Changping Xishankou Station (Chinese: 昌平西山口站; pinyin: Chāngpíng Xīshānkǒu Zhàn) is a station on the Changping Line of the Beijing Subway. It was opened on 26 December 2015.[1] It is the current northern terminus of the line as well as the northernmost station in the entire Beijing Subway.
Changping Xishankou 昌平西山口 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
Platform | |||||||||||
| General information | |||||||||||
| Location | Nanjian Road (南涧路) and Wanxi Road (万西路) Shisanling, Changping District, Beijing China | ||||||||||
| Coordinates | 40°14′41″N 116°11′43″E | ||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
| Line(s) | Changping line | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Underground | ||||||||||
| Disabled access | Yes | ||||||||||
| History | |||||||||||
| Opened | December 26, 2015; 6 years ago (2015-12-26) | ||||||||||
| Services | |||||||||||
| |||||||||||
| Location | |||||||||||
Changping Xishankou Location in Beijing | |||||||||||
The station has an underground island platform.
There are 4 exits, lettered A, B, C, and D. Exit B is accessible.
Beijing Subway stations | |
|---|---|
| Changping line |
|
Stations that are proposed, under planning or under construction are shown in italics. | |
Changping District | |||||
|---|---|---|---|---|---|
| Landmarks |
| ||||
| Transportation |
| ||||
| Education |
| ||||
This list is incomplete. Korean International School in Beijing was formerly in Changping district. | |||||
This article related to the Beijing Subway is a stub. You can help Wikipedia by expanding it. |