railroad.wikisort.org - Station

Search / Calendar

Baseline is a public transit station directly across from the main campus of Algonquin College in Ottawa's west end, near the intersection of Woodroffe Avenue and Baseline Road.[1] Many Algonquin College students and Centrepointe residents use this station to get to various points in the city, and to and from the college. Several residential and business areas such as Centrepointe and College Square are also served by this station.

Baseline
Ottawa Transitway station
General information
LocationOttawa, Ontario
Canada
Coordinates45°20′51″N 75°45′39″W
Owned byOC Transpo
History
Opened1984 (original station), 1 October 2009 (temporary location), 2025 (future)
Services
Preceding station OC Transpo Following station
Fallowfield
toward Riverview
Route 74 Iris
Fallowfield
toward Cambrian
Route 75

It is also a major transfer point for communities in the inner southwest part of Ottawa, making it one of the busiest stations. A small park and ride is also located here, which was the terminus for route 95 for many years until it was extended to Barrhaven. After this station, Route 74 and 75 buses leave the Transitway to travel on reserved bus lanes on Woodroffe Avenue, and re-enter the Transitway at the Nepean Sportsplex. Baseline Station was the first station to be constructed in 1983 when the Transitway was undergoing initial construction.


Expansion


[needs update]

The original Baseline Station, prior to moving
The original Baseline Station, prior to moving

Baseline station has undergone a series of renovations, as part of the expansion of the Southwest Transitway, expansion of Algonquin College and future proofing for the expansion of the Line 1 LRT. The current station involved the construction of a temporary station west of the original station, making room for the new Algonquin Centre for Construction Excellence (ACCE).[2] The ultimate concept for the updated BRT station loop south of the LRT station will allow passengers to transfer from buses when the Line 1 extension is completed in 2025.[3]


Phase 1A (May 2009 – August 2011)


The construction underway at Baseline Station, with the BRT/LRT tunnel to the left, and the new Algonquin College building to the right
The construction underway at Baseline Station, with the BRT/LRT tunnel to the left, and the new Algonquin College building to the right

Phase 1B (April 2010 – November 2010)



Phase 2 (2011–2013)



Light rail expansion and integration (2019–2025)



Service


The following routes currently serve Baseline:

O-Train
 R1   R2  O-Train replacement bus routes
 98   39  Rapid routes
 N75  Night routes
 40   11  Frequent routes
 55   162  Local routes
 284  Connexion routes
 405  300s: Shopper routes
400s: Event routes
600s: School routes
Additional info:
  • Line 1: O-Train Confederation Line
  • Route 2: Trillium Line (currently a bus route)
     
  • Routes 5 to 99: connect to Line 1 and/or Route 2
  • Routes 100 to 199: connect to Transitway
  • Routes 200 to 299: Connexion (peak periods only)
  • Routes 301 to 305: Shopper (limited rural service)
  • Routes 404 to 406: Canadian Tire Centre events
  • Routes 450 to 456: Lansdowne Park events
  • Routes 602 to 698: high schools
     
  • Route R1: replaces Line 1 when out of service
  • Route R2: alternative name for current Route 2
  • Routes N39 to N97: night service (replaces Line 1)
  • White backgrounds: service may be limited
     
  • Last two digits represent service area:
Baseline Station service
Rapid routes 74   75 
Frequent routes

 87   88   111 

Local routes 73   82   83   84   86   186   187 
Connexion routes 270   271   272   273   277   278   284 
Shopper routes 305 
Event routes 406   456 
School routes 83   88   111   187   686   688 

References


  1. "Baseline" (PDF). Station Layout. OC Transpo. September 2015. Retrieved 1 March 2016.
  2. "Home".
  3. "City of Ottawa - Southwest Transitway Extension (Baseline Rd. To Norice St.)". Archived from the original on 2010-08-16. Retrieved 2010-07-02.>
  4. Environmental Assessment Study for a Line 1 Extension to Barrhaven
  5. Stage 3 LRT expansion plans
  6. "Baseline (2025) - O-Train Fans". www.otrainfans.ca. Retrieved 2019-12-19.


Media related to Baseline Station at Wikimedia Commons




Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии