Diggers Rest railway station is located on the Sunbury line in Victoria, Australia. It serves the north-western Melbourne suburb of Diggers Rest, and it opened on 2 October 1859.[1]
Diggers Rest | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
PTV commuter rail station | |||||||||||
Southbound view from Platform 2 in November 2012 | |||||||||||
General information | |||||||||||
Location | Old Calder Highway, Diggers Rest, Victoria 3427 City of Melton Australia | ||||||||||
Coordinates | 37°37′37″S 144°43′12″E | ||||||||||
Owned by | VicTrack | ||||||||||
Operated by | Metro Trains | ||||||||||
Line(s) | Sunbury | ||||||||||
Distance | 32.69 kilometres from Southern Cross | ||||||||||
Platforms | 2 side | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus | ||||||||||
Construction | |||||||||||
Structure type | Ground | ||||||||||
Parking | 550 | ||||||||||
Bicycle facilities | Yes | ||||||||||
Disabled access | Yes—step free access | ||||||||||
Other information | |||||||||||
Status | Operational, Unstaffed | ||||||||||
Station code | DIT | ||||||||||
Fare zone | Myki Zone 2 | ||||||||||
Website | Public Transport Victoria | ||||||||||
History | |||||||||||
Opened | 2 October 1859; 163 years ago (1859-10-02) | ||||||||||
Rebuilt | 2012 | ||||||||||
Electrified | 1500 V DC overhead (August 2012) | ||||||||||
Services | |||||||||||
| |||||||||||
Diggers Rest opened with the line on 2 October 1859, and was the terminus until the line was extended to Woodend in 1861. A small goods shed and siding were provided at that time. Interlocked gates were installed at the Calder Highway level crossing in 1928, and were replaced with boom barriers in 1982.[2] The goods siding was removed in 1989,[1] and the remaining crossover was removed in 1992.[1] The waiting room and booking lobby inside the building on Platform 1 were provided later in 1992[3] and, along with the former signal box, were restored in 2002, after being damaged by fire during the previous year.[4]
On 18 November 2012, the station was added to the metropolitan network, when the line between Watergardens and Sunbury was electrified.[5][6] As part of those works, the station was refurbished, with both platforms extended at the Up (Flinders Street) end. The car park was also enlarged.[7]
Diggers Rest has two side platforms. It is served by Sunbury line trains.[8]
Platform 1:
Platform 2:
It is planned that, by late 2025, trains on the Sunbury line will be through-routed with those on the Pakenham and Cranbourne lines, via the new Metro Tunnel.
Sunbury Bus Service operates one route via Diggers Rest station, under contract to Public Transport Victoria:
Public Transport Victoria railway stations | |||||
---|---|---|---|---|---|
| |||||
| |||||
| |||||
| |||||
|