Tuqiao[1] (simplified Chinese: 土桥站; traditional Chinese: 土橋站; pinyin: Tǔqiáo Zhàn) is a station on the Batong line (through operation to Line 1) of the Beijing Subway. It opened on December 27, 2003.
Tuqiao 土桥 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
Platform | |||||||||||
| General information | |||||||||||
| Location | East Jiukeshu Road (九棵树东路) Tongzhou District, Beijing China | ||||||||||
| Coordinates | 39°52′18″N 116°41′10″E | ||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
| Line(s) | Batong line (through operation to Line 1) | ||||||||||
| Platforms | 2 (2 side platforms) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated | ||||||||||
| Disabled access | Yes | ||||||||||
| Other information | |||||||||||
| Station code | BT13 | ||||||||||
| History | |||||||||||
| Opened | December 27, 2003 | ||||||||||
| Services | |||||||||||
| |||||||||||
| Location | |||||||||||
Tuqiao Location in Beijing | |||||||||||
Tuqiao is on the eastern stretch of the 5th Ring Road and there is an exit there.
The station has 2 elevated side platforms.

There are 3 exits, lettered A, B, and C. Exit A is accessible.
Beijing Subway stations | |
|---|---|
| Batong line |
|
Stations that are proposed, under planning or under construction are shown in italics. | |
This article related to the Beijing Subway is a stub. You can help Wikipedia by expanding it. |