Tuqiao[1] (simplified Chinese: 土桥站; traditional Chinese: 土橋站; pinyin: Tǔqiáo Zhàn) is a station on the Batong line (through operation to Line 1) of the Beijing Subway. It opened on December 27, 2003.
Tuqiao 土桥 ![]() | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() Platform | |||||||||||
General information | |||||||||||
Location | East Jiukeshu Road (九棵树东路) Tongzhou District, Beijing China | ||||||||||
Coordinates | 39°52′18″N 116°41′10″E | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Batong line (through operation to Line 1) | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | BT13 | ||||||||||
History | |||||||||||
Opened | December 27, 2003 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
![]() ![]() Tuqiao Location in Beijing |
Tuqiao is on the eastern stretch of the 5th Ring Road and there is an exit there.
The station has 2 elevated side platforms.
There are 3 exits, lettered A, B, and C. Exit A is accessible.
Beijing Subway stations | |
---|---|
Batong line |
|
Stations that are proposed, under planning or under construction are shown in italics. |
This article related to the Beijing Subway is a stub. You can help Wikipedia by expanding it. |