Grey Nuns stop is a tram stop under construction in the Edmonton Light Rail Transit network in Edmonton, Alberta, Canada. It will serve the Valley Line, and is located on the east side of 66 Street, north of 31 Avenue NW, between Kameyosek and Tawa.[1] The stop is scheduled to open in 2022.[2]
Grey Nuns | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Edmonton LRT stop | |||||||||||
![]() | |||||||||||
General information | |||||||||||
Coordinates | 53°27′46″N 113°26′4″W | ||||||||||
Owned by | City of Edmonton | ||||||||||
Platforms | Side-loading platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Surface | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2022 | ||||||||||
Future services | |||||||||||
| |||||||||||
|
Edmonton Transit Service LRT stations | ||
---|---|---|
List of Edmonton LRT stations | ||
Capital Line |
| ![]() |
Metro Line |
| |
Valley Line (2022) |
| |
Canada portal |