Buca Koop., short for Buca Kooperatif Evleri, is a proposed underground station on the Üçyol—Çamlıkule Line of the İzmir Metro. It will be located beneath 1401 Street in southeast Buca.[1] Construction of the station, along with the metro line, is expected to begin in 2020.[2] Buca Koop. was the original eastern terminus of the line until August 2016, when the line was extended one station further to Çamlıkule.[1]
Buca Koop. | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| İzmir Metro rapid transit station | ||||||||||||||||
| General information | ||||||||||||||||
| Location | 1401 Sk. Buca Koop. Mah., 35160 Buca | |||||||||||||||
| Coordinates | 38.369574°N 27.184939°E / 38.369574; 27.184939 | |||||||||||||||
| Owned by | İzmir Metropolitan Municipality | |||||||||||||||
| Operated by | İzmir Metro A.Ş. | |||||||||||||||
| Line(s) | 3 Alt | |||||||||||||||
| Tracks | 2 | |||||||||||||||
| Construction | ||||||||||||||||
| Disabled access | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | 2024; 2 years' time (2024) (expected) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
Buca Koop. station is expected to open in 2024.[2]
İzmir Metro stations | |
|---|---|
| Fahrettin Altay—Evka 3 Line |
|
| Fahrettin Altay—Kaymakamlık Line (2022) |
|
| Evka 3—Bornova Merkez Line (TBA) |
|
| Üçyol—Çamlıkule Line (TBA) |
|
| Adnan Menderes Airport—Stadyum Line (TBA) |
|
| Halkapınar—Otogar Line (TBA) | |
This article about a Turkish railway station is a stub. You can help Wikipedia by expanding it. |