one track.[3][4]
VRE plans to expand the station into a full-length center platform serving two tracks, with grade-separated access to the platform. An alternatives analysis released in November 2017 analyzed three possible sites. All three sites would allow for a future pedestrian bridge or tunnel to Ronald Reagan National Airport to give direct airport access from the station and Crystal City. The preferred location was slightly south of the current station, with the platform stretching from 18th Street to south of 20th Street.[2]
Preliminary engineering for the station began in late 2019.[5] As of January 2021[update], final design was expected to last from January 2021 to August 2022, with construction from November 2022 to October 2024.[6] In May 2022, Amtrak and the Virginia Passenger Rail Authority reached an agreement to add a separate Amtrak platform at the station.[7]
Media related to Crystal City station (VRE) at Wikimedia Commons
![]() | |
---|---|
Fredericksburg | |
Manassas | |
Administered by the Northern Virginia Transportation Commission & Potomac and Rappahannock Transportation Commission and operated by Keolis • Italics indicate future station |
![]() ![]() | This Virginia train station-related article is a stub. You can help Wikipedia by expanding it. |