103rd[2][3] is a proposed rapid transit station for the Red Line as part of the Red Line Extension. The station is planned to open in 2029[4] if the CTA can get the funding for the $3.6 billion project.[5] The station would be constructed adjacent to the Union Pacific Railroad in Chicago's Roseland and Washington Heights neighborhoods.
103rd 10300S 400W | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Chicago 'L' rapid transit station | |||||||||||||
| General information | |||||||||||||
| Owned by | Chicago Transit Authority | ||||||||||||
| Line(s) | Dan Ryan branch | ||||||||||||
| Platforms | 1 | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Elevated | ||||||||||||
| History | |||||||||||||
| Opened | 2029 (planned)[1] | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
This article relating to the Chicago Transit Authority is a stub. You can help Wikipedia by expanding it. |