Tengah Park MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line located along the boundary of Tengah and Bukit Batok planning areas, Singapore.[1][2][3]
JE2
Tengah Park 登加公园 தெங்கா பூங்கா Tengah Park | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
![]() Tengah Park MRT station site | |||||||||||
General information | |||||||||||
Coordinates | 1°21′08″N 103°44′12″E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Line(s) | Jurong Region Line | ||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 1 | ||||||||||
Parking | Yes | ||||||||||
Bicycle facilities | Yes | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2028; 6 years' time (2028) | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
![]() ![]() Tengah Park Tengah Park station in Singapore |
On 9 May 2018, LTA announced that Tengah Park station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 2, JRL (East), consisting of 7 stations between Tengah and Pandan Reservoir, and is expected to be completed in 2028.[4]
Contract J108 for the design and construction of Tengah Park Station and associated viaducts was awarded to John Holland Pty Ltd – McConnell Dowell South East Asia Pte Ltd Joint Venture (JV) at a sum of S$265.4 million in March 2020. Construction will start in 2020, with completion in 2028.[5][6] Contract J108 also includes the design and construction of Tengah Plantation station and Bukit Batok West station, and associated viaducts.[7][8]
Initially expected to open in 2027, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2028.[9]
The station complex will be situated next to Bukit Batok Road, before the junction with Bukit Batok West Avenue 3. It is located at the boundary between the Tengah and Bukit Batok planning area in the Brickworks Subzone,[10] opposite Dulwich College Singapore.
Access to the station will be via 5 exits on each side of Bukit Batok Road.[11]
MRT stations in Singapore | |||||||||
---|---|---|---|---|---|---|---|---|---|
Italicized stations are currently not in operation | |||||||||
Jurong Region |
| ||||||||
Depot(s) |
| ||||||||
|