Pingguoyuan station[1] (simplified Chinese: 苹果园站; traditional Chinese: 蘋果園站; pinyin: Píngguǒyuán zhàn) is a station on Line 1, Line 6 and Line S1 of the Beijing Subway, located in Pingguoyuan Subdistrict, Shijingshan District, Beijing.
![]() | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Line 6 platform | ||||||||||||||||
General information | ||||||||||||||||
Location | Pingguoyuan South Road (苹果园南路) Pingguoyuan Subdistrict, Shijingshan District, Beijing China | |||||||||||||||
Coordinates | 39°55′36″N 116°10′39″E | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corp., Ltd | |||||||||||||||
Line(s) | Line 1 (Closed until late 2023,[2] for renovation) Line 6 Line S1 | |||||||||||||||
Platforms | 6 (1 island platform and 2 side platforms, 2 side platforms under renovation) | |||||||||||||||
Tracks | 6 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground (Line 1 & Line 6) Elevated (Line S1) | |||||||||||||||
Disabled access | Yes | |||||||||||||||
Other information | ||||||||||||||||
Station code | 103 (Line 1) | |||||||||||||||
History | ||||||||||||||||
Opened | April 23, 1973; 49 years ago (1973-04-23) (Line 1) December 31, 2021; 5 months ago (2021-12-31)[3] (Lines 6 and S1) | |||||||||||||||
Closed | April 18, 2020; 2 years ago (2020-04-18) (Line 1) (for renovation until late 2023[2]) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Location | ||||||||||||||||
![]() ![]() Pingguoyuan[1] Location in Beijing |
The station for Line 1 was opened on April 23, 1973. Pingguoyuan station on Line 1 is closed for renovation from April 18, 2020 to late 2023.[2] The station for Line 6 and Line S1 was opened on December 31, 2021.
The Line 1 station and Line 6 station are underground, and the Line S1 station is elevated.
The line 1 of Pingguoyuan station has two underground side platforms and both are the only two platforms of Beijing Subway stations that haven't installed platform gates due to the aging of platform devices.
The station for Line 1 is closed for renovation, and the platform gates will be installed after the renovation is finished.[4]
There are 4 exits, lettered A, B, C, and D. All exits have a stairlift.[5]
且苹果园站是停运不停车,施工过程中还要确保地铁列车运行安全,所以施工进度有延迟。结构施工完成后还将进行机电设备、装修施工,预计在2023年底开通
Beijing Subway stations | |
---|---|
Line 6 |
|
Line S1 |
|
Stations that are proposed, under planning or under construction are shown in italics. |
This article related to the Beijing Subway is a stub. You can help Wikipedia by expanding it. |