railroad.wikisort.org - Station

Search / Calendar

Finch–Kennedy GO Station (also referred to as Finch East) is a planned commuter train station in Toronto, Ontario, Canada. It will be an infill station on the Stouffville line of GO Transit in Scarborough, between Milliken GO and Agincourt GO. The station is one of five GO stations to be built as part of the SmartTrack Stations Program to adapt regional commuter service for urban public transit.[2] Construction will start in 2022 for completion in 2026.[1]

Finch–Kennedy
General information
LocationFinch Avenue east of Kennedy Road
Toronto, Ontario
Coordinates43°48′09.3″N 79°17′30.0″W
Owned byMetrolinx
PlatformsSide platforms
Tracks2
Connections
Construction
Disabled accessYes
History
Opening2026[1]
Services
Preceding station GO Transit Following station
Agincourt Stouffville
Planned expansion
Milliken
towards Old Elm
Metrolinx exhibits
Artist rendition of Finch–Kennedy GO Station, aerial perspective
Artist rendition of Finch–Kennedy GO Station at street level

A grade separation will be built prior to the construction of the station. The station will be located between Midland Avenue and Milliken Boulevard, and the station's main building on the north side of Finch Avenue East, on the east side of the railway right-of-way. The station will have two side platforms with canopies and heated shelters. From a new signalized intersection at Baylawn Drive and Finch Avenue, a new access road will provide vehicular access to the main station building where an accessible pedestrian pickup/drop-off area and bicycle parking will be located. Finch Avenue will be widened to six lanes under the railway bridge. The two curb lanes will be for buses only, able to accommodate three articulated buses in each direction. Bus riders from either direction can access either station platform via four access points below the railway bridge, each access point having stairs and an elevator. In addition to the six lanes, there will be pedestrian sidewalks and bicycle lanes under the bridge. The station will have a service building on the west side of the tracks opposite the main station building.[3][1]

The following TTC bus routes are expected to serve the new station:[1]


References


  1. "SmartTrack Finch-Kennedy GO Station - LIVE Event". Metrolinx. November 29, 2021. p. 00:31:24.
  2. "SmartTrack Stations Program". Metrolinx. Retrieved December 9, 2021.
  3. "SmartTrack stations program technical update" (PDF). City of Toronto. Retrieved March 27, 2021.





Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии