railroad.wikisort.org - Station

Search / Calendar

Mahendragarh railway station, station code MHRG, is a major railway station of the Indian Railways serving the city of Mahendragarh in the Indian state of Haryana. It is in the Bikaner Division of the North Western Railway zone and lies on the Delhi–RewariBikaner route.[1][2]

Mahendragarh Station
Indian Railways station
The station in 2008
General information
LocationStation Road, Rewari, Haryana
India
Coordinates28°16′51″N 76°08′53″E
Elevation246 metres (807 ft)
Owned byIndian Railways
Operated byIndian Railways
Line(s)Delhi–Bikaner line
Platforms2
Tracks12
Bus routes1
Construction
Structure typeTerminus
ParkingAvailable (paid)
Other information
StatusFunctional
Station codeMHRG
Zone(s) North Western Railway zone
Division(s) Bikaner
History
Opened1940
Rebuilt2009–11
ElectrifiedElectrified
Passengers
1000–2000
Location
Mahendragarh Station
Location within Haryana
Mahendragarh Station
Mahendragarh Station (India)

Location


Mahendragarh railway junction station is located 114 kilometres (71 mi) southwest of old Delhi and 100 kilometres (62 mi) southwest of the nearest large airport is located at New Delhi.


History


The main railway line from Bikaner Junction to Rewari Junction was originally built by Jodhpur–Bikaner Railway company of Bikaner Princely State portion as metre-gauge line during the 19th and 20th century also. This line was opened in different phases during the construction period. The first phase, from Bikaner Junction to Ratangarh Junction which also called as Bikaner–Ratangarh chord line was opened on 24 November 1912. The second phase, from Ratangarh Junction to Churu Junction was opened on 22 May 1910. The third phase, from Churu Junction to Sadulpur Junction was opened on 8 July 1911. The fourth phase, from Sadulpur Junction to Rewari Junction was sanctioned on 4 March 1937 and after opened at 1 March 1941.


Beginning and growth


Mahendragarh railway station was purposed in 1896 and established in 1940 Delhi–Rewari–Bikaner railway line was transferred to Bikaner Division of newly formed Northern Railway zone in 1952.


Gauge conversion


After that, the conversion into 5 ft 6 in (1,676 mm) broad gauge was completed through into different section starting from the first section between Rewari Junction to Sadulpur Junction was opened on 17 September 2008, later the second section between Sadulpur Junction and Ratangarh Junction was opened on 1 August 2010 and thereafter the third section between Ratangarh Junction and Bikaner Junction was opened on 30 March 2011.


Electrification


Electrification of main line was started on 11 February 2019, on the first section between Rewari and Sadulpur which was declared on 2017-18 rail budget, was completed on 4 March 2020, with two stages. and the remaining sections such as Sadulpur–Churu, Churu–Ratangarh and Ratangarh–Bikaner is going under electrification.


Trains


The following is a list of a few trains stopping at Rewari railway station.[3]

Train no.Train nameFromToScheduled dep
19727Sikar - Rewari ExpressSikarRewari08:35

See also



References





Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии