Karasay batyr (Kazakh: Қарасай батыр) is a planned Line 1 station of Almaty Metro.[2][3] The construction of the station is expected to start in 2019[4] and it will be located on Ashimov Street between Elibaev Street and Bayzak Batyr at the intersection of Abay Avenue and Momyshuly Street.
![]() | This article uses bare URLs, which are uninformative and vulnerable to link rot. (August 2022) |
![]() | This article needs additional citations for verification. (November 2017) |
Karasay batyr | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Almaty Metro rapid transit station | |||||||||||
General information | |||||||||||
Owned by | Almaty Metro | ||||||||||
Line(s) | Line 1 | ||||||||||
Platforms | 1 | ||||||||||
Other information | |||||||||||
Status | Planned | ||||||||||
History | |||||||||||
Opened | 2025[1] | ||||||||||
Services | |||||||||||
| |||||||||||
Almaty Metro Line A | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
This diagram:
|