Lota railway station is located on the Cleveland line in Queensland, Australia. It serves the Brisbane suburb of Lota.
Lota | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Southbound view in August 2012 | |||||||||||
General information | |||||||||||
Location | Railway Terrace, Lota | ||||||||||
Coordinates | 27°28′12″S 153°11′19″E | ||||||||||
Owned by | Queensland Rail | ||||||||||
Operated by | City network | ||||||||||
Line(s) | Cleveland | ||||||||||
Distance | 25.87 kilometres from Central | ||||||||||
Platforms | 2 (1 island) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Ground | ||||||||||
Parking | 20 bays | ||||||||||
Bicycle facilities | Yes | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | 600269 (platform 1) 600270 (platform 2) | ||||||||||
Fare zone | go card 2 | ||||||||||
Website | TransLink | ||||||||||
History | |||||||||||
Opened | 1889 | ||||||||||
Rebuilt | 1995 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
In 1889, the Cleveland line was extended from Manly to the original Cleveland station.[1][2]
On 1 November 1960, Lota became the terminus of the line when it was curtailed.[3] The line from Lota to Cleveland was rebuilt, and reopened on a new alignment to Thorneside on 25 September 1982 and Cleveland on 24 October 1987.[4][5][6]
In 1995, the timber building was replaced by a brick structure and a crossing loop added.[5] In 2006 the wooden rail bridge leading to the station from the north was replaced with a concrete bridge.[7]
Lota is served by Cleveland line services from Shorncliffe, Northgate, Doomben and Bowen Hills to Cleveland.[8]
Platform | Line | Destinations | Notes |
---|---|---|---|
1 | Cleveland | Cleveland (Peak hour only) | [9] |
2 | Cleveland | Bowen Hills, Cleveland, Northgate, Doomben & Shorncliffe | [10] |
Queensland Rail railway stations | |||||
---|---|---|---|---|---|
| |||||
| |||||
| |||||
| |||||
| |||||
Stations and services in italics are planned or under construction |