Nakama Station (中間駅, Nakama-eki) is a railway station on the Chikuho Main Line operated by JR Kyushu in Nakama, Fukuoka Prefecture, Japan.[1]
Nakama Station 中間駅 | |
---|---|
![]() Nakama Station in 2008 | |
General information | |
Location | Japan |
Coordinates | 33°49′39″N 130°42′35″E |
Operated by | ![]() |
Line(s) | ■ Chikuhō Main Line |
Distance | 14.9 km from Wakamatsu |
Platforms | 1 side + 1 island platforms |
Tracks | 3 + 1 siding |
Construction | |
Structure type | At grade |
Parking | Available |
Other information | |
Status | Staffed ticket window (Midori no Madoguchi) limited hours |
Website | Official website |
History | |
Opened | 30 August 1891 (1891-08-30) |
Passengers | |
FY2016 | 1,868 daily |
Rank | 99th (among JR Kyushu stations) |
Location | |
![]() ![]() Nakama Station Location within Japan |
The station is served by the Chikuhō Main Line and is located 14.9 km from the starting point of the line at Wakamatsu.[2]
The station consists of a side and an island platform serving three tracks. A siding branches off track three.[2] The station building houses a staffed ticket window which is open for two hours in the morning only.[3]
← | Service | → | ||
---|---|---|---|---|
JR Kyūshū | ||||
Chikuhō Main Line | ||||
Higashi-Mizumaki | Local | Chikuzen-Habu |
On 30 August 1891, the privately run Chikuho Kogyo Railway opened a line from Wakamatsu to Nōgata. On the same day, Nakama was opened as an intermediate station along this track. On 1 October 1897, the Chikuho Kogyo Railway, now renamed the Chikuho Railway, merged with the Kyushu Railway. After the Kyushu Railway was nationalized on 1 July 1907, Japanese Government Railways (JGR) took over control of the station. On 12 October 1909, the station became part of the Chikuho Main Line. With the privatization of Japanese National Railways (JNR), the successor of JGR, on 1 April 1987, control of the station passed to JR Kyushu.[4][5]
On 4 March 2017, Nakama, along with several other stations on the line, became a "Smart Support Station". Under this scheme, the ticket counter opening hours at Nakama were reduced to two hours in the morning between 0630 and 0830 hours. At other times, the station would be unstaffed. Tickets would have to be purchased from automatic ticket vending machines and automatic ticket gates used to enter the platforms. Passengers requiring help would be able to communicate via intercom with staff at a central support centre which is located at Nakama itself.[3]
In fiscal 2016, the station was used by an average of 1,868 passengers daily (boarding passengers only), and it ranked 99th among the busiest stations of JR Kyushu.[6]
![]() |
Wikimedia Commons has media related to Nakama Station. |
Stations of the Chikuhō Main Line | |
---|---|
Wakamatsu Line |
|
Fukuhoku Yutaka Line | |
Haruda Line |
|
![]() | This Fukuoka Prefecture railroad station-related article is a stub. You can help Wikipedia by expanding it. |