railroad.wikisort.org - Train

Search / Calendar

The Belgrano Sur line is an Argentine 1,000 mm (3 ft 3+38 in) metre gauge commuter rail service in the Greater Buenos Aires area, currently operated by state-owned enterprise Trenes Argentinos. The Belgrano Sur runs over tracks and through stations built by the Franco–Belgian-owned Compañía General de Buenos Aires and British Midland companies at the beginning of the 20th century.

Belgrano Sur Line
A CNR Diesel Multiple Unit leaving
Buenos Aires station, December 2015
Overview
Service typeCommuter rail
StatusActive
LocaleGreater Buenos Aires
Predecessor
List
    • Cía. General BA
    • Midland
First service1948; 74 years ago (1948)
Current operator(s)Trenes Argentinos
Former operator(s)Argentren
Annual ridership10,116,012 (2019)[1]
WebsiteBelgrano Sur
Route
TerminiDr. A. Sáenz
Marcos Paz
M. del Belgrano
Stops29
Average journey time77'
70'
Service frequency20'
On-board services
Class(es)Unique
Technical
Track gauge1,000 mm (3 ft 3+38 in)
Track owner(s)Government of Argentina

The termini are Dr. A. Sáenz in the Nueva Pompeya district of the autonomous city of Buenos Aires, with two branches to Marcos Paz (departing from González Catán)[2][3] and Marinos del Crucero Gral. Belgrano in La Matanza and Merlo partidos respectively. Carrying just under 11 million passengers per year, the line is the least used of the Buenos Aires commuter rail network.[4]


History



Background


The railway line was originally built and operated by two companies, British-owned Buenos Aires Midland Railway (BA Midland) and Franco-Belgian-owned Compañía General de Buenos Aires (CGBA) (established in 1908). The first train on the British owned line made its inaugural trip in 1909 joining Puente Alsina and Carhué. CGBA built and operated a large network reaching cities in the west of Buenos Aires Province and branches to cities such as La Plata and Rosario, although most of the line has since been closed and only a few services still operate.

When the entire Argentine railway network was nationalised in 1948 during Juan Perón's presidency, the BA Midland became part of the Belgrano Sur line division of the General Belgrano Railway. Furthermore, the newly nationalised companies added to Ferrocarril Belgrano network were renamed, being known as "G" (Cía. Gral. de Buenos Aires), "M" (Midland) and "P(Province of Buenos Aires Railway).


Ferrocarriles Argentinos


A Birmingham railcar in Tapiales, 1957
A Birmingham railcar in Tapiales, 1957

After the nationalisation, several improvements were carried out on the line, including an additional rail track between Aldo Bonzi and Libertad to increase the frequency of the services. The modernisation included the purchase of brand-new diesel locomotives manufactured by the American company Whitcomb in 1951 (with the addition of 15 new locomotives from the Dutch company Werkspoor in 1955) and the construction of junctions at the Tapiales and Aldo Bonzi stations that allowed the ex-BA Midland line to connect with the Sarmiento Railway near Haedo in Greater Buenos Aires.

During the 1950s, the increasing population in Greater Buenos Aires led the company to add more services. By December 1955, the Belgrano Railway ran more than 40 services per day along the Puente Alsina−Aldo Bonzi section. Nevertheless, the rolling stock had not been renewed since the 1930s and as a result, some railcars that had been damaged or destroyed in accidents were put out of service and were never replaced due to the lack of investment in purchasing new railcars.

In the late 1960s and early 1970s railcars manufactured by the Hungarian company Ganz Works were allocated to the Belgrano Sur. They had been acquired by the Argentine State Railway decades earlier and had been running on the northern Argentine railways since 1936. Some of them were used for local services to Libertad and the rest for the long-distance service to Carhué, departing from Buenos Aires station, the former Compañía Gral. de Buenos Aires terminus. The Ganz railcars ran services until 1977 when the line was definitively closed.

When the Libertad−Plomer section was closed, the ex-CGBA Buenos Aires station was made the terminus. Trains ran without passengers from Puente Alsina to Aldo Bonzi, running back to the Tapiales junction where they then went to the Buenos Aires station. Passengers waited and took the train in Buenos Aires, being carried to Carhué via Plomer. The lack of maintenance caused a progressive deterioration in the rolling stock and stations of the line. The line was closed in September 1977 and the workshops at Libertad were demolished.

On 2 March 1977, Decree N° 547 by de facto President of Argentina, Jorge Rafael Videla ordered the closure and dismantlement of more than 4,000 km of rail tracks. Several General Belgrano Railway lines were closed on 1 May 1977, although long-distance services to Carhué continued operating until August of that year when the last train ran to that city. Nevertheless, the closure of services in the region did not have a negative impact on the economy of the Province since the rail tracks ran through low-populated regions. Furthermore, most of that region was already served by other railway lines with better access to the city of Buenos Aires.


