Buca Koop., short for Buca Kooperatif Evleri, is a proposed underground station on the Üçyol—Çamlıkule Line of the İzmir Metro. It will be located beneath 1401 Street in southeast Buca.[1] Construction of the station, along with the metro line, is expected to begin in 2020.[2] Buca Koop. was the original eastern terminus of the line until August 2016, when the line was extended one station further to Çamlıkule.[1]
Buca Koop. | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
İzmir Metro rapid transit station | ||||||||||||||||
General information | ||||||||||||||||
Location | 1401 Sk. Buca Koop. Mah., 35160 Buca | |||||||||||||||
Coordinates | 38.369574°N 27.184939°E / 38.369574; 27.184939 | |||||||||||||||
Owned by | İzmir Metropolitan Municipality | |||||||||||||||
Operated by | İzmir Metro A.Ş. | |||||||||||||||
Line(s) | 3 Alt | |||||||||||||||
Tracks | 2 | |||||||||||||||
Construction | ||||||||||||||||
Disabled access | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 2024; 2 years' time (2024) (expected) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Buca Koop. station is expected to open in 2024.[2]
İzmir Metro stations | |
---|---|
Fahrettin Altay—Evka 3 Line |
|
Fahrettin Altay—Kaymakamlık Line (2022) |
|
Evka 3—Bornova Merkez Line (TBA) |
|
Üçyol—Çamlıkule Line (TBA) |
|
Adnan Menderes Airport—Stadyum Line (TBA) |
|
Halkapınar—Otogar Line (TBA) |
![]() | This article about a Turkish railway station is a stub. You can help Wikipedia by expanding it. |