The Bandar Malaysia Utara MRT station (Working name: Bandar Malaysia North) is a future provisional Mass Rapid Transit (MRT) underground station. The station is currently under construction that will serve the future suburb of Bandar Malaysia in Kuala Lumpur, Malaysia. It will be one of the stations on the Klang Valley Mass Rapid Transit (KVMRT) Sungai Buloh-Serdang-Putrajaya Line.[1] The station will be built at the former site of Simpang Airport, along with Bandar Malaysia South station and the rest of the Bandar Malaysia development.[2]
PY25 Bandar Malaysia Utara ![]() | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future MRT station | |||||||||||
General information | |||||||||||
Location | Bandar Malaysia, Kuala Lumpur, Malaysia. | ||||||||||
Owned by | MRT Corp | ||||||||||
Operated by | Rapid Rail | ||||||||||
Line(s) | 12 Putrajaya | ||||||||||
Platforms | Island platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Parking | Available, pay. | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
Station code | PY25 | ||||||||||
Services | |||||||||||
| |||||||||||
The Putrajaya Line expected to complete and start operation with Phase 1 slated by November 2021.
Greater KL/Klang Valley Area rail transit stations | |||||
---|---|---|---|---|---|
| |||||
1 Seremban Line |
| ||||
2 Port Klang Line |
| ||||
3 Ampang Line |
| ||||
4 Sri Petaling Line |
| ||||
5 Kelana Jaya Line |
| ||||
6 KLIA Ekspres |
| ||||
7 KLIA Transit |
| ||||
8 KL Monorail |
| ||||
9 Kajang Line |
| ||||
10 Skypark Link |
| ||||
11 Shah Alam |
| ||||
12 Putrajaya Line |
| ||||
B1 BRT Sunway Line |
| ||||
Stations and services in italics are planned or under construction |