Privatisation: Metropolitano


With the railway privatisation in Argentina in the early 1990s, the Belgrano Sur line was granted in concession to the private company Metropolitano which started operations in 1994.[5] However, the Government of Argentina revoked the contract of concession in 2007 due to poor service standards and increasing complaints from users. Until then, the concessionary had been receiving near $30 million in subsidies per month.[6]

In the first years of private operation, many kilometres of the line were closed with stations and infrastructure abandoned.[7] In spite of the large government subsidies received by TMB (the Metropolitano's subsidiary that operated the line) a serious decline[8] in the standard of rail services led to the original concession being revoked. In 2007, the service was given in concession to the consortium Unidad de Gestión Operativa Ferroviaria de Emergencia (UGOFE).


Transition and new concession


The UGOFE took over the service until 12 February 2014, when it was announced that the Belgrano Sur and Roca lines would be granted to Argentren S.A., a company that was part of the Emepa Group and UGOFE was immediately dissolved.[9][10][11][12][13]


Renationalisation and investment


Diesel-electric rolling stock being phased-out of the line, 2015
Diesel-electric rolling stock being phased-out of the line, 2015

The State-owned company Trenes Argentinos took over Belgrano Sur line (operated by Argentren) after the Government of Argentina rescinded the contracts signed with the company on 2 March 2015. The contract terms specified that the concession could be cancelled with no right to claim compensation.[14] The agreements had been signed in February 2014, committing Argentren and Corredores Ferroviarios to operate the lines.[15][16][17]

In September 2013, the Government of Argentina announced that 23 brand-new railcars were to be acquired from the Chinese company CNR Dalian.[18] The first batch of the new rolling stock was expected to be available from May 2015[19][20][21] but only arrived in Buenos Aires in July. It was then announced that the new rolling stock had been would begin running on the Buenos Aires - Gonzalez Catán route in August.[22] The other parts of the line received the new rolling stock before the end of 2015, as the railcars arrived in the country.[23]

It was also announced that all the 28 stations of the line would be remodelled.[24] The cost of the investment was estimated in A$ 1,200 million.[25] The platforms of the stations would be elevated to match the height of the new rolling stock, while the track was being refurbished on the line, with the Buenos Aires - Tapiales segment receiving completely new rails on concrete sleepers.[26] Twnty-four of the stations would be completely replaced using modular designs, while some single-track segments would be made into double-track segments.[27]

CNR train at Dr. Antonio Sáenz station in 2018
CNR train at Dr. Antonio Sáenz station in 2018

In 2015, two important extension works were also being considered. To the southwest, the section from González Catán to Marcos Paz (closed at the time of privatisation) were to be restored and reopened, extending that branch of the line after its 20-year closure whilst adding new overpasses and connecting the line with the Merlo - Lobos branch of the Sarmiento Line.[26][28] Similarly, there were also plans to bring the line further into the city, moving the terminus from Buenos Aires station to Constitucion railway station where it would connect with the Roca Line and Line C of the Buenos Aires Underground. The construction would use viaducts to avoid level crossings in the city and would be carried out in cooperation between the National Government and the Government of Buenos Aires.[27][29]

In August 2017, Trenes Argentinos suspended the Puente Alsina–Aldo Bonzi service due to a derailment near Puente Alsina station. Since then, the service has not been re-established. Because of that, the National Government ceded the lands occupied by the line to the Municipality of Lanús with the purpose of building a park there.[30][31]


Extensions


In December 2019, the branch "G" was extended 9 km from González Catán to 20 de Junio in La Matanza Partido. Passenger trains had not stopped in 20 de Junio since 1993, when services were reduced to reduce costs.[3]

In July 2021, the service was extended from González Catán to Marcos Paz in the Buenos Aires Province.[2][32]


Historic operators


Companies that have operated the Belgrano Sur Line since it was established after the 1948 nationalisation are:

Operator Period
Ferrocarriles Argentinos1948–1991
FEMESA1991–1994
Metropolitano1994–2007
UGOFE2007–2014
Argentren2014–2015
Trenes Argentinos2015–present

Rolling Stock


In August 2015, the first diesel multiple units (DMUs) acquired from CNR Tangshan were put into service.[33] This rolling stock consists of 81 cars, which make up a total of 27 DMUs composed of three cars each and were to be phased-in throughout the year until all the railcars were the Chinese-made DMUs.[34]

Prior to the complete replacement of the existing rolling stock by the Chinese DMUs, the line consisted of a variety of diesel locomotives pulling carriages in a number of different combinations. The introduction of the new rolling stock has doubled the line's passenger capacity.[35]


Services


The Belgrano Sur line operates the following DMU services:

Start End Dist./Km. Former company
Dr. A. Sáenz [note 1]Marcos Paz
52
Compañía General
Marinos Crucero Gral. Belgrano
43
Midland

See also



Notes


  1. The Buenos Aires station was closed in 2018 due to the construction of a viaduct. Therefore Dr. Sáenz became terminus of the line.

