Yuangang Station (Chinese: 员岗站) is a station of Line 7 on the Guangzhou Metro. The station is situated under Xingnan Avenue (兴南大道), located in Panyu District, Guangzhou. It began operations on 28 December 2016.
Yuangang 员岗 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() Platform of the station | |||||||||||
Chinese name | |||||||||||
Simplified Chinese | 员岗站 | ||||||||||
Traditional Chinese | 員崗站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Panyu District, Guangzhou, Guangdong China | ||||||||||
Coordinates | 23°00′57″N 113°21′56″E | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
History | |||||||||||
Opened | 28 December 2016 | ||||||||||
Services | |||||||||||
| |||||||||||
G | Street level | Exit |
L1 Concourse |
Lobby | Customer Service, Vending Machines, Security Office |
L2 Platforms |
Platform 2 | ![]() |
Island platform, doors will open on the left | ||
Platform 1 | 7 towards Higher Education Mega Center South (Banqiao) ![]() |
Yuangang station currently has five exits, and exit F is under construction.[1]
Exit number | Exit location | |
---|---|---|
Exit A | Xingnan Avenue | |
Exit B | Xingnan Avenue | |
Exit C | Xingnan Avenue | |
Exit E | Xingnan Avenue | |
Exit G | Xingnan Avenue |
When Line 7 was originally planned, there were two stations situated under Xingnan Avenue--Guantang Station (Chinese: 官堂站) and Jingkeng Station (Chinese: 金坑站). To accommodate the construction of the Nanda Highway, Line 7 in the Xingnan Avenue section had to lay under the north side of the road, so the original Guantang station did not have enough space to build, and then it merged with the Jinkeng station and moved to the current location.[2]
On November 28, 2013, the station began construction.[3] In July 2014, the station was formally renamed as Yuangang Station (Chinese: 员岗站).[4] The main structure of the station was completed in early August 2015,[5] and it opened on December 28, 2016.