Shibalihe (Chinese: 十八里河) is a metro station of Zhengzhou Metro Chengjiao line.
Shibalihe 十八里河 ![]() | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Zhengzhou Metro rapid transit station | |||||||||||
![]() | |||||||||||
General information | |||||||||||
Location | Xiaoliudong Village Guancheng, Zhengzhou China | ||||||||||
Coordinates | 34.6490°N 113.6775°E / 34.6490; 113.6775 | ||||||||||
Operated by | ![]() | ||||||||||
Line(s) |
| ||||||||||
Platforms | 4 (2 island platforms) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Other information | |||||||||||
Station code | 237 | ||||||||||
History | |||||||||||
Opened | 12 January 2017[1] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
![]() ![]() Shibalihe Location of the station in Zhengzhou |
The station has a station building where the station concourse is located on the ground level. The platforms are on the underground B1 level. The station has 2 parallel island platforms and 4 platforms in total. Currently only the inner 2 platforms are in use and the outer 2 platforms are not for service.
G | Concourse | Exits, Customer Service, Vending machines |
B1 Platforms |
Platform 4 | Reserved |
Island platform | ||
Platform 3 | ← Chengjiao line towards Jiahe (Nansihuan) | |
Platform 2 | → Chengjiao line towards Zhengzhou Hangkonggang Railway Station (Shawoli) → | |
Island platform | ||
Platform 1 | Reserved |
Exit | Destination | |
---|---|---|
Exit A | ||
Exit B | Chengnan Depot |
According to the plan, the station will become the southern terminus of Line 2 in the future, and cross-platform interchange between Line 2 and Line 9 (of which the first phase is called the Chengjiao line) at this station will be realized.
![]() | |
---|---|
Chengjiao line |
|
Stations that are under planning, under construction or not operational are shown in italics. |
![]() | This article about a railway station in Henan is a stub. You can help Wikipedia by expanding it. |