References


  1. https://servicios.transporte.gob.ar/gobierno_abierto/detalle.php?t=acancelaciones&d=linea.
  2. El tren Belgrano Sur llegó a Marcos Paz después de 28 años on Government of Argentina, 29 Jul 2021
  3. El tren Belgrano Sur vuelve a llegar a la estación 20 de Junio tras 26 años sin servicio, Télam, 1 Dec 2019
  4. Estadísticas del transporte ferroviario - Total 2014 Archived 2015-06-12 at the Wayback Machine, CNRT website - Ministry of Transport
  5. ""Sobre LBS" on Argentren website". Archived from the original on 2015-02-27. Retrieved 2015-02-26.
  6. "Kirchner le quitó la concesión de trenes a Metropolitano", La Nación, 22 May 2007
  7. Un grupo de amigos quiere recuperar el recorrido del Belgrano Sur hasta Marcos Paz - Hora De Informarse, 5 March 2009.
  8. Sagasti, Ramiro (2008). "La odisea de viajar en tren..." La Nación (in Spanish). Retrieved 2008-03-03.
  9. "Trenes: le dan a Roggio el Mitre y el San Martín y a Emepa, el Roca y el Belgrano Sur", La Nación, 12 Feb 2014
  10. "Las privadas volverán a operar la mayoría de las líneas ferroviarias", Clarín, 12 Feb 2014
  11. "El Gobierno estableció un nuevo régimen de operaciones de las líneas ferroviarias", Telam, 12 Feb 2014
  12. "De a uno por línea, para mejor control", Página 12, 12 Feb 2014
  13. "Metrovías operará las líneas Mitre y San Martín", En el Subte, 12 Feb 2014
  14. "Ya está lista la ley que prevé más control estatal sobre los trenes", Clarín, 5 Mar 2015
  15. "Estado rescindió contrato de trenes a privados y avisó que no pagará indemnizaciones", Ambito Financiero, 2 Mar 2015
  16. "Buenos Aires commuter routes renationalised", Railway Gazette, 3 Mar 2015
  17. Resolution N° 171/2015 - Official Bulletin of Argentina Archived 2015-07-21 at the Wayback Machine
  18. "Trenes para el Sur", Página/12, 26 Sep 2013
  19. "Estos son los nuevos coches para la línea Belgrano Sur", Infonews, 26 Sep 2014
  20. "Randazzo recibió trenes para la línea Belgrano Sur", Ministry of Transport, 7 Jul 2015
  21. "Llegaron los trenes nuevos para el Belgrano Sur", Diario Jornada, 7 Jul 2015
  22. En agosto comenzarán a funcionar nuevos trenes en la línea Belgrano Sur - La Nacion, 29 July 2015.
  23. Randazzo anunció que en agosto comenzarán a funcionar trenes 0Km en el Belgrano Sur - Ministerio del Interior, 29 July 2015.
  24. First Belgrano Sur DMUs arrive - Railway Gazette, 8 July 2015.
  25. "Randazzo presentó nuevos trenes para la línea Belgrano Sur", Telam, 19 Apr 2014
  26. Arribaron al puerto primeros coches motores CNR para el Belgrano Sur - EnElSubte, 6 July 2015.
  27. Informe de Obras Archived 2014-11-07 at the Wayback Machine - ADIFSE
  28. Vuelve el tren a 20 de Junio tras 20 años - Diario Popular, 30 May 2014.
  29. Elevarán las trazas del ferrocarril San Martín y del Belgrano Sur - InfoBAE, 16 December 2014.
  30. Quieren convertir el suspendido ramal Alsina-Bonzi en un parque lineal, 16 Jul 2019
  31. Confirman la clausura definitiva del ramal Alsina-Bonzi para construir un parque on Observatorio AMBA, 15 Aug 2019
  32. El ferrocarril Belgrano Sur ya llega a Marcos Paz on Télam, 29 Jul 2021
  33. Presebtaron los nuevos trenes del Belgrano Sur Archived 2015-09-11 at the Wayback Machine - InfoNews, 25 August 2015.
  34. Randazzo puso en marcha servicios 0Km del Belgrano Sur Archived 2015-09-24 at the Wayback Machine - Gente BA, 26 August 2015.
  35. Randazzo presentó el nuevo servicio 0km de la línea Belgrano Sur y anunció que se convertirá en "el tren de los trabajadores con dignidad" - Ministerio del Interior y Transporte, 25 August 2015.





Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии