railroad.wikisort.org - StationGilbert Rd/Main Street is a light rail station in Mesa, Arizona, on the Valley Metro system serving Phoenix and surrounding areas. It opened to revenue service on May 18, 2019, becoming the new terminus of the light rail line.[2][3] The station has a park-and-ride facility and a bus station that is served by local routes.[4]
Light rail station in Mesa, Arizona
|
---|
|
|
Location | Main Street and Gilbert Road, Mesa, Arizona United States |
---|
Coordinates | 33.41537°N 111.78762°W / 33.41537; -111.78762 |
---|
Owned by | Valley Metro |
---|
Operated by | Valley Metro Rail |
---|
Line(s) | Gilbert Road Extension |
---|
Platforms | 1 island platform |
---|
Tracks | 2 |
---|
Connections | Valley Metro Bus: 40, 45, 136[1] |
---|
|
Structure type | At-grade |
---|
Disabled access |  |
---|
|
Station code | 18178 |
---|
|
Opened | May 18, 2019 (2019-05-18) |
---|
|
|
Preceding station |
Valley Metro |
Following station |
Stapley/Main Street |
|
Valley Metro Rail |
|
Terminus |
|
|
|
|
The two-station 1.9-mile (3.1 km) Gilbert Road Extension began construction in November 2016 and was expected to cost $184 million.[5][6]
References
- "Valley Metro Rail" (PDF). Valley Metro. October 28, 2019. Retrieved April 5, 2020.
- "Gilbert Road Extension (Fact Sheet, Q3 2017)" (PDF). Valley Metro Rail. Retrieved October 5, 2017.
- "Celebrate with us on May 18! Two more miles of light rail open in Mesa. | Valley Metro". www.valleymetro.org. Retrieved May 20, 2019.
- "66 tons of water donated from light rail testing" (Press release). Valley Metro. April 3, 2019. Retrieved April 26, 2019.
- Coppola, Chris (November 29, 2016). "Construction starts on Mesa light-rail extension to Gilbert Road". Arizona Republic. Retrieved April 26, 2019.
- Ridenour, Shelley (August 19, 2015). "New light rail section unique to Mesa". The East Valley Tribune. Tempe, Az. Retrieved July 1, 2016.
Valley Metro |
---|
Rail |
- Valley Metro Rail
- Tempe Streetcar
|
---|
Bus | |
---|
Completed projects |
- Central Phoenix/East Valley Light Rail Line (2008)
- Central Mesa Extension (2015)
- Northwest Extension Phase I (2016)
- Gilbert Road Extension (2019)
- Tempe Streetcar (2022)
|
---|
Under construction or proposed projects |
- Northwest Extension Phase II (2024)
- South Central Extension (2024)
- Capitol/I-10 West Extension (Phase I: 2024, Phase II: 2030)
- West Phoenix/Central Glendale Extension
- Northeast Extension
|
---|
History |
- Phoenix Street Railway
- Salt River Valley Electric Railway
|
---|
Miscellaneous |
- Proposed commuter rail independent of Valley Metro
|
---|
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии