Uttara North Metro Station is a metro rail station under construction by the Dhaka Metro Railway. This station is located in Uttara, a suburb of Dhaka. It is estimated that the station will be inaugurated in December 2022[1] to run metro rail. The station belongs to MRT Line 6.[2]

Uttara North

উত্তরা উত্তর
Station of Dhaka Metro Rail
General information
Other namesStation 1
LocationAvenue 2, Sector 15, Uttara, Dhaka
Bangladesh
Owned byDhaka Mass Rapid Transit Company Ltd.
Line(s)Line 6
PlatformsSide platform
Tracks2
Construction
Structure typeRaised
Platform levels4
Bicycle facilitiesno
History
Opening2022
Services
Preceding station   Dhaka Metro Rail   Following station
Terminus   Line 6   Uttara Center
Location

History


The Uttara North Metro Station was constructed under "Package CP-03". The notification of application for construction of raised bridges for stations and railways was published on 30 June 2015 and the last date for submission of applications was 9 September 2015. Italian-Thai Development Public Company Limited gets work contract for "Package CP-03". The agreement document was sent to the ministry on 29 March 2016 for NBR investigation and law and parliamentary investigation. The signing ceremony for the agreement package was held on 3 May 2017 at the Pan Pacific Sonargaon Hotel in Dhaka. Construction work started on 2 August 2017.[3][4]


Station



Station layout


G Path level Exit / Entry
L1 Between Rent control, station agent, metro card vending machine, crossover
L2 Side platform no. 1, The left door will open
Southbound towards → Uttara Center
Northbound towards ←Train marginal← ←
Side platform no. 2, The left door will open
L2

References


  1. Tuhin Shubhra Adhikary (6 June 2021). "Uttara-Agargaon Metro Rail: Launch now aimed at Dec 2022". The Daily Star. Archived from the original on 17 July 2021. Retrieved 15 January 2022.
  2. "Entire phase-1 of MRT-6 now visible". The Daily Star. 1 March 2021. Archived from the original on 2 November 2021. Retrieved 15 January 2022.
  3. "CP-03, CP-04 (Viaduct & Stations, Uttara-Agargaon)". 17 March 2020. Archived from the original on 15 January 2022. Retrieved 15 January 2022.
  4. "Construction of Metro rail and station starts today". The Asian Age. 2 August 2017. Archived from the original on 15 January 2022. Retrieved 15 January 2022.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии