Aldermaston railway station serves the village of Aldermaston in Berkshire, England. The station is at nearby Aldermaston Wharf and about 2 miles (3 km) north of Aldermaston village. It is 44 miles 63 chains (44.79 miles, 72.08 km) measured from London Paddington.
Aldermaston ![]() | |
---|---|
The station from the footbridge, with a Network Turbo train of First Great Western passing through. | |
General information | |
Location | Aldermaston Wharf, West Berkshire England |
Grid reference | SU601673 |
Managed by | Great Western Railway |
Platforms | 2 |
Other information | |
Station code | AMT |
Classification | DfT category F1 |
History | |
Original company | Great Western Railway |
Pre-grouping | GWR |
Post-grouping | GWR |
Key dates | |
21 December 1847 | opened |
Passengers | |
2016/17 | ![]() |
2017/18 | ![]() |
2018/19 | ![]() |
2019/20 | ![]() |
2020/21 | ![]() |
Notes | |
Passenger statistics from the Office of Rail and Road |
It was opened on 21 December 1847.[1]
Aldermaston station is between the A4 road and the settlement of Aldermaston Wharf. It has a flanking platform on each side of the double track line. Each platform has its own independent road access and car park, together with a small shelter. The two platforms are also linked by a footbridge. The Newbury-bound platform is flanked on its offside by a siding, formerly used as a headshunt for access to a nearby freight facility. This siding is now defunct as the new A340 road bridge over the railway line has been built on the track in 2012.
The station was built by the Berks and Hants Railway, part of the Great Western Railway and stayed with that company after the Grouping of 1923. The line then became part of the Western Region of British Railways upon the subsequent nationalisation of the railways.
When Sectorisation was introduced, the station was served by Network SouthEast although trains of the Intercity Sector passed on the Reading to Taunton Line which uses the Berks and Hants to Westbury for some long-distance services. This continued until the Privatisation of British Railways.
A 10.5-mile (16.9 km) branch line connecting Aldermaston to the Didcot, Newbury and Southampton Railway (DN&SR) at Burghclere was proposed.[2][3] The line was authorised by an Act of Parliament but never built.[4] This is because the railway finances were loaned by the London and South Western Railway, who stipulated that the DN&SR must relinquish their sole rights to run Southampton-bound services on the line and to also abandon its plans for a link at Aldermaston with the Great Western Railway.[5][6] The proposed route roughly followed the Enborne valley, passing south of Brimpton, before following the Gaily Brook and West Clere Scarp near Kingsclere on to Old Burghclere.[6]
The station is served by local services operated by Great Western Railway between Reading and Newbury or Bedwyn. Trains run hourly in both directions on Mondays to Saturdays, and on Sundays service is about every 2 hours. Typical journey times are about 15 minutes to Reading and 16 minutes to Newbury. Passengers for London Paddington must normally change trains at Reading, though there are a small number of weekday peak through trains and a regular service on Sundays.[7]
Preceding station | ![]() |
Following station | ||
---|---|---|---|---|
Theale | Great Western Railway Reading - Newbury |
Midgham |
![]() |
Wikimedia Commons has media related to Aldermaston railway station. |
Railway stations in Berkshire | |
---|---|
Great Western Main Line |
|
Reading–Taunton line |
|
Waterloo–Reading line |
|
North Downs Line |
|
Reading–Basingstoke line |
|
Staines–Windsor line |
|
Slough–Windsor & Eton line |
|
Henley branch line |
|
Marlow branch line |
|